BWC Pocasset River
0 Route 25, Wareham, MA 2571Plant Summary Information
BWC Pocasset River is ranked #362 out of 503 solar farms in Massachusetts in terms of total annual net electricity generation.
BWC Pocasset River generated 481.0 MWh during the 3-month period between September 2024 to December 2024.
Plant Name | BWC Pocasset River |
---|---|
Utility Name | BWC Pocasset River, LLC |
Location | Plymouth County, MA |
Initial Operation Date | December 2018 |
Last Update | Dec 2024 |
Annual Generation | 2.4 GWh |
Annual Consumption | 8.3 k MMBtu |
Ranked #9,897 out of 12,299 Power Plants Nationwide | |
Ranked #4,740 out of 6,182 Solar Power Plants Nationwide | |
Ranked #447 out of 609 Massachusetts Power Plants | |
Ranked #362 out of 503 Massachusetts Solar Power Plants | |
Fuel Types | Solar |
Map of BWC Pocasset River
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for BWC Pocasset River.
Monthly Net Generation for BWC Pocasset River
BWC Pocasset River Details
Summary Information | |
---|---|
Plant Name | BWC Pocasset River (62372) |
Plant Address | 0 Route 25, Wareham, MA 2571 |
Utility | BWC Pocasset River, LLC (61898) |
Latitude, Longitude | 41.78218, -70.68773 |
Generation Dates on File | Jan 2019 to Dec 2024 |
Initial Operation Date | December 2018 |
Annual Generation | 2.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF18-1539-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | NSTAR Electric Company (54913) MA |
Grid Voltage | 22.80 kV |
Energy Storage | No |
Generator 62594 Details Operating December 2018
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 1.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 1.8 MW |
Virtual Net Metering Agreement | No |
BWC Pocasset River Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4730 | Kearsarge Johnstown 1 CSG | Johnstown, NY | 2.4 GWh |
#4731 | TJX Las Vegas | North Las Vegas, NV | 2.4 GWh |
#4732 | Schull CSG | Mapleton, MN | 2.4 GWh |
#4733 | Oltmans SCE at Jurupa | Ontario, CA | 2.4 GWh |
#4734 | Lindsborg | Lindsborg, KS | 2.4 GWh |
#4735 | Kenmare - Mansfield Branch Street | Mansfield, MA | 2.4 GWh |
#4736 | Norton Landfill Solar | Norton, MA | 2.4 GWh |
#4737 | Gifford CSG | Schenectady, NY | 2.4 GWh |
#4738 | Rose Acre Solar Energy Storage | Currituck, NC | 2.2 GWh |
#4739 | Love Lane Solar | Upper Deerfield Towns, NJ | 2.4 GWh |
#4741 | MN CSG 2019-38 DE LLC | Cleveland, MN | 2.4 GWh |
#4742 | Calabro Airport North Solar Project | Shirley, NY | 2.4 GWh |
#4743 | Deshler Solar | Hebron, NE | 2.3 GWh |
#4744 | Bayer - Whippany, NJ | Whippany, NJ | 2.3 GWh |
#4745 | Dulles | Jurupa Valley, CA | 2.3 GWh |
#4746 | UI RCP Bridgeport Seaside | Bridgeport, CT | 19.9 GWh |
#4747 | Intel - Ocotillo Campus Solar | Chandler, AZ | 2.3 GWh |
#4748 | Urbana-Heartland | Chanute, KS | 2.3 GWh |
#4749 | SR Skylark C | Windsor, CO | 2.3 GWh |
#4750 | Faunce Corner Community Solar | Dartmouth, MA | 2.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding BWC Pocasset River.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
0 Hammond St CSG | Carver, MA | 14.4 GWh | 2.7 mi |
160 Tihonet Rd Hybrid(CSG) | Wareham, MA | 9.8 GWh | 1.5 mi |
196 Tremont St(CSG) | Carver, MA | 3.7 GWh | 4.7 mi |
276 Federal Rd(CSG) | Carver, MA | 10.1 GWh | 2.5 mi |
299 Farm to Market Rd Hybrid(CSG) | Wareham, MA | 7.9 GWh | 2.2 mi |
59 Federal Rd(CSG) | Carver, MA | 12.8 GWh | 3.6 mi |
71 Charlotte Furnace Rd Hybrid(CSG) | Wareham, MA | 6.8 GWh | 3 mi |
77 Farm to Market Rd Hybrid(CSG) | Wareham, MA | 11.0 GWh | 2 mi |
Acushnet AD Makepeace | Wareham, MA | 6.0 GWh | 3.1 mi |
BWC Gibbs Brook | Wareham, MA | 6.4 GWh | 0.7 mi |
BWC Harlow Brook | Wareham, MA | 2.2 GWh | 0.2 mi |
BWC Wareham River | Wareham, MA | 1.7 GWh | 0.3 mi |
Cranberry Highway Solar LLC | Wareham, MA | 2.2 GWh | 3 mi |
Federal Road Solar 1, LLC CSG | South Carver, MA | 16.5 GWh | 2.6 mi |
Future Generation Wind | Plymouth, MA | 14.1 GWh | 3.7 mi |
Onset East Community Solar Facility | Wareham, MA | 1.8 GWh | 2.5 mi |
Onset West Community Solar Facility | Wareham, MA | 1.8 GWh | 2.5 mi |
Tihonet Solar | Wareham, MA | 1.8 GWh | 1.9 mi |
Wareham MA 1 Community Solar | Wareham, MA | 3.1 GWh | 1.6 mi |
Wareham Solar PV | Wareham, MA | 1.2 GWh | 3.2 mi |