Orange PV
380 East River Street, Orange, MA 1364Plant Summary Information
Orange PV is ranked #338 out of 503 solar farms in Massachusetts in terms of total annual net electricity generation.
Orange PV generated 545.0 MWh during the 3-month period between September 2024 to December 2024.
Plant Name | Orange PV |
---|---|
Utility Name | Terraform Arcadia |
Location | Franklin County, MA |
Initial Operation Date | July 2013 |
Last Update | Dec 2024 |
Annual Generation | 2.6 GWh |
Annual Consumption | 9.3 k MMBtu |
Ranked #9,702 out of 12,312 Power Plants Nationwide | |
Ranked #4,577 out of 6,191 Solar Power Plants Nationwide | |
Ranked #422 out of 609 Massachusetts Power Plants | |
Ranked #338 out of 503 Massachusetts Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
Washington Gas Energy Systems, Inc. (2013 to 2014) WGL Energy Systems, Inc (2015 to 2018) Terraform Arcadia (2019 to 2024) |
Map of Orange PV
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Orange PV.
Monthly Net Generation for Orange PV
Orange PV Details
Summary Information | |
---|---|
Plant Name | Orange PV (58411) |
Plant Address | 380 East River Street, Orange, MA 1364 |
Utility | Terraform Arcadia (63249) |
Latitude, Longitude | 42.585, -72.29389 |
Generation Dates on File | Jul 2013 to Dec 2024 |
Initial Operation Date | July 2013 |
Annual Generation | 2.6 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Massachusetts Electric Co (11804) MA |
Grid Voltage | 13.20 kV |
Energy Storage | No |
Generator SO023 Details Operating July 2013
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Dual Axis Tracking | No |
---|---|
Fixed Tilt | Yes |
Azimuth Angle | 180 |
Tilt Angle | 30 |
DC Net Capacity | 2.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 2.3 MW |
Virtual Net Metering Agreement | No |
Orange PV Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4567 | Geddes 1 Solar, LLC | Saginaw, MI | 2.6 GWh |
#4568 | Krumkill Road Solar North, LLC | Guilderland, NY | 2.6 GWh |
#4569 | Faison Solar | Faison, NC | 2.6 GWh |
#4570 | Hot Springs Energy Storage & Microgrid | Hot Springs, NC | 2.5 GWh |
#4571 | CCUA Solar | Bridgeton, NJ | 2.6 GWh |
#4572 | Kenmare - Sullivan Community College | Sheldrake, NY | 2.6 GWh |
#4573 | Frog Hollow CSG | Ellenville, NY | 2.6 GWh |
#4574 | Berry Road Solar | Pelzer, SC | 2.6 GWh |
#4575 | GD Glocester White Oak I, LLC | Glocester, RI | 2.6 GWh |
#4576 | Chattanooga Metropolitan Airport Solar | Chattanooga, TN | 2.6 GWh |
#4578 | Delphinus Community Solar | Sauk Rapids, MN | 2.6 GWh |
#4579 | Garnet Solar (NY) | Johnsburg, NY | 2.6 GWh |
#4580 | Town of Lexington Solar | Lexington, MA | 2.6 GWh |
#4581 | John A Logan College Solar | Carterville, IL | 2.6 GWh |
#4582 | Alden Solar CSG LLC | Greeley, CO | 2.6 GWh |
#4583 | Richmond Hill | Richmond, ME | 2.6 GWh |
#4584 | L'Oreal Monmouth | Monmouth Junction, NJ | 2.6 GWh |
#4585 | Wilkinson DeFore | Gordon, GA | 2.6 GWh |
#4586 | Elkton Solar | Elkton, MD | 2.6 GWh |
#4587 | Kit Carson | Amalia, NM | 2.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Orange PV.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
580 River Solar | Winchendon, MA | 4.7 GWh | 12.9 mi |
Adams Farm Solar | Athol, MA | 3.4 GWh | 4.9 mi |
Barton Acres Solar, LLC CSG | Phillipston, MA | 1.7 GWh | 6.7 mi |
Erving CSG | Erving, MA | 1.5 GWh | 9.1 mi |
Erving Paper Mills | Erving, MA | 42.7 GWh | 4.8 mi |
French King Solar LLC | Erving, MA | 7.8 GWh | 10 mi |
Happy Hollow CSG Hybrid | Winchendon, MA | 8.0 GWh | 12.7 mi |
Hunt Farm Solar | Orange, MA | 3.4 GWh | 2.2 mi |
Kearsarge Gill | Gill, MA | 3.1 GWh | 11.1 mi |
Montague Site 36-Grosolar | Millers Falls, MA | 5.7 GWh | 12 mi |
NFM Solar Power LLC | Northfield, MA | 1.9 GWh | 9.3 mi |
OSG Solar 1 LLC | Orange, MA | 3.1 GWh | 3.7 mi |
Partridgeville Hybrid CSG | Athol, MA | 5.5 GWh | 2.1 mi |
Spring Hill Road | Barre, MA | 601.0 MWh | 12.8 mi |
Templeton | Templeton, MA | 4.7 GWh | 12.3 mi |
W. Orange Rd Solar LLC | Orange, MA | 7.7 GWh | 2.7 mi |
Wendell MA 1 | Wendell, MA | 1.4 GWh | 5.6 mi |
West Street Solar 1 LLC | Gardner, MA | 8.7 GWh | 12.7 mi |
Wilbur Woods Solar LLC | Orange, MA | 8.3 GWh | 3.2 mi |
Winchendon Landfill Solar | Winchendon, MA | 2.8 GWh | 12.8 mi |