East River
801 East 14th Street, New York, NY 10009Plant Summary Information
East River is ranked #15 out of 912 power plants in New York in terms of total annual net electricity generation.
East River is comprised of 4 generators and generated 557.6 GWh during the 3-month period between January 2025 to April 2025.
Plant Name | East River |
---|---|
Utility Name | Consolidated Edison Co-NY Inc |
Location | New York County, NY |
Initial Operation Date | November 1951 |
Last Update | Apr 2025 |
Annual Generation | 2.8 TWh |
Annual Consumption | 33.4 M MMBtu |
Ranked #416 out of 12,299 Power Plants Nationwide | |
Ranked #251 out of 2,221 Natural Gas Power Plants Nationwide | |
Ranked #15 out of 912 New York Power Plants | |
Ranked #10 out of 111 New York Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of East River
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for East River.
Monthly Net Generation for East River
East River Details
Summary Information | |
---|---|
Plant Name | East River (2493) |
Plant Address | 801 East 14th Street, New York, NY 10009 |
Utility | Consolidated Edison Co-NY Inc (4226) |
Latitude, Longitude | 40.7281, -73.9742 |
Generation Dates on File | Jan 2001 to Apr 2025 |
Initial Operation Date | November 1951 |
Annual Generation | 2.8 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | NPCC |
Balancing Authority | New York Independent System Operator (NYIS) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | East River |
Ash Impoundment | No |
Transmission / Distribution Owner | Consolidated Edison Co-NY Inc (4226) NY |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | TRANSCONTINENTAL GAS PIPELINE |
Natural Gas Storage | No |
Generator 6 Details Operating November 1951
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 156.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 141.5 MW |
Winter Capacity | 139.9 MW |
Minimum Load | 45 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 1951 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Electric Utility (1) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Distillate Fuel Oil / Residual Fuel Oil |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO / RFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 141.5 MW |
Net Winter Capacity With Natural Gas | 139.9 MW |
Net Summer Capacity With Oil | 141.5 MW |
Net Winter Capacity With Oil | 139.9 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Other Limits | Yes |
Generator 7 Details Operating June 1955
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 200 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 181.5 MW |
Winter Capacity | 185 MW |
Minimum Load | 65 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1955 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil / Residual Fuel Oil |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO / RFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 181.5 MW |
Net Winter Capacity With Natural Gas | 185 MW |
Net Summer Capacity With Oil | 181.5 MW |
Net Winter Capacity With Oil | 185 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Other Limits | Yes |
Generator 1 Details Operating April 2005
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 180 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 153.2 MW |
Winter Capacity | 192.8 MW |
Minimum Load | 110 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 2005 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Kerosene |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 153.2 MW |
Net Winter Capacity With Natural Gas | 192.8 MW |
Net Summer Capacity With Oil | 153.2 MW |
Net Winter Capacity With Oil | 192.8 MW |
Time To Switch From Gas To Oil | UNK |
Time To Switch From Oil To Gas | UNK |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 2 Details Operating April 2005
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 180 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 154.5 MW |
Winter Capacity | 197.3 MW |
Minimum Load | 110 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 2005 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Kerosene |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | No |
---|---|
Net Summer Capacity With Natural Gas | 154.5 MW |
Net Winter Capacity With Natural Gas | 197.3 MW |
Net Summer Capacity With Oil | 154.5 MW |
Net Winter Capacity With Oil | 197.3 MW |
Time To Switch From Gas To Oil | 72H |
Time To Switch From Oil To Gas | UNK |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
East River Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#241 | Rocky Mountain Energy Center | Keenesburg, CO | 2.9 TWh |
#242 | Eastman Cogeneration Facility | Longview, TX | 2.9 TWh |
#243 | Higgins Generating Station | Primm, NV | 2.9 TWh |
#244 | Whiting Clean Energy | Whiting, IN | 2.9 TWh |
#245 | Wildcat Point Generation Facility | Conowingo, MD | 2.9 TWh |
#246 | Chattahoochee Energy Facility | Franklin, GA | 2.8 TWh |
#247 | Harrison County Power Project | Marshall, TX | 2.8 TWh |
#248 | Granite Ridge | Londonderry, NH | 2.8 TWh |
#249 | Gila River Power Block 4 | Gila Bend, AZ | 2.8 TWh |
#250 | Gateway Generating Station | Antioch, CA | 2.8 TWh |
#252 | Sabine River Operations | Orange, TX | 2.8 TWh |
#253 | Bridgeport Energy Project | Bridgeport, CT | 2.8 TWh |
#254 | Colusa Generating Station | Maxwell, CA | 2.7 TWh |
#255 | Brunner Island | York Haven, PA | 4.3 TWh |
#256 | Currant Creek | Mona, UT | 2.7 TWh |
#257 | Mankato Energy Center | Mankato, MN | 2.7 TWh |
#258 | Empire Generating Co LLC | Rensselaer, NY | 2.8 TWh |
#259 | Ingleside Cogeneration | Houston, TX | 2.7 TWh |
#260 | Newark Energy Center | Newark, NJ | 2.7 TWh |
#261 | ExxonMobil Baytown Turbine | Baytown, TX | 2.7 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding East River.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
5601 Westside CDG | North Bergen, NJ | 2.3 GWh | 5 mi |
59th Street | New York, NY | 477.0 MWh | 3.1 mi |
74th Street | New York, NY | 7.0 MWh | 3 mi |
Brooklyn Hospital Center | Brooklyn, NY | 8.0 MWh | 2.6 mi |
Brooklyn Navy Yard Cogeneration | Brooklyn, NY | 2.0 TWh | 2 mi |
Gowanus Gas Turbines Generating | Brooklyn, NY | 10.9 GWh | 4.7 mi |
Joseph J Seymour Power Project | Brooklyn, NY | 101.3 GWh | 4.7 mi |
Mount Sinai Beth Israel | New York, NY | 62.0 MWh | 0.5 mi |
New York Presbyterian Hospital- 68th Street | New York, NY | 54.0 GWh | 2.7 mi |
NewYork-Presbyterian Brooklyn Methodist | Brooklyn, NY | 25.0 MWh | 4.2 mi |
North 1st | Brooklyn, NY | 67.6 GWh | 0.9 mi |
NYC-HH-New Bellevue Hospital | New York, NY | 71.0 MWh | 0.8 mi |
NYP-Lower Manhattan Hospital | New York, NY | 18.0 MWh | 2 mi |
NYU LANGONE HEALTH | New York, NY | 46.1 GWh | 1.3 mi |
OBP Cogen | New York, NY | 25.4 GWh | 1.9 mi |
Peak Power 1 Cogen | New York, NY | 21.4 GWh | 1.8 mi |
Ravenswood | Long Island, NY | 2.6 TWh | 2.6 mi |
The Mount Sinai Hospital | New York, NY | 184.0 MWh | 4.4 mi |
Vernon Boulevard | Long Island City, NY | 117.2 GWh | 2.2 mi |
Woodhull Hospital | Brooklyn, NY | 162.0 MWh | 2.3 mi |