Oregon Trail Windfarm LLC
28821 Madison Road, Echo, OR 97826Plant Summary Information
Oregon Trail Windfarm LLC is ranked #34 out of 50 wind farms in Oregon in terms of total annual net electricity generation.
Oregon Trail Windfarm LLC generated 4.7 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Oregon Trail Windfarm LLC |
|---|---|
| Utility Name | Echo 1 |
| Location | Umatilla County, OR |
| Initial Operation Date | June 2009 |
| Last Update | Dec 2025 |
| Annual Generation | 22.3 GWh |
| Annual Consumption | 80.6 k MMBtu |
| Ranked #5,226 out of 13,081 Power Plants Nationwide | |
| Ranked #1,092 out of 1,366 Wind Power Plants Nationwide | |
| Ranked #117 out of 275 Oregon Power Plants | |
| Ranked #34 out of 50 Oregon Wind Power Plants | |
| Fuel Types | Wind |
Map of Oregon Trail Windfarm LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Oregon Trail Windfarm LLC.
Monthly Net Generation for Oregon Trail Windfarm LLC
Monthly Plant Fuel Consumption for Oregon Trail Windfarm LLC
Oregon Trail Windfarm LLC Details
| Summary Information | |
|---|---|
| Plant Name | Oregon Trail Windfarm LLC (56971) |
| Plant Address | 28821 Madison Road, Echo, OR 97826 |
| Utility | Echo 1 (56802) |
| Latitude, Longitude | 45.7122, -119.4044 |
| Generation Dates on File | Jun 2009 to Dec 2025 |
| Initial Operation Date | June 2009 |
| Annual Generation | 22.3 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 08-371-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | PacifiCorp - West (PACW) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | PacifiCorp (14354) OR |
| Grid Voltage | 69.00 kV |
| Energy Storage | No |
Generator 1 Details Operating June 2009
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | HINKLE_NODET |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | HINKLE_NODET |
| Nameplate Capacity | 9.9 MW |
| Summer Capacity | 9.9 MW |
| Winter Capacity | 9.9 MW |
| Minimum Load | 0.2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2009 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 6 |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 6 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V82-1.65 |
| Design Wind Speed | 13.3 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 262.4 |
Oregon Trail Windfarm LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1082 | Jett Creek Windfarm (Burnt River) | Huntington, OR | 24.8 GWh |
| #1083 | SPPW1, LLC | Upland, NE | 24.5 GWh |
| #1084 | Ridgetop Energy LLC | Mojave, CA | 24.5 GWh |
| #1085 | Junction Hilltop Wind Farm | Dana, IA | 23.6 GWh |
| #1086 | Prospector Windfarm (Burnt River) | Huntington, OR | 23.5 GWh |
| #1087 | Schumann Wind Farm | Milton-Freewater, OR | 23.1 GWh |
| #1088 | Musselshell Wind Project | Shawmut, MT | 23.1 GWh |
| #1089 | EDF Renewable Windfarm V Inc | Birds Landing, CA | 22.9 GWh |
| #1090 | Foundation NWNA | Cabazon, CA | 22.5 GWh |
| #1091 | Jericho Power | Berlin, NH | 22.5 GWh |
| #1093 | Coram Energy LLC (ECT) | Tehachapi, CA | 21.6 GWh |
| #1094 | Horseshoe Bend Wind Park | Great Falls, MT | 21.2 GWh |
| #1095 | Galactic Wind | Waunakee, WI | 21.2 GWh |
| #1096 | Fossil Gulch | Hagerman, ID | 20.7 GWh |
| #1097 | Pillar Mountain Wind Project Microgrid | Kodiak, AK | 20.5 GWh |
| #1098 | Four Mile Canyon Windfarm LLC | Echo, OR | 20.4 GWh |
| #1099 | Jersey-Atlantic Wind Farm | Atlantic City, NJ | 20.3 GWh |
| #1100 | Velva Windfarm LLC | Velva, ND | 20.2 GWh |
| #1101 | Buffalo Bear LLC | Woodward, OK | 19.9 GWh |
| #1102 | Baron Winds II | Steuben, NY | 19.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Oregon Trail Windfarm LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Big Top LLC | Echo, OR | 3.4 GWh | 4.9 mi |
| Butter Creek Power LLC | Echo, OR | 9.7 GWh | 1.1 mi |
| Carty Generating Station | Boardman, OR | 3.3 TWh | 19.7 mi |
| Coyote Springs | Boardman, OR | 2.0 TWh | 16 mi |
| Coyote Springs II | Boardman, OR | 2.0 TWh | 16 mi |
| Finley Buttes Landfill Gas | Boardman, OR | 13.0 GWh | 10 mi |
| Four Corners Windfarm LLC | Echo, OR | 19.5 GWh | 1.3 mi |
| Four Mile Canyon Windfarm LLC | Echo, OR | 20.4 GWh | 5.2 mi |
| Hermiston Generating Plant | Hermiston, OR | 3.0 TWh | 6.6 mi |
| Hermiston Power Partnership | Hermiston, OR | 3.5 TWh | 7.2 mi |
| McNary | Umatilla, OR | 4.0 TWh | 16.6 mi |
| McNary Dam Fish Attraction Project | Plymouth, WA | 72.5 GWh | 16.5 mi |
| NorWest Energy 9 LLC | Pendleton, OR | 12.2 GWh | 14.5 mi |
| Pacific Canyon Windfarm LLC | Echo, OR | 16.8 GWh | 5.6 mi |
| Sand Ranch Windfarm LLC | Echo, OR | 18.9 GWh | 5.8 mi |
| Wagon Trail LLC | Echo, OR | 5.9 GWh | 5 mi |
| Ward Butte Windfarm LLC | Echo, OR | 14.9 GWh | 1.1 mi |
| Wheatridge 1 | Lexington, OR | 243.0 GWh | 15.3 mi |
| Wheatridge East Wind | Lexington, OR | 511.1 GWh | 11.8 mi |
| Wheatridge Hybrid | Morrow, OR | 655.7 GWh | 15.3 mi |