Directory of Power Plants in North Carolina
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Benthall Bridge PV 1 | Ecoplexus, Inc | Murfreesboro, NC | PJM Interconnection, LLC (PJM) | 8.8 GWh | Nov 2016 | Dec 2024 | Solar |
Green Farm | Cypress Creek Renewables | Robersonville, NC | PJM Interconnection, LLC (PJM) | 9.3 GWh | Dec 2015 | Dec 2024 | Solar |
Cork Oak Solar | Cork Oak Solar, LLC | Halifax, NC | PJM Interconnection, LLC (PJM) | 38.3 GWh | Nov 2017 | Dec 2024 | Solar |
Garysburg Solar | Duke Energy Renewables Services | Garysburg, NC | PJM Interconnection, LLC (PJM) | 7.0 GWh | Feb 2016 | Dec 2024 | Solar |
Northern Cardinal Solar | Terraform Arcadia | Roanoke Rapids, NC | PJM Interconnection, LLC (PJM) | 3.0 GWh | May 2018 | Dec 2024 | Solar |
Harts Mill Solar, LLC | Harts Mills Solar, LLC | Tarboro, NC | PJM Interconnection, LLC (PJM) | 175.4 GWh | Nov 2020 | Mar 2025 | Solar |
Albemarle Beach Solar | Albemarle Beach Solar, LLC | Roper, NC | PJM Interconnection, LLC (PJM) | 221.6 GWh | Nov 2020 | Mar 2025 | Solar |
SunEnergy1-Scotland Neck, LLC | SunEnergy1-Scotland Neck, LLC | Scotland Neck, NC | PJM Interconnection, LLC (PJM) | 5.7 GWh | Nov 2014 | Dec 2024 | Solar |
Meadows PV 1 | Fresh Air Energy XVIII, LLC | Williamston, NC | PJM Interconnection, LLC (PJM) | 5.0 GWh | May 2016 | Dec 2024 | Solar |
Flat Meeks PV 1 | Ecoplexus, Inc | Robersonville, NC | PJM Interconnection, LLC (PJM) | 9.4 GWh | Sep 2017 | Dec 2024 | Solar |
Pasquotank | Duke Energy Renewables Services | Elizabeth City, NC | PJM Interconnection, LLC (PJM) | 31.7 GWh | Nov 2014 | Dec 2024 | Solar |
Sun Farm VIII, LLC | Sun Farm VIII, LLC | Battleboro, NC | PJM Interconnection, LLC (PJM) | 7.7 GWh | Nov 2020 | Dec 2024 | Solar |
American Legion PV 1 | Ecoplexus, Inc | Roanoke Rapids, NC | PJM Interconnection, LLC (PJM) | 23.2 GWh | Nov 2017 | Dec 2024 | Solar |
Baker PV 1 | Ecoplexus, Inc | Aulander, NC | PJM Interconnection, LLC (PJM) | 8.7 GWh | Nov 2016 | Dec 2024 | Solar |
Rosemary Power Station | Virginia Electric & Power Co | Roanoke Rapids, NC | PJM Interconnection, LLC (PJM) | 6.5 GWh | Oct 1990 | Dec 2023 | Distillate Fuel Oil |
Kelford | Duke Energy Renewables Services | Lewiston Woodville, NC | PJM Interconnection, LLC (PJM) | 39.1 GWh | Nov 2015 | Dec 2024 | Solar |
Whitakers | Duke Energy Renewables Services | Whitakers, NC | PJM Interconnection, LLC (PJM) | 21.8 GWh | Nov 2015 | Dec 2024 | Solar |
SoINCPower6, LLC | Duke Energy Renewables Services | Sunbury, NC | PJM Interconnection, LLC (PJM) | 10.5 GWh | Sep 2015 | Dec 2024 | Solar |
Domtar Paper Co LLC Plymouth NC | Domtar Paper Company LLC | Plymouth, NC | PJM Interconnection, LLC (PJM) | 360.8 GWh | Aug 1952 | Dec 2024 | Black Liquor : 51.8% Wood/Wood Waste Solids : 37.5% Natural Gas : 9.6% Distillate Fuel Oil : 1.1% |
KapStone Kraft Paper Corp | Westrock Kraft Paper, LLC | Roanoke Rapids, NC | PJM Interconnection, LLC (PJM) | 189.7 GWh | Dec 1965 | Mar 2025 | Black Liquor : 64.4% Bituminous Coal : 15.5% Natural Gas : 11.3% Wood/Wood Waste Solids : 8.4% |
SoINCPower5, LLC | Duke Energy Renewables Services | Battleboro, NC | PJM Interconnection, LLC (PJM) | 8.3 GWh | Apr 2015 | Dec 2024 | Solar |
Gliden (Op Zone) | Greenbacker Renewable Energy Corporation | Tyner, NC | PJM Interconnection, LLC (PJM) | 8.0 GWh | Nov 2020 | Dec 2024 | Solar |
Everett PV1 | Ecoplexus, Inc | Parmele, NC | PJM Interconnection, LLC (PJM) | 23.7 GWh | Nov 2019 | Dec 2024 | Solar |
Grandy PV 1 | Ecoplexus, Inc | Grandy, NC | PJM Interconnection, LLC (PJM) | 29.2 GWh | Jan 2020 | Dec 2024 | Solar |
Grissom Solar, LLC | Grissom Solar, LLC | Enfield, NC | PJM Interconnection, LLC (PJM) | 10.6 GWh | Apr 2021 | Dec 2023 | Solar |
Oak Solar | Oak Solar LLC | Gaston, NC | PJM Interconnection, LLC (PJM) | 214.4 GWh | Nov 2023 | Mar 2025 | Solar |
Timbermill Wind, LLC | Timbermill Wind | Edenton, NC | PJM Interconnection, LLC (PJM) | 132.2 GWh | Nov 2024 | Mar 2025 | Wind |
Colice Hall Solar | Colice Hall Solar LLC | Ahoskie, NC | PJM Interconnection, LLC (PJM) | 33.0 GWh | Jun 2023 | Dec 2024 | Solar |
Hot Springs Energy Storage & Microgrid | Duke Energy Progress - (NC) | Hot Springs, NC | Duke Energy Progress West (CPLW) | 2.5 GWh | Jun 2022 | Dec 2024 | Solar |
Cookstown | Strata Manager, LLC | Goldsboro, NC | Duke Energy Progress West (CPLW) | 10.3 GWh | Jan 2019 | Dec 2024 | Solar |
Starr | Strata Manager, LLC | Clinton, NC | Duke Energy Progress West (CPLW) | 10.8 GWh | Feb 2019 | Dec 2024 | Solar |
Badger | Strata Manager, LLC | Maysville, NC | Duke Energy Progress West (CPLW) | 10.6 GWh | Feb 2019 | Dec 2024 | Solar |
Woodfin Solar | Duke Energy Progress - (NC) | Asheville, NC | Duke Energy Progress West (CPLW) | 2.2 GWh | May 2024 | Sep 2024 | Solar |
Arborgate Solar | Strata Manager, LLC | Pittsboro, NC | Duke Energy Progress West (CPLW) | 9.5 GWh | Jan 2019 | Dec 2024 | Solar |
Franklinton Solar | Cypress Creek Renewables | Franklinton, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Feb 2017 | Dec 2024 | Solar |
ESA Selma | SRE Utility Solar 1, LLC | Selma, NC | Duke Energy Progress East (CPLE) | 811.0 MWh | Aug 2015 | Dec 2024 | Solar |
Wake County LFG Facility | Ingenco Renewable Development, LLC | Apex, NC | Duke Energy Progress East (CPLE) | 57.9 GWh | Aug 2013 | Dec 2023 | Landfill Gas : 95.0% Distillate Fuel Oil : 5.0% |
CII Methane Management IV, LLC | Frontier Operation Services | Smithfield, NC | Duke Energy Progress East (CPLE) | 11.3 GWh | May 2014 | Dec 2024 | Landfill Gas |
Red Hill Solar Center, LLC | SRE Utility Solar 1, LLC | Warrenton, NC | Duke Energy Progress East (CPLE) | 7.5 GWh | Nov 2014 | Dec 2024 | Solar |
Van Slyke Solar Center, LLC | SRE Utility Solar 1, LLC | Elm City, NC | Duke Energy Progress East (CPLE) | 8.8 GWh | Nov 2014 | Dec 2024 | Solar |
Broadway Solar Center, LLC | SRE Utility Solar 1, LLC | Chadbourn, NC | Duke Energy Progress East (CPLE) | 8.3 GWh | Nov 2014 | Dec 2024 | Solar |
Sweetgum Solar | SRE Utility Solar 1, LLC | Sanford, NC | Duke Energy Progress East (CPLE) | 9.3 GWh | Nov 2015 | Dec 2024 | Solar |
South Louisburg Solar | Cypress Creek Renewables | Louisburg, NC | Duke Energy Progress East (CPLE) | 9.9 GWh | Aug 2016 | Dec 2024 | Wind |
Balsam | SRE Utility Solar 1, LLC | Sanford, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Nov 2015 | Dec 2024 | Solar |
Hickory | Current Energy Group | Rose Hill, NC | Duke Energy Progress East (CPLE) | 7.8 GWh | Nov 2019 | Dec 2024 | Solar |
Royal Solar | Cypress Creek Renewables | Godwin, NC | Duke Energy Progress East (CPLE) | 8.3 GWh | Jul 2015 | Dec 2024 | Solar |
Kinston Solar | Cypress Creek Renewables | Grifton, NC | Duke Energy Progress East (CPLE) | 7.6 GWh | Jul 2015 | Dec 2024 | Solar |
Innovative Solar 67 | John Laing US Solar Corp. | Willard, NC | Duke Energy Progress East (CPLE) | 65.7 GWh | Nov 2018 | Mar 2025 | Solar |
Southerland Farm Solar | Strata Manager, LLC | Henderson, NC | Duke Energy Progress East (CPLE) | 9.5 GWh | Oct 2016 | Dec 2024 | Solar |
Snow Camp Solar, LLC | Cypress Creek Renewables | Snow Camp, NC | Duke Energy Progress East (CPLE) | 11.1 GWh | Feb 2016 | Dec 2024 | Solar |
Pollocksville Solar | Cypress Creek Renewables | Pollocksville, NC | Duke Energy Progress East (CPLE) | 8.6 GWh | Nov 2016 | Dec 2024 | Solar |
Lillington Solar | Altus Power America Management, LLC | Lillington, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Sep 2017 | Dec 2024 | Solar |
ESA Smithfield | SRE Utility Solar 1, LLC | Smithfield, NC | Duke Energy Progress East (CPLE) | 3.1 GWh | Sep 2015 | Dec 2024 | Solar |
Monroe Solar Facility | Duke Energy Carolinas, LLC | Monroe, NC | Duke Energy Progress East (CPLE) | 90.7 GWh | Feb 2017 | Mar 2025 | Solar |
Tides Lane Farm | Strata Manager, LLC | Louisburg, NC | Duke Energy Progress East (CPLE) | 4.8 GWh | Sep 2019 | Dec 2024 | Solar |
Sellers Farm Solar | Strata Manager, LLC | Hamlet, NC | Duke Energy Progress East (CPLE) | 9.9 GWh | Apr 2022 | Dec 2024 | Solar |
McGrigor Farm Solar | Carolina Solar Energy LLC | Clinton, NC | Duke Energy Progress East (CPLE) | 9.9 GWh | Sep 2019 | Dec 2024 | Solar |
Innovative Solar 42 | Innovative Solar 42, LLC | Fayetteville, NC | Duke Energy Progress East (CPLE) | 120.9 GWh | Aug 2017 | Mar 2025 | Solar |
Innovative Solar 31 | MN8 Energy LLC | Bladenboro, NC | Duke Energy Progress East (CPLE) | 59.4 GWh | Dec 2016 | Mar 2025 | Solar |
Laurinburg Solar | Cypress Creek Renewables | Laurinburg, NC | Duke Energy Progress East (CPLE) | 8.0 GWh | Jul 2015 | Dec 2024 | Solar |
Wadesboro Farm 2 | Strata Manager, LLC | Wadesboro, NC | Duke Energy Progress East (CPLE) | 9.8 GWh | May 2016 | Dec 2024 | Solar |
Wadesboro Farm 3 | Strata Manager, LLC | Wadesboro, NC | Duke Energy Progress East (CPLE) | 9.7 GWh | Mar 2016 | Dec 2024 | Solar |
Hector Farm | Strata Manager, LLC | Troy, NC | Duke Energy Progress East (CPLE) | 9.4 GWh | Feb 2017 | Dec 2024 | Solar |
Kojak Farm | Strata Manager, LLC | Bailey, NC | Duke Energy Progress East (CPLE) | 9.3 GWh | May 2016 | Dec 2024 | Solar |
Meriwether Farm | Strata Manager, LLC | Oxford, NC | Duke Energy Progress East (CPLE) | 8.5 GWh | Aug 2016 | Dec 2024 | Solar |
Shoe Creek Solar, LLC | Cypress Creek Renewables | Laurinburg, NC | Duke Energy Progress East (CPLE) | 129.7 GWh | Nov 2017 | Mar 2025 | Solar |
Choco Solar, LLC | Choco Solar LLC | Chocowinity, NC | Duke Energy Progress East (CPLE) | 8.9 GWh | Nov 2014 | Dec 2024 | Solar |
Beaufort Solar, LLC | Capital Power Corporation | Chocowinity, NC | Duke Energy Progress East (CPLE) | 24.6 GWh | Nov 2015 | Dec 2024 | Solar |
Newton Grove | SRE Utility Solar 1, LLC | Newton Grove, NC | Duke Energy Progress East (CPLE) | 2.8 GWh | Aug 2015 | Dec 2024 | Solar |
Mills Anson Farm | Strata Manager, LLC | Lilesville, NC | Duke Energy Progress East (CPLE) | 8.8 GWh | May 2016 | Dec 2024 | Solar |
Cotten Farm, LLC | Heelstone Energy Holdings, LLC | Sanford, NC | Duke Energy Progress East (CPLE) | 9.0 GWh | Oct 2016 | Dec 2024 | Solar |
ZV Solar 1 | Cypress Creek Renewables | Red Springs, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | May 2016 | Dec 2024 | Solar |
Atkinson Farm Solar | Strata Manager, LLC | Beulaville, NC | Duke Energy Progress East (CPLE) | 9.5 GWh | Nov 2015 | Dec 2024 | Solar |
Siler 421 Farm, LLC | Heelstone Energy Holdings, LLC | Siler City, NC | Duke Energy Progress East (CPLE) | 9.6 GWh | Nov 2016 | Dec 2024 | Solar |
Stone Solar | Strata Manager, LLC | Lumberton, NC | Duke Energy Progress East (CPLE) | 10.0 GWh | Jul 2016 | Dec 2024 | Solar |
Wadesboro Farm 1 | Strata Manager, LLC | Wadesboro, NC | Duke Energy Progress East (CPLE) | 8.9 GWh | Feb 2015 | Dec 2024 | Solar |
Delco Farm | Strata Manager, LLC | Riegelwood, NC | Duke Energy Progress East (CPLE) | 8.7 GWh | May 2016 | Dec 2024 | Solar |
Kinston Davis Farm | Strata Manager, LLC | Kinston, NC | Duke Energy Progress East (CPLE) | 9.0 GWh | Feb 2015 | Dec 2024 | Solar |
Ruskin Solar | Cypress Creek Renewables | Dudley, NC | Duke Energy Progress East (CPLE) | 3.9 GWh | Oct 2017 | Dec 2024 | Solar |
Old Wire Farm | Strata Manager, LLC | Laurel Hill, NC | Duke Energy Progress East (CPLE) | 10.3 GWh | Nov 2016 | Dec 2024 | Solar |
Railroad Farm 2 | Strata Manager, LLC | St. Pauls, NC | Duke Energy Progress East (CPLE) | 9.7 GWh | Sep 2014 | Dec 2024 | Solar |
Sampson Solar | Strata Manager, LLC | Roseboro, NC | Duke Energy Progress East (CPLE) | 4.0 GWh | Jun 2015 | Dec 2024 | Solar |
Wadesboro Solar | Oppidum Renewables USA, LLC | Wadesboro, NC | Duke Energy Progress East (CPLE) | 8.9 GWh | Nov 2017 | Dec 2024 | Solar |
Barker Solar, LLC | Altus Power America Management, LLC | Lumberton, NC | Duke Energy Progress East (CPLE) | 8.7 GWh | Nov 2017 | Dec 2024 | Solar |
231 Dixon 74 Solar I, LLC | Altus Power America Management, LLC | Kings Mountain, NC | Duke Energy Progress East (CPLE) | 3.7 GWh | Jul 2017 | Dec 2024 | Solar |
Mill Pond Solar Farm, LLC | Altus Power America Management, LLC | Whiteville, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Sep 2017 | Dec 2024 | Solar |
Bay Branch Solar | Sol Systems | Chocowinity, NC | Duke Energy Progress East (CPLE) | 11.0 GWh | Nov 2018 | Dec 2024 | Solar |
Innovative Solar 54 | John Laing US Solar Corp. | Kinston, NC | Duke Energy Progress East (CPLE) | 98.8 GWh | Nov 2018 | Mar 2025 | Solar |
Innovative Solar 47 | MN8 Energy LLC | Maxton, NC | Duke Energy Progress East (CPLE) | 57.2 GWh | Mar 2017 | Mar 2025 | Solar |
Cornwall Solar Center, LLC | SRE Utility Solar 1, LLC | Oxford, NC | Duke Energy Progress East (CPLE) | 7.8 GWh | Sep 2016 | Dec 2024 | Solar |
FLS Solar 230 (Warren) | Cypress Creek Renewables | Albertson, NC | Duke Energy Progress East (CPLE) | 8.5 GWh | Apr 2015 | Dec 2024 | Solar |
Mt Olive Solar 1 | Cypress Creek Renewables | Mt. Olive, NC | Duke Energy Progress East (CPLE) | 7.7 GWh | Apr 2015 | Dec 2024 | Solar |
Soul City Solar | Cypress Creek Renewables | Norlina, NC | Duke Energy Progress East (CPLE) | 5.3 GWh | Mar 2015 | Dec 2024 | Solar |
Vicksburg Solar | Cypress Creek Renewables | Henderson, NC | Duke Energy Progress East (CPLE) | 8.7 GWh | Apr 2015 | Dec 2024 | Solar |
Albertson Solar LLC | Albertson Solar LLC | Albertson, NC | Duke Energy Progress East (CPLE) | 10.4 GWh | Jun 2015 | Dec 2024 | Solar |
Innovative Solar 46 | Cypress Creek Renewables | Hope Mills, NC | Duke Energy Progress East (CPLE) | 136.1 GWh | Nov 2016 | Mar 2025 | Solar |
Brantley Solar | John Laing US Solar Corp. | Spring Hope, NC | Duke Energy Progress East (CPLE) | 99.8 GWh | Sep 2018 | Mar 2025 | Solar |
Fox Creek Solar | John Laing US Solar Corp. | Louisburg, NC | Duke Energy Progress East (CPLE) | 81.7 GWh | Oct 2018 | Mar 2025 | Solar |
BRE NC Solar 3 | Pine Gate Renewables | Oxford, NC | Duke Energy Progress East (CPLE) | 10.0 GWh | Nov 2021 | Dec 2024 | Solar |
North Nash Farm, LLC | Strata Manager, LLC | Castalia, NC | Duke Energy Progress East (CPLE) | 9.5 GWh | Nov 2015 | Dec 2024 | Solar |