Fort Rock IV
62661 Webster Rd, Fort Rock, OR 97735Plant Summary Information
Fort Rock IV is ranked #27 out of 114 solar farms in Oregon in terms of total annual net electricity generation.
Fort Rock IV generated 4.9 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Fort Rock IV |
---|---|
Utility Name | Fort Rock Solar IV LLC |
Location | Lake County, OR |
Initial Operation Date | June 2020 |
Last Update | Dec 2022 |
Annual Generation | 21.0 GWh |
Annual Consumption | 74.9 k MMBtu |
Ranked #4,932 out of 11,455 Power Plants Nationwide | |
Ranked #1,041 out of 5,173 Solar Power Plants Nationwide | |
Ranked #126 out of 255 Oregon Power Plants | |
Ranked #27 out of 114 Oregon Solar Power Plants | |
Fuel Types | Solar |
Map of Fort Rock IV
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Fort Rock IV.
Monthly Net Generation for Fort Rock IV
Fort Rock IV Details
Summary Information | |
---|---|
Plant Name | Fort Rock IV (63926) |
Plant Address | 62661 Webster Rd Fort Rock, OR 97735 |
Utility | Fort Rock Solar IV LLC (63593) |
Latitude, Longitude | 43.38988, -120.95609 |
Generation Dates on File | Jun 2020 to Dec 2022 |
Initial Operation Date | June 2020 |
Annual Generation | 21.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF-16-802-002 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Bonneville Power Administration (BPAT) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Bonneville Power Administration (1738) OR |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator FRIV Details Operating June 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 10 MW |
Summer Capacity | 10 MW |
Winter Capacity | 10 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 60 |
DC Net Capacity | 15.1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Fort Rock IV Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1031 | High Shoals PV1 | High Shoals, NC | 21.4 GWh |
#1032 | Badger Hollow II | Montfort, WI | 21.3 GWh |
#1033 | SPS3 Lea | Eunice, NM | 21.3 GWh |
#1034 | Cibola | Seboyeta, NM | 21.2 GWh |
#1035 | Chisum | Blossom, TX | 21.2 GWh |
#1036 | Gardy's Mill Solar | Kinsale, VA | 21.1 GWh |
#1037 | Rankin Solar Center, LLC | Florence, SC | 21.1 GWh |
#1038 | Vale Air Solar Center, LLC | Vale, OR | 21.1 GWh |
#1039 | Springerville | Springerville, AZ | 7.3 TWh |
#1040 | Washington White Post Solar LLC | Bath, NC | 21.0 GWh |
#1042 | Alafia Solar | Mulberry, FL | 21.0 GWh |
#1043 | Chiloquin Solar, LLC | Chiloquin, OR | 20.9 GWh |
#1044 | Nellis Air Force Base Solar Array | Las Vegas, NV | 20.8 GWh |
#1045 | Alexis Solar, LLC | Encino, TX | 20.7 GWh |
#1046 | Tumbleweed Solar, LLC | Redmond, OR | 20.7 GWh |
#1047 | Whitewright Solar | Whitewright, TX | 20.6 GWh |
#1048 | Wye Mills VNEM CSG | Queen Anne, MD | 20.6 GWh |
#1049 | West Gates Solar Station | Huron, CA | 20.5 GWh |
#1050 | Onion River | Sheboygan Cedar Grove, WI | 20.5 GWh |
#1051 | SR DeSoto II | DeSoto, GA | 20.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Fort Rock IV.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alkali Solar, LLC | Silver Lake, OR | 25.6 GWh | 5.4 mi |
Bear Creek Solar Center | Bend, OR | 24.4 GWh | 48.4 mi |
Bend | Bend, OR | 89.8 MWh | 49.8 mi |
Bly Solar Center | Bly, OR | 22.0 GWh | 69 mi |
Fort Rock I | Silver Lake, OR | 23.8 GWh | 5.4 mi |
Juniper Ridge Hydroelectric Project | Bend, OR | 12.5 GWh | 54.3 mi |
Lemolo 1 | Idleyld Park, OR | 113.2 GWh | 65 mi |
Millican Solar Energy LLC | Prineville, OR | 143.9 GWh | 56.8 mi |
NorWest Energy 2, LLC | Bend, OR | 20.2 GWh | 48.8 mi |
NorWest Energy 4, LLC | Bonanza, OR | 11.6 GWh | 58.4 mi |
OSLH, LLC | Bend, OR | 23.1 GWh | 48.3 mi |
Outback Solar At Christmas Valley | Christmas Valley, OR | 9.9 GWh | 25.7 mi |
Prineville Solar Energy LLC | Prineville, OR | 96.2 GWh | 57.6 mi |
Riley | Riley, OR | 23.4 GWh | 64.7 mi |
Rock Garden Solar, LLC | Fort Rock, OR | 24.6 GWh | 1.4 mi |
Siphon Power Project | Bend, OR | 14.9 GWh | 48.2 mi |
Solar Star Oregon II | Prineville, OR | 120.1 GWh | 54.9 mi |
Sprague Hydro | Bly, OR | 467.2 MWh | 61.4 mi |
Suntex Solar, LLC | Riley, OR | 25.5 GWh | 64.8 mi |
Tumbleweed Solar, LLC | Redmond, OR | 20.7 GWh | 57.2 mi |