Horse Mesa
20909 E. Apache Trail, Apache Junction, AZ 85119Plant Summary Information
Horse Mesa is ranked #4 out of 9 hydroelectric power plants in Arizona in terms of total annual net electricity generation.
Horse Mesa is comprised of 4 generators and generated 31.2 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Horse Mesa |
|---|---|
| Utility Name | Salt River Project |
| Location | Maricopa County, AZ |
| Initial Operation Date | April 1927 |
| Last Update | May 2026 |
| Annual Generation | 92.6 GWh |
| Annual Consumption | 36.9 k MMBtu |
| Ranked #3,585 out of 13,081 Power Plants Nationwide | |
| Ranked #342 out of 1,311 Water Power Plants Nationwide | |
| Ranked #75 out of 176 Arizona Power Plants | |
| Ranked #4 out of 9 Arizona Water Power Plants | |
| Fuel Types | Water |
Map of Horse Mesa
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Horse Mesa.
Monthly Net Generation for Horse Mesa
Monthly Plant Fuel Consumption for Horse Mesa
Horse Mesa Details
| Summary Information | |
|---|---|
| Plant Name | Horse Mesa (145) |
| Plant Address | 20909 E. Apache Trail, Apache Junction, AZ 85119 |
| Utility | Salt River Project (16572) |
| Latitude, Longitude | 33.5907, -111.344 |
| Generation Dates on File | Jan 2001 to May 2026 |
| Initial Operation Date | April 1927 |
| Annual Generation | 92.6 GWh |
| Fuel Types | Water |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | WECC |
| Balancing Authority | Salt River Project (SRP) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Salt River |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Salt River Project (16572) AZ |
| Grid Voltage | 115.00 kV |
| Energy Storage | Yes |
Generator HM1 Details Operating April 1927
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 9.9 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 10 MW |
| Winter Capacity | 10 MW |
| Minimum Load | 3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | April 1927 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Other Planned Modifications | No |
| Multiple Fuels | No |
Generator HM2 Details Operating April 1927
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 9.9 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 10 MW |
| Winter Capacity | 10 MW |
| Minimum Load | 3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | April 1927 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Other Planned Modifications | No |
| Multiple Fuels | No |
Generator HM3 Details OA April 1927
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 11.7 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 10 MW |
| Winter Capacity | 10 MW |
| Minimum Load | 3 MW |
| Uprate/Derate Completed | No |
| Status | OA |
| First Operation Date | April 1927 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Other Planned Modifications | No |
| Multiple Fuels | No |
Generator HM4 Details Operating June 1927
| Technology | Hydroelectric Pumped Storage |
|---|---|
| Prime Mover | Pumped Storage |
| Ownership | Single Owner |
| Nameplate Capacity | 99.8 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 119 MW |
| Winter Capacity | 119 MW |
| Minimum Load | 80 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 1927 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Horse Mesa Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #332 | North Highlands | Columbus, GA | 96.9 GWh |
| #333 | Tuckertown Hydro | New London, NC | 95.7 GWh |
| #334 | York Haven | York Haven, PA | 95.7 GWh |
| #335 | Fort Patrick Henry | Kingsport, TN | 94.8 GWh |
| #336 | Beaver Dam (AR) | Eureka Springs, AR | 94.6 GWh |
| #337 | Tugalo | Tallulah Falls, GA | 93.9 GWh |
| #338 | Lake Lynn Hydro Station | Lake Lynn, PA | 93.9 GWh |
| #339 | Falls Hydro | Badin, NC | 93.6 GWh |
| #340 | Shepaug | Southbury, CT | 93.3 GWh |
| #341 | Winfield | Winfield, WV | 93.0 GWh |
| #343 | Upper Salmon A | Hagerman, ID | 92.6 GWh |
| #344 | Shoshone (CO) | Glenwood Springs, CO | 91.8 GWh |
| #345 | Saluda Lexington | Columbia, SC | 91.5 GWh |
| #346 | Bennetts Bridge | Altmar, NY | 90.4 GWh |
| #347 | Stewarts Bridge | Corinth, NY | 90.4 GWh |
| #348 | Mountain Island | Mount Holly, NC | 90.0 GWh |
| #349 | Muck Valley Hydroelectric | NA, CA | 89.8 GWh |
| #350 | Union Valley | Fresh Pond, CA | 89.1 GWh |
| #351 | Upper Salmon B | Hagerman, ID | 89.1 GWh |
| #352 | Laurel Dam | London, KY | 88.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Horse Mesa.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Arizona State University CHP | Tempe, AZ | 39.2 GWh | 35.7 mi |
| AZ State University - Tempe Campus Solar | Tempe, AZ | 1.9 GWh | 35.6 mi |
| Banner Solar Ironwood | Queen Creek, AZ | 4.0 GWh | 29.1 mi |
| Bonnybrooke PV | Florence, AZ | 90.8 GWh | 37.1 mi |
| Box Canyon (AZ) | Florence, AZ | 872.3 GWh | 29.8 mi |
| Copper Crossing Energy and Research Cent | Florence, AZ | 4.3 GWh | 31.2 mi |
| Gilbert Solar Facility I, LLC | Gilbert, AZ | 4.0 GWh | 31 mi |
| Jewish Community Center PV | Scottsdale, AZ | 2.0 GWh | 33.4 mi |
| Kyrene | Tempe, AZ | 1.2 TWh | 37.8 mi |
| Mesa Carport PV | Mesa, AZ | 6.2 GWh | 22.5 mi |
| Mormon Flat | Apache Junction, AZ | 43.9 GWh | 6.3 mi |
| Ocotillo | Tempe, AZ | 378.7 GWh | 34.7 mi |
| Paradise Valley H.S. PV | Phoenix, AZ | 2.1 GWh | 37.9 mi |
| Phoenix Airport East Economy Lot | Phoenix, AZ | 777.0 MWh | 38.4 mi |
| Poseidon Solar, LLC | Globe, AZ | 48.8 GWh | 30.8 mi |
| Queen Creek Solar Farm | Queen Creek, AZ | 34.8 GWh | 27.2 mi |
| Roosevelt | Roosevelt, AZ | 76.0 GWh | 11.9 mi |
| Sandstone Solar | Florence, AZ | 116.9 GWh | 38.7 mi |
| Santan | Gilbert, AZ | 4.9 TWh | 29.4 mi |
| Stewart Mountain | Phoenix, AZ | 36.6 GWh | 11.2 mi |