Directory of Power Plants in North Carolina
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Yadkin 601 Farm | Yadkin 601 Farm, LLC | Yadkinville, NC | Duke Energy Carolinas (DUK) | 5.4 GWh | May 2015 | Dec 2025 | Solar |
| Waste Management Piedmont LFGTE Project | WM Renewable Energy LLC | Kernersville, NC | Duke Energy Carolinas (DUK) | 9.0 GWh | Feb 2011 | Dec 2025 | Landfill Gas |
| Williamston Speight Solar, LLC | Williamston Speight Solar, LLC | Williamston, NC | PJM Interconnection, LLC (PJM) | 25.2 GWh | Oct 2016 | Dec 2025 | Solar |
| White Street Renewables | White Street Renewables LLC | Greensboro, NC | Duke Energy Carolinas (DUK) | 15.6 GWh | May 2019 | Dec 2024 | Landfill Gas : 60.2% Solar : 39.8% |
| Whiskey Solar | Whiskey Solar, LLC | Cumberland, NC | Duke Energy Progress East (CPLE) | 11.6 GWh | May 2021 | Dec 2025 | Solar |
| KapStone Kraft Paper Corp | Westrock Kraft Paper, LLC | Roanoke Rapids, NC | PJM Interconnection, LLC (PJM) | 204.3 GWh | Dec 1965 | May 2026 | Black Liquor : 62.5% Bituminous Coal : 16.6% Natural Gas : 11.2% Wood/Wood Waste Solids : 9.5% |
| Wellons Farm | Wellons Farm, LLC | Smithfield, NC | Duke Energy Carolinas (DUK) | 8.1 GWh | Nov 2015 | Dec 2025 | Solar |
| Wayne Solar III LLC | Wayne Solar III, LLC | Goldsboro, NC | Duke Energy Carolinas (DUK) | 3.9 GWh | Jun 2014 | Dec 2025 | Solar |
| Wayne Solar II LLC | Wayne Solar II, LLC | Goldsboro, NC | Duke Energy Carolinas (DUK) | 1.9 GWh | Jun 2014 | Dec 2025 | Solar |
| Wayne Solar I LLC | Wayne Solar I, LLC | Mount Olive, NC | Duke Energy Carolinas (DUK) | 1.9 GWh | Jun 2014 | Oct 2025 | Solar |
| Virginia Line Solar, LLC | Virginia Line Solar, LLC | Manson, NC | Duke Energy Progress East (CPLE) | 80.8 GWh | Nov 2023 | May 2026 | Solar |
| Rosemary Power Station | Virginia Electric & Power Co | Roanoke Rapids, NC | PJM Interconnection, LLC (PJM) | 21.9 GWh | Oct 1990 | Dec 2025 | Distillate Fuel Oil |
| Gaston | Virginia Electric & Power Co | Roanoke Rapids, NC | PJM Interconnection, LLC (PJM) | 135.8 GWh | Jan 1963 | May 2026 | Water |
| Roanoke Rapids | Virginia Electric & Power Co | Roanoke Rapids, NC | PJM Interconnection, LLC (PJM) | 187.2 GWh | Aug 1955 | Dec 2025 | Water |
| Violet Solar | Violet Solar, LLC | Mount Pleasant, NC | Duke Energy Carolinas (DUK) | 9.7 GWh | Nov 2018 | Dec 2025 | Solar |
| Van Buren | Van Buren Solar, LLC | Roseboro, NC | Duke Energy Progress East (CPLE) | 4.1 GWh | Feb 2021 | Dec 2025 | Solar |
| Uwharrie Mountain Renewable | Uwharrie Mountain Renewable Energy, LLC | Mt. Gilead, NC | Duke Energy Progress East (CPLE) | 32.4 GWh | Jun 2014 | Dec 2025 | Landfill Gas |
| South Robeson Farm | USF Surry, LLC | Rowland, NC | Duke Energy Progress East (CPLE) | 6.5 GWh | May 2012 | Dec 2025 | Solar |
| Progress Manis I | USF Surry, LLC | Laurinburg, NC | Duke Energy Progress East (CPLE) | 974.0 MWh | Mar 2012 | Dec 2025 | Solar |
| North Carolina Solar Bethea I | USF Surry, LLC | Laurinburg, NC | Duke Energy Progress East (CPLE) | 2.5 GWh | Mar 2012 | Dec 2025 | Solar |
| Sarah Solar | USF Surry, LLC | Louisburg, NC | Duke Energy Progress East (CPLE) | 6.3 GWh | Jun 2015 | Dec 2025 | Solar |
| Nitro Solar | USF Surry, LLC | Smitfield, NC | Duke Energy Progress East (CPLE) | 7.7 GWh | Jun 2015 | Dec 2025 | Solar |
| 4Oaks | USF Surry, LLC | Four Oaks, NC | Duke Energy Progress East (CPLE) | 5.2 GWh | Jun 2015 | Dec 2025 | Solar |
| Princeton | USF Surry, LLC | Princeton, NC | Duke Energy Progress East (CPLE) | 6.8 GWh | Jun 2015 | Dec 2025 | Solar |
| Faison Solar | USF Surry, LLC | Faison, NC | Duke Energy Progress East (CPLE) | 1.7 GWh | Jun 2015 | Dec 2025 | Solar |
| Tate Solar | USF Essex Lessor, LLC | Castalia, NC | Duke Energy Progress East (CPLE) | 9.0 GWh | Jul 2020 | Dec 2025 | Solar |
| Willard Solar | USF Essex Lessor, LLC | Willard, NC | Duke Energy Progress East (CPLE) | 7.8 GWh | Sep 2020 | Dec 2025 | Solar |
| Eagle Solar | USF Essex Lessor, LLC | Warrenton, NC | Duke Energy Progress East (CPLE) | 7.8 GWh | Jul 2020 | Dec 2025 | Solar |
| Lane II Solar, LLC | USF Essex Lessor, LLC | Goldsboro, NC | Duke Energy Progress East (CPLE) | 10.6 GWh | Jun 2020 | Dec 2025 | Solar |
| Benson Solar, LLC | USF Essex Lessor, LLC | Benson, NC | Duke Energy Progress East (CPLE) | 8.3 GWh | Jul 2020 | Dec 2025 | Solar |
| Pilot Mountain Solar, LLC | USF Essex Lessor, LLC | King, NC | Duke Energy Carolinas (DUK) | 8.8 GWh | Aug 2020 | Dec 2025 | Solar |
| Univ of NC Chapel Hill Cogen Facility | University of North Carolina | Chapel Hill, NC | Duke Energy Carolinas (DUK) | 56.7 GWh | Jun 1991 | Apr 2026 | Natural Gas : 58.2% Bituminous Coal : 41.8% |
| XPF Solar Field | United Therapeutics Corporation | Durham, NC | Duke Energy Carolinas (DUK) | 9.5 GWh | Nov 2014 | Dec 2025 | Solar |
| Trinity Solar | Trinity Solar, LLC | Trinity, NC | Duke Energy Carolinas (DUK) | 9.6 GWh | Jul 2019 | Dec 2025 | Solar |
| Edenton Generators | Town of Edenton - (NC) | Edenton, NC | PJM Interconnection, LLC (PJM) | 132.0 MWh | Nov 1988 | Dec 2025 | Distillate Fuel Oil |
| South Cary WRF Solar Array | Town Of Cary - (NC) | Apex, NC | Duke Energy Progress East (CPLE) | 2.3 GWh | Nov 2012 | Dec 2025 | Solar |
| Timbermill Wind, LLC | Timbermill Wind | Edenton, NC | PJM Interconnection, LLC (PJM) | 359.5 GWh | Nov 2024 | May 2026 | Wind |
| Thunderhead | Thunderhead Solar, LLC | Asheboro, NC | Duke Energy Progress East (CPLE) | 2.6 GWh | Nov 2021 | Dec 2025 | Solar |
| Thigpen Farms Solar, LLC | Thigpen Solar, LLC | Maxton, NC | Duke Energy Carolinas (DUK) | 10.4 GWh | Nov 2023 | Dec 2025 | Solar |
| Northern Cardinal Solar | Terraform Arcadia | Roanoke Rapids, NC | PJM Interconnection, LLC (PJM) | 1.2 GWh | May 2018 | Dec 2025 | Solar |
| Hiwassee Dam | Tennessee Valley Authority | Murphy, NC | Tennessee Valley Authority (TVA) | 213.5 GWh | Apr 1940 | May 2026 | Water |
| Fontana Dam | Tennessee Valley Authority | Fontana Dam, NC | Tennessee Valley Authority (TVA) | 900.2 GWh | Dec 1944 | Dec 2025 | Water |
| Chatuge | Tennessee Valley Authority | Hayesville, NC | Tennessee Valley Authority (TVA) | 18.9 GWh | Nov 1954 | Dec 2025 | Water |
| Sweet Tea Solar, LLC | Sweet Tea Solar, LLC | New Bern, NC | Duke Energy Progress East (CPLE) | 5.9 GWh | Mar 2021 | Dec 2025 | Solar |
| Swansboro Solar, LLC | Swansboro Solar, LLC | Maysville, NC | Duke Energy Progress East (CPLE) | 6.4 GWh | Mar 2021 | Dec 2025 | Solar |
| Clovelly Solar | SunStrong Management | Lillington, NC | Duke Energy Progress East (CPLE) | 9.3 GWh | Mar 2021 | Dec 2025 | Solar |
| Banner Solar | SunStrong Management | Benson, NC | Duke Energy Progress East (CPLE) | 10.1 GWh | Nov 2021 | Dec 2025 | Solar |
| Brick City Solar | SunStrong Management | Wallace, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Nov 2021 | Dec 2025 | Solar |
| Wyse Fork Solar Farm, LLC | SunStrong Management | Dover, NC | Duke Energy Progress East (CPLE) | 3.7 GWh | Nov 2021 | Dec 2025 | Solar |
| Spring Hope Solar 3, LLC | SunStrong Management | Spring Hope, NC | Duke Energy Progress East (CPLE) | 6.3 GWh | Nov 2020 | Dec 2025 | Solar |
| Grissom Solar, LLC | SunStrong Management | Enfield, NC | PJM Interconnection, LLC (PJM) | 10.1 GWh | Apr 2021 | Dec 2024 | Solar |
| Sugar Solar, LLC | SunStrong Management | Yadkinville, NC | Duke Energy Carolinas (DUK) | 100.9 GWh | Nov 2021 | May 2026 | Solar |
| Lick Creek Solar, LLC | SunStrong Management | Walnut Cove, NC | Duke Energy Carolinas (DUK) | 108.1 GWh | Feb 2022 | May 2026 | Solar |
| Highest Power Solar, LLC | SunStrong Management | Louisburg, NC | Duke Energy Progress East (CPLE) | 98.6 GWh | Jan 2022 | May 2026 | Solar |
| Trent River Solar, LLC | SunStrong Management | Pollocksville, NC | Duke Energy Progress East (CPLE) | 135.5 GWh | Jun 2021 | May 2026 | Solar |
| Sun Farm VIII, LLC | SunStrong Management | Battleboro, NC | PJM Interconnection, LLC (PJM) | 7.7 GWh | Nov 2020 | Dec 2025 | Solar |
| ESA Albemarle NC Solar | SunStrong Management | Albemarle, NC | Duke Energy Carolinas (DUK) | 4.2 GWh | Mar 2021 | Dec 2025 | Solar |
| Stanly Solar, LLC | SunStrong Management | Albemarle, NC | Duke Energy Carolinas (DUK) | 91.8 GWh | Jul 2022 | May 2026 | Solar |
| Broadway Road Solar, LLC | SunStrong Management | Sanford, NC | Duke Energy Progress East (CPLE) | 3.8 GWh | Nov 2021 | Dec 2025 | Solar |
| Southwick Solar | SunStrong Management | Graham, NC | Duke Energy Carolinas (DUK) | 5.8 GWh | Nov 2020 | Dec 2025 | Solar |
| Sawtell Solar | SunStrong Management | Hendersonville, NC | Duke Energy Carolinas (DUK) | 5.0 GWh | Mar 2021 | Dec 2025 | Solar |
| Saw Solar | SunStrong Management | China Grove, NC | Duke Energy Carolinas (DUK) | 10.6 GWh | May 2022 | Dec 2025 | Solar |
| Overman Solar | SunStrong Management | Goldsboro, NC | Duke Energy Progress East (CPLE) | 10.8 GWh | Nov 2021 | Dec 2025 | Solar |
| Oakwood Solar | SunStrong Management | Mebane, NC | Duke Energy Carolinas (DUK) | 9.8 GWh | May 2021 | Dec 2025 | Solar |
| Scotch Bonnet Solar, LLC | SunStrong Management | St Helena, NC | Duke Energy Progress East (CPLE) | 6.0 GWh | Nov 2020 | Dec 2025 | Solar |
| Cubera Solar, LLC | SunStrong Management | Dunn, NC | Duke Energy Progress East (CPLE) | 3.3 GWh | Dec 2019 | Dec 2025 | Solar |
| ESA Hamlet NC , LLC | SunStrong Management | Hamlet, NC | Duke Energy Progress East (CPLE) | 5.9 GWh | May 2020 | Dec 2025 | Solar |
| Millers Chapel Solar | SunStrong Management | La Grange, NC | Duke Energy Progress East (CPLE) | 8.0 GWh | Nov 2021 | Dec 2025 | Solar |
| Coogee Solar | SunStrong Management | Grantsboro, NC | Duke Energy Progress East (CPLE) | 10.7 GWh | Nov 2021 | Dec 2025 | Solar |
| Robin Solar | SunStrong Management | Dudley, NC | Duke Energy Carolinas (DUK) | 7.4 GWh | Dec 2020 | Dec 2025 | Solar |
| Cash Solar | SunStrong Management | Nashville, NC | Duke Energy Carolinas (DUK) | 10.0 GWh | Nov 2020 | Dec 2025 | Solar |
| Lane Solar | SunStrong Management | Goldsboro, NC | Duke Energy Progress East (CPLE) | 8.8 GWh | Aug 2018 | Dec 2025 | Solar |
| High Shoals PV1 | SunStrong Management | High Shoals, NC | Duke Energy Carolinas (DUK) | 30.7 GWh | Mar 2022 | Dec 2025 | Solar |
| Page Solar | SunStrong Management | Willow Spring, NC | Duke Energy Progress East (CPLE) | 2.4 GWh | Nov 2018 | Dec 2025 | Solar |
| Alpha Value Solar | SunStrong Management | Hertford, NC | PJM Interconnection, LLC (PJM) | 9.0 GWh | Nov 2019 | Dec 2025 | Solar |
| Quarter Horse Solar | SunStrong Management | Hampstead, NC | Duke Energy Progress East (CPLE) | 9.4 GWh | Oct 2018 | Dec 2025 | Solar |
| Atkinson Solar II | SunStrong Management | Beulaville, NC | Duke Energy Progress East (CPLE) | 2.8 GWh | Sep 2018 | Dec 2025 | Solar |
| Warrenton I Solar | SunStrong Management | Warrenton, NC | Duke Energy Progress East (CPLE) | 8.9 GWh | Nov 2018 | Dec 2025 | Solar |
| Bladenboro Solar 2 | SunStrong Management | Bladenboro, NC | Duke Energy Progress East (CPLE) | 8.6 GWh | Jul 2018 | Dec 2025 | Solar |
| Sadiebrook NC Solar | SunStrong Management | Clarkton, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | May 2018 | Dec 2025 | Solar |
| BRE NC Solar 3 | SunStrong Management | Oxford, NC | Duke Energy Progress East (CPLE) | 9.6 GWh | Nov 2021 | Dec 2025 | Solar |
| Soluga Farms IV | SunStrong Management | Godwin, NC | Southeastern Power Administration (SEPA) | 5.3 GWh | Aug 2018 | Dec 2025 | Solar |
| Pine Valley Solar Farm, LLC | SunStrong Management | West End, NC | Duke Energy Carolinas (DUK) | 9.3 GWh | Apr 2022 | Dec 2025 | Solar |
| ESA Four Oaks 2 NC LLC | SunStrong Management | Four Oaks, NC | Duke Energy Progress East (CPLE) | 2.9 GWh | Nov 2019 | Dec 2025 | Solar |
| HCE Moore I | SunStrong Management | Aberdeen, NC | Duke Energy Progress East (CPLE) | 886.0 MWh | Nov 2018 | Dec 2025 | Solar |
| Three Bridge | SunStrong Management | Pembroke, NC | Duke Energy Progress East (CPLE) | 3.0 GWh | Nov 2018 | Apr 2025 | Solar |
| Chowan Jehu Solar | SunStrong Management | Tyner, NC | PJM Interconnection, LLC (PJM) | 7.6 GWh | Jan 2018 | Dec 2025 | Solar |
| Sandy Solar | SunStrong Management | Shiloh Township, NC | PJM Interconnection, LLC (PJM) | 8.4 GWh | Feb 2018 | Oct 2025 | Solar |
| Shiloh Hwy Solar | SunStrong Management | Shiloh, NC | PJM Interconnection, LLC (PJM) | 8.6 GWh | Nov 2017 | Dec 2025 | Solar |
| Sunflower Solar | Sunflower Solar, LLC | Halifax, NC | PJM Interconnection, LLC (PJM) | 31.3 GWh | Nov 2017 | Dec 2025 | Solar |
| SunEnergy1-Scotland Neck, LLC | SunEnergy1-Scotland Neck, LLC | Scotland Neck, NC | PJM Interconnection, LLC (PJM) | 5.1 GWh | Nov 2014 | Dec 2025 | Solar |
| Plymouth Solar LLC | SunEnergy1 | Plymouth, NC | PJM Interconnection, LLC (PJM) | 6.0 GWh | Aug 2012 | Dec 2025 | Solar |
| SunEdison LV Sutton Plant Site | SunE NC Progress 1 LLC | Wilmington, NC | Duke Energy Progress East (CPLE) | 736.0 MWh | Nov 2008 | Dec 2025 | Solar |
| Davidson III | SunE B9 Holdings, LLC | Lexington, NC | Duke Energy Carolinas (DUK) | 6.7 GWh | Nov 2010 | Dec 2025 | Solar |
| Davidson IV | SunE B9 Holdings, LLC | Lexington, NC | Duke Energy Carolinas (DUK) | 4.7 GWh | Nov 2010 | Dec 2025 | Solar |
| Davidson V | SunE B9 Holdings, LLC | Lexington, NC | Duke Energy Carolinas (DUK) | 2.2 GWh | Nov 2010 | Dec 2025 | Solar |
| Suncaster, LLC | Suncaster, LLC | Pikeville, NC | Duke Energy Progress East (CPLE) | 3.4 GWh | Mar 2021 | Dec 2025 | Solar |
| Sugar Run Solar | Sugar Run Solar, LLC | Sunbury, NC | PJM Interconnection, LLC (PJM) | 8.3 GWh | Nov 2015 | Dec 2025 | Solar |
| Williamston West Farm, LLC | Strata Manager, LLC | Williamston, NC | PJM Interconnection, LLC (PJM) | 8.8 GWh | Jun 2016 | Dec 2025 | Solar |
| Moorings Farm | Strata Manager, LLC | New Hope, NC | Duke Energy Progress East (CPLE) | 7.9 GWh | Aug 2013 | Dec 2025 | Solar |