Thunder Spirit Wind, LLC
2nd Street NE, Hettinger, ND 58639Plant Summary Information
Thunder Spirit Wind, LLC is ranked #18 out of 59 power plants in North Dakota in terms of total annual net electricity generation.
Thunder Spirit Wind, LLC generated 157.9 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Thunder Spirit Wind, LLC |
|---|---|
| Utility Name | Montana-Dakota Utilities Co |
| Location | Adams County, ND |
| Initial Operation Date | December 2015 |
| Last Update | Dec 2025 |
| Annual Generation | 568.3 GWh |
| Annual Consumption | 2.1 M MMBtu |
| Ranked #1,212 out of 13,081 Power Plants Nationwide | |
| Ranked #311 out of 1,366 Wind Power Plants Nationwide | |
| Ranked #18 out of 59 North Dakota Power Plants | |
| Ranked #10 out of 42 North Dakota Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operator |
Thunder Spirit Wind, LLC (2013 to 2014) Montana-Dakota Utilities Co (2015 to 2025) |
Map of Thunder Spirit Wind, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Thunder Spirit Wind, LLC.
Monthly Net Generation for Thunder Spirit Wind, LLC
Monthly Plant Fuel Consumption for Thunder Spirit Wind, LLC
Thunder Spirit Wind, LLC Details
| Summary Information | |
|---|---|
| Plant Name | Thunder Spirit Wind, LLC (58965) |
| Plant Address | 2nd Street NE, Hettinger, ND 58639 |
| Utility | Montana-Dakota Utilities Co (12199) |
| Latitude, Longitude | 46.075, -102.56333 |
| Generation Dates on File | Dec 2015 to Dec 2025 |
| Initial Operation Date | December 2015 |
| Annual Generation | 568.3 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | MRO |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Montana-Dakota Utilities Co (12199) ND |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator THNDR Details Operating December 2015
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | MDU.TSWF1 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | MDU.TSWF1 |
| Nameplate Capacity | 107.5 MW |
| Summer Capacity | 107.5 MW |
| Winter Capacity | 107.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2015 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 43 |
| Turbine Details | |
| Number Of Turbines | 43 |
|---|---|
| Predominant Turbine Manufacturer | Nordex |
| Predominant Turbine Model Number | N100/2500 |
| Design Wind Speed | 17.9 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 263 |
Generator 2 Details Operating October 2018
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | MDU.TSWF1 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | MDU.TSWF1 |
| Nameplate Capacity | 48 MW |
| Summer Capacity | 48 MW |
| Winter Capacity | 48 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | October 2018 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Wind |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 16 |
| Turbine Details | |
| Number Of Turbines | 16 |
|---|---|
| Predominant Turbine Manufacturer | Nordex |
| Predominant Turbine Model Number | N117/3000 |
| Design Wind Speed | 17.9 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 298.6 |
Thunder Spirit Wind, LLC Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #301 | English Farms | Montezuma, IA | 573.2 GWh |
| #302 | Bison 4 Wind Energy Center | New Salem, ND | 572.9 GWh |
| #303 | Balko Wind LLC | Balko, OK | 572.2 GWh |
| #304 | Minco Wind IV, LLC | Hinton, OK | 571.9 GWh |
| #305 | FPL Energy Story Wind LLC | Zearing, IA | 571.3 GWh |
| #306 | Monte Cristo 1 | Monte Alto, TX | 570.9 GWh |
| #307 | Clear Creek Wind | Maryville, MO | 570.5 GWh |
| #308 | Headwaters Wind Farm II LLC | Losanville, IN | 570.2 GWh |
| #309 | NaturEner Rim Rock Energy | Kevin, MT | 569.5 GWh |
| #310 | Carousel Wind Farm LLC | Burlington, CO | 568.5 GWh |
| #312 | Elk City LLC | Sweetwater, OK | 567.5 GWh |
| #313 | Cedro Hill Wind LLC | Bruni, TX | 567.3 GWh |
| #314 | Stella Wind Farm | Armstrong, TX | 566.4 GWh |
| #315 | Echo Wind Park | Elkton, MI | 565.7 GWh |
| #316 | Blue Canyon Windpower II | Carnegie, OK | 565.7 GWh |
| #317 | Sugar Creek Wind One LLC | TBD, IL | 565.7 GWh |
| #318 | Blue Cloud Wind Energy LLC | Sudan, TX | 565.3 GWh |
| #319 | Colorado Green Holdings LLC | Lamar, CO | 564.0 GWh |
| #320 | Old Trail Wind Farm | Ellsworth, IL | 563.5 GWh |
| #321 | Old Settler Wind | Floydada, TX | 562.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Thunder Spirit Wind, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Antelope Valley | Beulah, ND | 5.8 TWh | 95.9 mi |
| Bison 2 Wind Energy Center | New Salem, ND | 269.8 GWh | 78.8 mi |
| Bison 3 Wind Energy Center | New Salem, ND | 267.9 GWh | 78.8 mi |
| Bison 4 Wind Energy Center | New Salem, ND | 572.9 GWh | 78.8 mi |
| Bison I Wind Energy Center | New Salem, ND | 196.5 GWh | 78.8 mi |
| Bowman Wind | Bowman, ND | 477.2 GWh | 49.8 mi |
| Brady II Wind Energy Center | Dickinson, ND | 617.2 GWh | 38.6 mi |
| Brady Wind Energy Center | Dickinson, ND | 638.9 GWh | 40.6 mi |
| Cedar Hills Wind Farm | Rhame, ND | 47.6 GWh | 58.8 mi |
| Coyote | Beulah, ND | 2.5 TWh | 86.8 mi |
| Diamond Willow Wind Facility | Baker, MT | 88.0 GWh | 78.7 mi |
| Glen Ullin Energy Center | Glen Ullin, ND | 423.3 GWh | 71 mi |
| Glen Ullin Station 6 | Glen Ullin, ND | 32.3 GWh | 64.3 mi |
| Milton R Young | Center, ND | 3.9 TWh | 93.8 mi |
| Oliver Wind III, LLC | Mandan, ND | 365.7 GWh | 90.1 mi |
| Oliver Wind IV | Hannover, ND | 805.9 GWh | 85.4 mi |
| R M Heskett | Mandan, ND | 61.8 GWh | 96.9 mi |
| Sunflower Wind Project | Mandan, ND | 420.4 GWh | 57.6 mi |
| Tesoro Mandan Cogeneration Plant | Mandan, ND | 50.4 GWh | 96.3 mi |
| Willow Creek Wind Power LLC | Newell, SD | 381.0 GWh | 91.8 mi |