Ravenswood
38-54 Vernon Blvd, Long Island, NY 11101Plant Summary Information
Ravenswood is ranked #11 out of 1,045 power plants in New York in terms of total annual net electricity generation.
Ravenswood is comprised of 5 generators and generated 609.5 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Ravenswood |
|---|---|
| Utility Name | Ravenswood Operations LLC |
| Location | Queens County, NY |
| Initial Operation Date | February 1963 |
| Last Update | May 2026 |
| Annual Generation | 3.3 TWh |
| Annual Consumption | 33.1 M MMBtu |
| Ranked #349 out of 13,081 Power Plants Nationwide | |
| Ranked #238 out of 2,206 Natural Gas Power Plants Nationwide | |
| Ranked #11 out of 1,045 New York Power Plants | |
| Ranked #7 out of 114 New York Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 85.2% Distillate Fuel Oil : 14.8% |
| Previous Operators |
TC Ravenswood LLC (2013 to 2016) Helix Ravenswood, LLC (2017 to 2022) Ravenswood Operations LLC (2023 to 2025) |
Map of Ravenswood
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Ravenswood.
Monthly Net Generation for Ravenswood
Monthly Plant Fuel Consumption for Ravenswood
Ravenswood Details
| Summary Information | |
|---|---|
| Plant Name | Ravenswood (2500) |
| Plant Address | 38-54 Vernon Blvd, Long Island, NY 11101 |
| Utility | Ravenswood Operations LLC (61130) |
| Latitude, Longitude | 40.75917, -73.94611 |
| Generation Dates on File | Jan 2001 to May 2026 |
| Initial Operation Date | February 1963 |
| Annual Generation | 3.3 TWh |
| Fuel Types | Natural Gas : 85.2% Distillate Fuel Oil : 14.8% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 99-166-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | NPCC |
| Balancing Authority | New York Independent System Operator (NYIS) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | East River |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Consolidated Edison Co-NY Inc (4226) NY |
| Grid Voltage | 345.00 kV / 138.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | CONSOLIDATED EDISON NEW YORK INC |
| Natural Gas Storage | No |
Generator 1 Details Operating February 1963
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 400 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 364.5 MW |
| Winter Capacity | 370 MW |
| Minimum Load | 75 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | February 1963 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | OVER |
| Subcritical Technology | No |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 368.5 MW |
| Net Winter Capacity With Natural Gas | 375.8 MW |
| Net Summer Capacity With Oil | 368.5 MW |
| Net Winter Capacity With Oil | 375.8 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator 2 Details Operating May 1963
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 400 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 375.2 MW |
| Winter Capacity | 378.3 MW |
| Minimum Load | 75 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 1963 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | OVER |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 374.5 MW |
| Net Winter Capacity With Natural Gas | 374.4 MW |
| Net Summer Capacity With Oil | 374.5 MW |
| Net Winter Capacity With Oil | 374.4 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator 3 Details Operating June 1965
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 1027 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 985.1 MW |
| Winter Capacity | 976.8 MW |
| Minimum Load | 150 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 1965 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | OVER |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 987.3 MW |
| Net Winter Capacity With Natural Gas | 968.3 MW |
| Net Summer Capacity With Oil | 987.3 MW |
| Net Winter Capacity With Oil | 968.3 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator 4 Details Operating December 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CCR4 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 181 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 149.8 MW |
| Winter Capacity | 185.1 MW |
| Minimum Load | 115 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2003 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | OVER |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 150.4 MW |
| Net Winter Capacity With Natural Gas | 185.8 MW |
| Net Summer Capacity With Oil | 150.4 MW |
| Net Winter Capacity With Oil | 185.8 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator 4S Details Operating December 2003
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CCR4 |
| Ownership | Single Owner |
| Duct Burners | No |
| Nameplate Capacity | 87.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 72.4 MW |
| Winter Capacity | 89.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2003 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | OVER |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 72.8 MW |
| Net Winter Capacity With Natural Gas | 89.8 MW |
| Net Summer Capacity With Oil | 72.8 MW |
| Net Winter Capacity With Oil | 89.8 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Ravenswood Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #228 | Mesquite Generating Station Block 1 | Arlington, AZ | 3.0 TWh |
| #229 | Harrison County Power Project | Marshall, TX | 3.0 TWh |
| #230 | Hermiston Generating Plant | Hermiston, OR | 3.0 TWh |
| #231 | Decatur Energy Center | Decatur, AL | 3.0 TWh |
| #232 | Brunner Island | York Haven, PA | 4.1 TWh |
| #233 | R D Morrow | Purvis, MS | 2.9 TWh |
| #234 | ANP Blackstone Energy Project | Blackstone, MA | 2.9 TWh |
| #235 | Attala | Sallis, MS | 2.9 TWh |
| #236 | Intermountain Power Project | Delta, UT | 4.8 TWh |
| #237 | Port Westward | Clatskanie, OR | 2.8 TWh |
| #239 | Hidalgo Energy Center | Edinburg, TX | 2.8 TWh |
| #240 | Gila River Power Block 1 | Gila Bend, AZ | 2.8 TWh |
| #241 | Empire Generating Co LLC | Rensselaer, NY | 2.9 TWh |
| #242 | Elk Hills Power LLC | Tupman, CA | 2.8 TWh |
| #243 | Columbia Energy Center (SC) | Gaston, SC | 2.8 TWh |
| #244 | Jim Bridger | Point of Rocks, WY | 7.1 TWh |
| #245 | Lost Pines 1 Power Project | Bastrop, TX | 2.8 TWh |
| #246 | Hillabee Energy Center | Alexander City, AL | 2.8 TWh |
| #247 | RS Cogen | Lake Charles, LA | 2.7 TWh |
| #248 | East River | New York, NY | 2.7 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Ravenswood.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 59th Street | New York, NY | 101.0 MWh | 2.5 mi |
| 74th Street | New York, NY | 7.0 MWh | 0.7 mi |
| Astoria Energy | New York, NY | 4.0 TWh | 3.1 mi |
| Astoria Energy II | Astoria, NY | 2.7 TWh | 3 mi |
| Astoria Generating Station | Astoria, NY | 870.9 GWh | 2.6 mi |
| East River | New York, NY | 2.7 TWh | 2.6 mi |
| Harlem River Yard | Bronx, NY | 115.5 GWh | 3.2 mi |
| Hell Gate | Bronx, NY | 119.9 GWh | 3.4 mi |
| Mount Sinai Beth Israel | New York, NY | 62.0 MWh | 2.6 mi |
| New York Presbyterian Hospital- 68th Street | New York, NY | 54.1 GWh | 0.5 mi |
| New York University Central Plant | New York, NY | 78.8 GWh | 2.4 mi |
| North 1st | Brooklyn, NY | 92.8 GWh | 3.1 mi |
| NY CDG 010 | Astoria, NY | 1.4 GWh | 2.8 mi |
| NYC-HH-New Bellevue Hospital | New York, NY | 109.0 MWh | 2.1 mi |
| NYU LANGONE HEALTH | New York, NY | 46.5 GWh | 1.6 mi |
| Peak Power 1 Cogen | New York, NY | 24.1 GWh | 2.4 mi |
| The Mount Sinai Hospital | New York, NY | 184.0 MWh | 2.2 mi |
| Vernon Boulevard | Long Island City, NY | 120.4 GWh | 0.5 mi |
| Woodhull Hospital | Brooklyn, NY | 159.0 MWh | 3.8 mi |
| Zeltmann | Astoria, NY | 2.0 TWh | 2.9 mi |