Directory of Power Plants in Oregon
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Fish Creek | PacifiCorp | Idleyld Park, OR | PacifiCorp West (PACW) | 31.7 GWh | May 1952 | Dec 2024 | Water |
| Bend | PacifiCorp | Bend, OR | PacifiCorp West (PACW) | 1.1 GWh | Jun 1913 | Dec 2024 | Water |
| Lemolo 2 | PacifiCorp | Toketee Falls, OR | PacifiCorp West (PACW) | 62.7 GWh | Oct 1956 | Dec 2024 | Water |
| Coffin Butte | Pacific Northwest Generating Coop | Corvallis, OR | Bonneville Power Administration (BPAT) | 38.4 GWh | Sep 1995 | Dec 2024 | Landfill Gas |
| Tunnel 1 Power Project | Owyhee Irrigation District | Nyssa, OR | Idaho Power Company (IPCO) | 22.4 GWh | May 1993 | Oct 2024 | Water |
| Owyhee Dam Power Project | Owyhee Irrigation District | Nyssa, OR | Idaho Power Company (IPCO) | 27.6 GWh | Jul 1985 | Oct 2024 | Water |
| Michell Butte Power Project | Owyhee Irrigation District | Nyssa, OR | Idaho Power Company (IPCO) | 5.3 GWh | Apr 1989 | Oct 2024 | Water |
| Outback Solar At Christmas Valley | Outback Solar, LLC | Christmas Valley, OR | Bonneville Power Administration (BPAT) | 6.6 GWh | Sep 2012 | Dec 2024 | Solar |
| OSLH, LLC | OSLH, LLC | Bend, OR | PacifiCorp West (PACW) | 22.2 GWh | Nov 2016 | Dec 2024 | Solar |
| Oregon State University Energy Center | Oregon State University | Corvallis, OR | Bonneville Power Administration (BPAT) | 36.2 GWh | May 2010 | Mar 2026 | Natural Gas |
| Dry Creek LFG to Energy Project | Oregon Environmental Industries LLC | Eagle Point, OR | PacifiCorp West (PACW) | 19.0 GWh | Jun 2007 | Dec 2024 | Landfill Gas |
| Orchard Windfarm 3, LLC | Orchard Windfarm, LLC | Lexington, OR | Bonneville Power Administration (BPAT) | 27.9 GWh | Nov 2020 | Dec 2024 | Wind |
| Orchard Windfarm 4, LLC | Orchard Windfarm, LLC | Lexington, OR | PacifiCorp West (PACW) | 29.7 GWh | Nov 2020 | Dec 2024 | Wind |
| Orchard Windfarm 2, LLC | Orchard Windfarm, LLC | Lexington, OR | Bonneville Power Administration (BPAT) | 29.8 GWh | Nov 2020 | Dec 2024 | Wind |
| Orchard Windfarm 1, LLC | Orchard Windfarm, LLC | Lexington, OR | PacifiCorp West (PACW) | 29.9 GWh | Nov 2020 | Dec 2024 | Wind |
| OR Solar 2, LLC | OR Solar 2, LLC | Eagle Point, OR | PacifiCorp West (PACW) | 12.7 GWh | Sep 2020 | Dec 2024 | Solar |
| Old Mill Solar | Old Mill Solar | Bly, OR | PacifiCorp West (PACW) | 7.2 GWh | Nov 2015 | Dec 2024 | Solar |
| Big Top LLC | Odessa Energy Services LLC | Echo, OR | PacifiCorp West (PACW) | 3.4 GWh | May 2009 | Dec 2024 | Wind |
| Wagon Trail LLC | Odessa Energy Services LLC | Echo, OR | PacifiCorp West (PACW) | 5.8 GWh | May 2009 | Dec 2024 | Wind |
| Butter Creek Power LLC | Odessa Energy Services LLC | Echo, OR | PacifiCorp West (PACW) | 10.9 GWh | May 2009 | Dec 2024 | Wind |
| O'Neill Creek Solar | O'Neill Creek Solar LLC | Gaston, OR | Portland General Electric Company (PGE) | 3.4 GWh | Oct 2019 | Dec 2024 | Solar |
| Eagle Point Solar | Norwest Energy 7, LLC | Central Point, OR | PacifiCorp West (PACW) | 18.0 GWh | Nov 2017 | Dec 2024 | Solar |
| Grand Ronde Solar | NorWest Energy 14, LLC | Grand Ronde, OR | Portland General Electric Company (PGE) | 12.0 MWh | Nov 2017 | Dec 2024 | Solar |
| Dalles Dam North Fishway Project | Northern Wasco County PUD | The Dalles, OR | Bonneville Power Administration (BPAT) | 44.3 GWh | Apr 1991 | Dec 2024 | Water |
| River Valley Solar | Neighborhood Power Corp. | Woodburn, OR | Portland General Electric Company (PGE) | 3.4 GWh | Mar 2022 | Oct 2024 | Solar |
| Tickle Creek Solar | Neighborhood Power Corp. | Sandy, OR | Portland General Electric Company (PGE) | 3.1 GWh | Nov 2019 | Dec 2024 | Solar |
| Williams Acres Solar | Neighborhood Power Corp. | Woodburn, OR | Portland General Electric Company (PGE) | 4.2 GWh | Mar 2021 | Dec 2024 | Solar |
| Mt Hope Solar | Neighborhood Power Corp. | Molalla, OR | Portland General Electric Company (PGE) | 4.1 GWh | Feb 2021 | Dec 2024 | Solar |
| Dunn Road Solar | Neighborhood Power Corp. | Sandy, OR | Portland General Electric Company (PGE) | 3.1 GWh | Feb 2021 | Dec 2024 | Solar |
| Thomas Creek Solar | Neighborhood Power Corp. | Molalla, OR | Portland General Electric Company (PGE) | 3.9 GWh | Oct 2019 | Dec 2024 | Solar |
| St Louis Solar | Neighborhood Power Corp. | Gervais, OR | Portland General Electric Company (PGE) | 4.0 GWh | Feb 2020 | Dec 2024 | Solar |
| NorWest Energy 4, LLC | MN8 Energy LLC | Bonanza, OR | PacifiCorp West (PACW) | 9.5 GWh | Dec 2018 | Dec 2024 | Solar |
| Klamath Falls Solar 2 CSG | MN8 Energy LLC | Klamath Falls, OR | PacifiCorp West (PACW) | 6.7 GWh | Nov 2017 | Dec 2024 | Solar |
| NorWest Energy 9 LLC | MN8 Energy LLC | Pendleton, OR | PacifiCorp West (PACW) | 10.7 GWh | Aug 2018 | Dec 2024 | Solar |
| Minke Solar | Minke Solar, LLC | Molalla, OR | Portland General Electric Company (PGE) | 27.0 MWh | Nov 2020 | Dec 2024 | Solar |
| Middle Fork Irrigation District | Middle Fork Irrigation Dist | Parkdale, OR | Bonneville Power Administration (BPAT) | 20.1 GWh | Feb 1986 | Dec 2024 | Water |
| OR - Green Key - Marquam | Marquam Creek Solar, LLC | Molalla, OR | Portland General Electric Company (PGE) | 37.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Linkville Solar (CSG) | Linkville Solar, LLC | Klamath Falls, OR | PacifiCorp West (PACW) | 3.9 GWh | Apr 2024 | Dec 2024 | Solar |
| Lime Wind | Lime Wind LLC | Huntington, OR | Idaho Power Company (IPCO) | 5.3 GWh | Nov 2011 | Dec 2024 | Wind |
| Lacomb Irrigation District | Lacomb Irrigation Dist | Lebanon, OR | PacifiCorp West (PACW) | 4.0 GWh | Nov 1986 | Dec 2024 | Water |
| Labish Solar LLC | Labish Solar LLC | Salem, OR | Portland General Electric Company (PGE) | 3.9 GWh | Nov 2018 | Dec 2024 | Solar |
| Klamath Expansion Project | Klamath Energy LLC | Klamath Falls, OR | Avangrid Renewables, LLC (AVRN) | 132.3 GWh | Apr 2002 | Dec 2024 | Natural Gas |
| Klamath Cogeneration Plant | Klamath Energy LLC | Klamath Falls, OR | Avangrid Renewables, LLC (AVRN) | 3.0 TWh | Jun 2001 | Mar 2026 | Natural Gas |
| Kale Patch Solar | Kale Patch Solar LLC | Gervais, OR | Portland General Electric Company (PGE) | 3.5 GWh | Sep 2019 | Dec 2024 | Solar |
| Kaiser Creek Solar (CSG) | Kaiser Creek Solar, LLC | Molalla, OR | Portland General Electric Company (PGE) | 3.0 GWh | Nov 2022 | Dec 2024 | Solar |
| Jett Creek Windfarm (Burnt River) | Jett Creek | Huntington, OR | Idaho Power Company (IPCO) | 18.4 GWh | Feb 2017 | Dec 2024 | Wind |
| Willow Creek Energy Center | Invenergy Services LLC | Lone, OR | Bonneville Power Administration (BPAT) | 168.7 GWh | Dec 2008 | Dec 2024 | Wind |
| Millican Solar Energy LLC | Invenergy Services LLC | Prineville, OR | PacifiCorp West (PACW) | 141.9 GWh | Feb 2021 | Mar 2026 | Solar |
| Prineville Solar Energy LLC | Invenergy Services LLC | Prineville, OR | PacifiCorp West (PACW) | 90.8 GWh | Jan 2021 | Mar 2026 | Solar |
| IP Springfield Oregon | International Paper Corporation - Springfield | Springfield, OR | Bonneville Power Administration (BPAT) | 168.9 GWh | Dec 1948 | Dec 2024 | Black Liquor : 78.2% Natural Gas : 21.8% |
| Oxbow (OR) | Idaho Power Co | Oxbow, OR | Idaho Power Company (IPCO) | 965.3 GWh | Jun 1961 | Dec 2024 | Water |
| Hells Canyon | Idaho Power Co | Oxbow, OR | Idaho Power Company (IPCO) | 1.9 TWh | Sep 1967 | Dec 2024 | Water |
| Hermiston Power Partnership | Hermiston Power Partnership | Hermiston, OR | Gridforce Energy Management, LLC (GRID) | 3.2 TWh | Jul 2002 | Mar 2026 | Natural Gas |
| Hermiston Generating Plant | Hermiston Generating Co LP | Hermiston, OR | PacifiCorp West (PACW) | 3.0 TWh | May 1996 | Mar 2026 | Natural Gas |
| OR Solar 8, LLC | Heelstone Energy Holdings, LLC | Dairy, OR | PacifiCorp West (PACW) | 21.0 GWh | Feb 2018 | Dec 2024 | Solar |
| OR Solar 3, LLC | Heelstone Energy Holdings, LLC | Malin, OR | PacifiCorp West (PACW) | 22.7 GWh | Nov 2017 | Dec 2024 | Solar |
| Chiloquin Solar, LLC | Heelstone Energy Holdings, LLC | Chiloquin, OR | PacifiCorp West (PACW) | 18.1 GWh | Dec 2017 | Dec 2024 | Solar |
| Tumbleweed Solar, LLC | Heelstone Energy Holdings, LLC | Redmond, OR | PacifiCorp West (PACW) | 18.7 GWh | Nov 2017 | Dec 2024 | Solar |
| OR Solar 5, LLC | Heelstone Energy Holdings, LLC | Merrill, OR | PacifiCorp West (PACW) | 18.3 GWh | Dec 2017 | Dec 2024 | Solar |
| OR Solar 6, LLC | Heelstone Energy Holdings, LLC | Lakeview, OR | PacifiCorp West (PACW) | 22.2 GWh | Nov 2017 | Dec 2024 | Solar |
| OR - Green Key - Gun Club | Gun Club Solar, LLC | Dundee, OR | Portland General Electric Company (PGE) | 24.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Palmer Creek Solar, LLC | Greenbacker Renewable Energy Corporation | Dayton, OR | Portland General Electric Company (PGE) | 3.0 GWh | Oct 2020 | Dec 2024 | Solar |
| Day Hill Solar, LLC | Greenbacker Renewable Energy Corporation | Estacada, OR | Portland General Electric Company (PGE) | 3.9 GWh | Sep 2020 | Dec 2024 | Solar |
| Georgia-Pacific Wauna Mill | Georgia-Pacific Wauna LLC | Clatskanie, OR | Bonneville Power Administration (BPAT) | 167.8 GWh | Jan 1996 | Mar 2026 | Black Liquor : 56.2% Natural Gas : 33.4% Other Biomass Solids : 10.4% |
| Georgia-Pacific Toledo Mill | Georgia-Pacific Toledo LLC | Toledo, OR | Bonneville Power Administration (BPAT) | 56.2 GWh | Jan 2007 | Dec 2024 | Black Liquor : 54.8% Natural Gas : 45.2% |
| Fruitland Creek Solar (CSG) | Fruitland Creek Solar, LLC | Salem, OR | Portland General Electric Company (PGE) | 2.5 GWh | Nov 2022 | Dec 2024 | Solar |
| FPL Energy Vansycle LLC (OR) | FPL Energy Vansycle LLC | Touchet, OR | Bonneville Power Administration (BPAT) | 257.0 GWh | Nov 2001 | Dec 2024 | Wind |
| Vansycle II Wind Energy Center | FPL Energy Stateline II Inc | Athena, OR | PacifiCorp West (PACW) | 357.3 GWh | Nov 2009 | Dec 2024 | Wind |
| Fort Rock IV | Fort Rock Solar IV LLC | Fort Rock, OR | Bonneville Power Administration (BPAT) | 24.0 GWh | May 2020 | Dec 2024 | Solar |
| Fort Rock I | Fort Rock Solar I, LLC | Silver Lake, OR | Bonneville Power Administration (BPAT) | 24.7 GWh | Feb 2020 | Dec 2024 | Solar |
| Finley Buttes Landfill Gas | Finley BioEnergy LLC | Boardman, OR | Bonneville Power Administration (BPAT) | 28.0 GWh | Nov 2007 | Dec 2024 | Landfill Gas |
| Peters Drive Plant | Farmer's Irrigation District | Hood River, OR | PacifiCorp West (PACW) | 7.3 GWh | Oct 1987 | Dec 2024 | Water |
| Copper Dam Plant | Farmer's Irrigation District | Hood River, OR | PacifiCorp West (PACW) | 16.4 GWh | Dec 1985 | Dec 2024 | Water |
| Evergreen BioPower LLC | Evergreen BioPower LLC | Lyons, OR | PacifiCorp West (PACW) | 47.4 GWh | Aug 2007 | Dec 2024 | Wood/Wood Waste Solids |
| Eurus Combine Hills Turbine Ranch 2 | Eurus Combine Hills II LLC | Milton Freewater, OR | Bonneville Power Administration (BPAT) | 163.6 GWh | Dec 2009 | Dec 2024 | Wind |
| Combine Hills I | Eurus Combine Hills I LLC | Milton-Freewater, OR | PacifiCorp West (PACW) | 73.0 GWh | Nov 2003 | Dec 2024 | Wind |
| Carmen Smith | Eugene Water & Electric Board | McKenzie Bridge, OR | Bonneville Power Administration (BPAT) | 223.3 GWh | Dec 1962 | Dec 2024 | Water |
| Stone Creek | Eugene Water & Electric Board | Estacada, OR | Portland General Electric Company (PGE) | 52.3 GWh | Dec 1993 | Dec 2024 | Water |
| Vansycle | ESI Vansycle Partners LP | Touchet, OR | Bonneville Power Administration (BPAT) | 60.0 GWh | Jul 1998 | Dec 2024 | Wind |
| Short Mountain | Emerald People's Utility Dist | Eugene, OR | PacifiCorp West (PACW) | 21.9 GWh | Jan 1992 | Dec 2024 | Landfill Gas |
| Four Corners Windfarm LLC | Echo 2 | Echo, OR | PacifiCorp West (PACW) | 20.7 GWh | May 2009 | Dec 2024 | Wind |
| Four Mile Canyon Windfarm LLC | Echo 2 | Echo, OR | PacifiCorp West (PACW) | 20.8 GWh | May 2009 | Dec 2024 | Wind |
| Oregon Trail Windfarm LLC | Echo 1 | Echo, OR | PacifiCorp West (PACW) | 22.9 GWh | May 2009 | Dec 2024 | Wind |
| Pacific Canyon Windfarm LLC | Echo 1 | Echo, OR | PacifiCorp West (PACW) | 18.2 GWh | May 2009 | Dec 2024 | Wind |
| Sand Ranch Windfarm LLC | Echo 1 | Echo, OR | PacifiCorp West (PACW) | 22.2 GWh | May 2009 | Dec 2024 | Wind |
| Ward Butte Windfarm LLC | Echo 1 | Echo, OR | PacifiCorp West (PACW) | 15.9 GWh | May 2009 | Dec 2024 | Wind |
| 45 Mile Hydroelectric Project | EBD Hydro LLC | Culver, OR | PacifiCorp West (PACW) | 4.9 GWh | Apr 2015 | Oct 2024 | Water |
| Falls Creek | Eagle Creek Renewable Energy, LLC | Cascadia, OR | PacifiCorp West (PACW) | 15.5 GWh | Nov 1984 | Dec 2024 | Water |
| Durbin Creek Windfarm (Burnt River) | Durbin Creek | Huntington, OR | Idaho Power Company (IPCO) | 17.1 GWh | Feb 2017 | Dec 2024 | Wind |
| Drift Creek Solar | Drift Creek Solar, LLC | Silverton, OR | Portland General Electric Company (PGE) | 15.0 MWh | Apr 2020 | Dec 2024 | Solar |
| OR - Solops - SPI 18 - Dover | Dover Solar, LLC | Canby, OR | Portland General Electric Company (PGE) | 567.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Douglas County Forest Products | Douglas County Forest Products | Roseburg, OR | PacifiCorp West (PACW) | 16.7 GWh | Nov 2006 | Dec 2024 | Wood/Wood Waste Solids |
| Galesville Project | Douglas County | Azalea, OR | PacifiCorp West (PACW) | 2.6 GWh | Jan 1987 | Dec 2024 | Water |
| Dorena Hydro-Electric Facility | Dorena Hydro, LLC | Cottage Grove, OR | PacifiCorp West (PACW) | 14.2 GWh | May 2014 | Dec 2024 | Water |
| Opal Springs Hydro | Deschutes Valley Water District | Culver, OR | PacifiCorp West (PACW) | 29.4 GWh | Dec 1984 | Dec 2024 | Water |
| Railroad Solar Center, LLC | Cypress Creek Renewables | Ontario, OR | Idaho Power Company (IPCO) | 10.0 GWh | Oct 2016 | Mar 2026 | Solar |
| Grove Solar Center, LLC | Cypress Creek Renewables | Vale, OR | Idaho Power Company (IPCO) | 13.3 GWh | Aug 2016 | Mar 2026 | Solar |
| Thunderegg Solar Center, LLC | Cypress Creek Renewables | Nyssa, OR | Idaho Power Company (IPCO) | 20.5 GWh | Oct 2016 | Mar 2026 | Solar |
| Hyline Solar Center, LLC | Cypress Creek Renewables | Ontario, OR | Idaho Power Company (IPCO) | 19.3 GWh | Sep 2016 | Mar 2026 | Solar |
| Open Range Solar Center, LLC | Cypress Creek Renewables | Nyssa, OR | Idaho Power Company (IPCO) | 21.7 GWh | Aug 2016 | Mar 2026 | Solar |
Browse Power Plants By Oregon Counties
Figures are based on December 2024 generation numbers.| County | State Rank | Active Plants | Dec 2024 Generation |
|---|---|---|---|
| Polk County, OR | # 30 | 8 | 3.8 GWh |
| Washington County, OR | # 29 | 6 | 4.2 GWh |
| Hood River County, OR | # 28 | 4 | 43.7 GWh |
| Lincoln County, OR | # 27 | 1 | 56.2 GWh |
| Yamhill County, OR | # 26 | 15 | 65.6 GWh |
| Benton County, OR | # 25 | 3 | 75.7 GWh |
| Deschutes County, OR | # 24 | 8 | 88.6 GWh |
| Harney County, OR | # 23 | 4 | 93.5 GWh |
| Clatsop County, OR | # 22 | 2 | 167.8 GWh |
| Lake County, OR | # 21 | 19 | 262.6 GWh |
| Union County, OR | # 20 | 2 | 282.9 GWh |
| Malheur County, OR | # 19 | 15 | 354.9 GWh |
| Crook County, OR | # 18 | 5 | 358.3 GWh |
| Marion County, OR | # 17 | 30 | 434.5 GWh |
| Linn County, OR | # 16 | 8 | 502.3 GWh |
| County | State Rank | Active Plants | Dec 2024 Generation |
|---|---|---|---|
| Douglas County, OR | # 15 | 15 | 587.1 GWh |
| Lane County, OR | # 14 | 12 | 708.0 GWh |
| Jackson County, OR | # 13 | 14 | 798.9 GWh |
| Clackamas County, OR | # 12 | 37 | 866.0 GWh |
| Baker County, OR | # 11 | 9 | 1.1 TWh |
| Jefferson County, OR | # 10 | 10 | 1.3 TWh |
| Wallowa County, OR | # 9 | 2 | 1.9 TWh |
| Klamath County, OR | # 8 | 24 | 3.4 TWh |
| Gilliam County, OR | # 7 | 12 | 4.0 TWh |
| Multnomah County, OR | # 6 | 7 | 4.1 TWh |
| Columbia County, OR | # 5 | 3 | 5.9 TWh |
| Wasco County, OR | # 4 | 7 | 7.0 TWh |
| Morrow County, OR | # 3 | 22 | 9.0 TWh |
| Umatilla County, OR | # 2 | 17 | 10.9 TWh |
| Sherman County, OR | # 1 | 12 | 11.4 TWh |