| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| NSF Danby Site 3, LLC | NSF Energy Two, LLC | Ithaca, NY | New York Independent System Operator (NYIS) | 4.8 GWh | Nov 2024 | Dec 2025 | Solar |
| SSC Oswego II LLC | Reactivate | Oswego, NY | New York Independent System Operator (NYIS) | 6.6 GWh | Oct 2024 | Dec 2025 | Solar |
| Princetown Solar 1 | AES Clean Energy | Duanesburg, NY | New York Independent System Operator (NYIS) | 6.8 GWh | Oct 2024 | Dec 2025 | Solar |
| Independence Road (CSG) | AETS OpCo Holdings LLC | Independence, NY | New York Independent System Operator (NYIS) | 8.4 GWh | Oct 2024 | Dec 2025 | Solar |
| Ruhlmann A (CSG) | AETS OpCo Holdings LLC | Lockport, NY | New York Independent System Operator (NYIS) | 7.8 GWh | Oct 2024 | Dec 2025 | Solar |
| Ticon Solar | Ticon Solar, LLC | Ticonderoga, NY | New York Independent System Operator (NYIS) | 7.6 GWh | Oct 2024 | Dec 2025 | Solar |
| Rush Solar | Rush Solar Farm 1, LLC | Rush, NY | New York Independent System Operator (NYIS) | 556.0 MWh | Oct 2024 | Sep 2025 | Solar |
| Enfield Solar Site 2 | NSF Enfield Site 2, LLC | Enfield, NY | New York Independent System Operator (NYIS) | 7.1 GWh | Oct 2024 | Dec 2025 | Solar |
| Enfield Solar Site 3 | NSF Enfield Site 3, LLC | Enfield, NY | New York Independent System Operator (NYIS) | 7.1 GWh | Oct 2024 | Dec 2025 | Solar |
| Enfield Solar Site 1 | NSF Enfield Site 1, LLC | Enfield, NY | New York Independent System Operator (NYIS) | 7.1 GWh | Oct 2024 | Dec 2025 | Solar |
| Morris Ridge Solar | Morris Ridge Solar Energy Center, LLC | Mount Morris, NY | New York Independent System Operator (NYIS) | 305.5 GWh | Oct 2024 | May 2026 | Solar |
| Swaggertown Solar I | Green Street Power Partners | Glenville, NY | ISO New England (ISNE) | 3.9 GWh | Oct 2024 | Dec 2025 | Solar |
| Hanover Road | Bullrock-NxtGenREA | Hanover, NY | New York Independent System Operator (NYIS) | 3.5 GWh | Oct 2024 | Dec 2025 | Solar |
| Claverack Creek Solar | Claverack Creek Solar, LLC | Hudson, NY | New York Independent System Operator (NYIS) | 7.8 GWh | Sep 2024 | Dec 2025 | Solar |
| Niagara Solar Project | DG Niagara, LLC | Randomville, NY | New York Independent System Operator (NYIS) | 4.9 GWh | Sep 2024 | Dec 2025 | Solar |
| CAMILLUS B (CSG) | AETS OpCo Holdings LLC | Camillus, NY | New York Independent System Operator (NYIS) | 7.9 GWh | Sep 2024 | Dec 2025 | Solar |
| CAMILLUS A (CSG) | AETS OpCo Holdings LLC | Camillus, NY | New York Independent System Operator (NYIS) | 8.2 GWh | Sep 2024 | Dec 2025 | Solar |
| Kilmer | Kilmer Solar LLC | Ransomville, NY | New York Independent System Operator (NYIS) | 4.7 GWh | Sep 2024 | Dec 2025 | Solar |
| Manlius East | CVE US EI5 Manlius East LLC | Manlius, NY | New York Independent System Operator (NYIS) | 8.9 GWh | Sep 2024 | Dec 2025 | Solar |
| Manlius North | CVE US EI4 Manlius North LLC | Manlius, NY | New York Independent System Operator (NYIS) | 2.7 GWh | Sep 2024 | Dec 2025 | Solar |
| Manlius West | CVE US EI5 Manlius West LLC | Manlius, NY | New York Independent System Operator (NYIS) | 7.7 GWh | Sep 2024 | Dec 2025 | Solar |
| North Troy | Onyx Asset Services Group | Troy, NY | New York Independent System Operator (NYIS) | 507.0 MWh | Sep 2024 | Dec 2024 | Solar |
| Pivot Solar NY 4 | Pivot Energy | Verona, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Sep 2024 | Dec 2025 | Solar |
| Pivot Niagara Solar | Pivot Energy | Lewiston, NY | New York Independent System Operator (NYIS) | 5.6 GWh | Sep 2024 | Dec 2025 | Solar |
| Jericho | Bullrock-NxtGenREA | Alfred, NY | New York Independent System Operator (NYIS) | 7.7 GWh | Sep 2024 | Dec 2025 | Solar |
| Comfort CSG | Nautilus Solar Solutions | Grand Island, NY | New York Independent System Operator (NYIS) | 7.8 GWh | Aug 2024 | Dec 2025 | Solar |
| CES Heuvelton | Heuvelton Solar, LLC | Ogdensburg, NY | New York Independent System Operator (NYIS) | 6.5 GWh | Aug 2024 | Dec 2025 | Solar |
| Swaggertown Solar II | Green Street Power Partners | Glenville, NY | ISO New England (ISNE) | 7.0 GWh | Aug 2024 | Dec 2025 | Solar |
| Angell Road | Bullrock-NxtGenREA | Hanover, NY | New York Independent System Operator (NYIS) | 4.1 GWh | Aug 2024 | Dec 2025 | Solar |
| Kirkland | Bullrock-NxtGenREA | Kirkland, NY | New York Independent System Operator (NYIS) | 5.8 GWh | Aug 2024 | Dec 2025 | Solar |
| Northline Solar CSG | AES Clean Energy | Schaghticoke, NY | New York Independent System Operator (NYIS) | 5.3 GWh | Aug 2024 | Dec 2025 | Solar |
| High River Energy Center, LLC | High River Energy Center, LLC | Florida, NY | New York Independent System Operator (NYIS) | 148.7 GWh | Jul 2024 | May 2026 | Solar |
| NY Hermon 1040 County Rd 21 | Solitude Solar Russell County Rd 21 Microgrid, LLC | Hermon, NY | New York Independent System Operator (NYIS) | 2.3 GWh | Jul 2024 | Dec 2025 | Solar |
| NY SHERMAN 176 W MAIN ST - SL 1 | SL Sherman, LLC | Sherman, NY | New York Independent System Operator (NYIS) | 2.8 GWh | Jul 2024 | Dec 2025 | Solar |
| Krumkill Road Solar North, LLC | Generate Capital | Guilderland, NY | New York Independent System Operator (NYIS) | 6.4 GWh | Jul 2024 | Dec 2025 | Solar |
| Krumkill Road Solar South, LLC | Generate Capital | Guilderland, NY | New York Independent System Operator (NYIS) | 5.4 GWh | Jul 2024 | Dec 2025 | Solar |
| Bodhi Solar | Bodhi Solar, LLC | Wheatfield, NY | New York Independent System Operator (NYIS) | 7.9 GWh | Jul 2024 | Dec 2025 | Solar |
| FFP - NY Burch CSG | Distributed Solar Development, LLC | Hartford, NY | New York Independent System Operator (NYIS) | 3.9 GWh | Jun 2024 | Dec 2025 | Solar |
| NY Avon I CSG | DG Empire Sun, LLC | Avon, NY | New York Independent System Operator (NYIS) | 3.8 GWh | Jun 2024 | Dec 2025 | Solar |
| Clemons Road Solar | RPNY Solar 4, LLC | Minoa, NY | ISO New England (ISNE) | 4.1 GWh | Jun 2024 | Dec 2025 | Solar |
| Pike Road Solar (NY) | RPNY Solar 6, LLC | Batavia, NY | ISO New England (ISNE) | 4.7 GWh | Jun 2024 | Dec 2025 | Solar |
| Alexander Road Solar | RPNY Solar 7, LLC | Batavia, NY | ISO New England (ISNE) | 2.6 GWh | Jun 2024 | Dec 2025 | Solar |
| Independence East | AETS OpCo Holdings LLC | Independence, NY | New York Independent System Operator (NYIS) | 6.9 GWh | Jun 2024 | Dec 2025 | Solar |
| Randall Road Solar I | Green Street Power Partners | Ballston Spa, NY | ISO New England (ISNE) | 5.2 GWh | Jun 2024 | Dec 2025 | Solar |
| Randall Road Solar II | Green Street Power Partners | Ballston Spa, NY | ISO New England (ISNE) | 3.0 GWh | Jun 2024 | Dec 2025 | Solar |
| ASA Clayton NY Solar I LLC | ASA Clayton NY Solar I LLC | Clayton, NY | New York Independent System Operator (NYIS) | 2.6 GWh | Jun 2024 | Dec 2025 | Solar |
| South Fork Wind | Orsted Wind Power North America LLC | East Hampton, NY | New York Independent System Operator (NYIS) | 507.2 GWh | Jun 2024 | May 2026 | Wind |
| ASA Gouverneur NY Solar I LLC | ASA Gouverneur NY Solar I LLC | Richville, NY | New York Independent System Operator (NYIS) | 2.5 GWh | May 2024 | Dec 2025 | Solar |
| Peterboro (CSG) | Nautilus Solar Solutions | Vernon, NY | New York Independent System Operator (NYIS) | 6.8 GWh | May 2024 | Dec 2025 | Solar |
| Ny Frankfort Bleecker St - Frankfort -NG | Frankfort Solar Farm LLC | Frankfort, NY | New York Independent System Operator (NYIS) | 5.4 GWh | May 2024 | Dec 2025 | Solar |
| NSF Aurelius Site 1 LLC | NSF Energy One LLC | Auburn, NY | New York Independent System Operator (NYIS) | 8.8 GWh | May 2024 | Dec 2025 | Solar |
| NSF Aurelius Site 2, LLC | NSF Energy One LLC | Auburn, NY | New York Independent System Operator (NYIS) | 8.7 GWh | May 2024 | Dec 2025 | Solar |
| NSF Aurelius Site 3 LLC | NSF Energy One LLC | Auburn, NY | New York Independent System Operator (NYIS) | 8.8 GWh | May 2024 | Dec 2025 | Solar |
| NSF Aurelius Site 4 LLC | NSF Energy One LLC | Auburn, NY | New York Independent System Operator (NYIS) | 6.7 GWh | May 2024 | Dec 2025 | Solar |
| Belair | CVE US EI7 Belair LLC | Troy, NY | New York Independent System Operator (NYIS) | 6.2 GWh | May 2024 | Dec 2025 | Solar |
| Maple North 1 | Scale Sustainable I, LLC | Amsterdam, NY | New York Independent System Operator (NYIS) | 7.0 GWh | May 2024 | Dec 2025 | Solar |
| Maple North 2 | Scale Sustainable I, LLC | Amsterdam, NY | New York Independent System Operator (NYIS) | 6.3 GWh | May 2024 | Dec 2025 | Solar |
| Maple West | Scale Sustainable I, LLC | Amsterdam, NY | New York Independent System Operator (NYIS) | 9.8 GWh | May 2024 | Dec 2025 | Solar |
| State HWY 17C | Bullrock-NxtGenREA | Tioga, NY | New York Independent System Operator (NYIS) | 7.2 GWh | May 2024 | Dec 2025 | Solar |
| Copenhagen Solar | NY USLE Copenhagen CR194 LLC | Copenhagen, NY | New York Independent System Operator (NYIS) | 5.1 GWh | Apr 2024 | Dec 2025 | Solar |
| NY Sorrell Hill II CSG | DG Empire Lumen 2023, LLC | Baldwinsville, NY | New York Independent System Operator (NYIS) | 5.3 GWh | Apr 2024 | Dec 2025 | Solar |
| County Route 11B | Generate Capital | Mooers Forks, NY | New York Independent System Operator (NYIS) | 9.0 GWh | Apr 2024 | Dec 2025 | Solar |
| O'Brien 1 | Generate Capital | Hartford, NY | New York Independent System Operator (NYIS) | 769.0 MWh | Apr 2024 | Mar 2025 | Solar |
| O'Brien 2 | Generate Capital | Hartford, NY | New York Independent System Operator (NYIS) | 7.4 GWh | Apr 2024 | Dec 2025 | Solar |
| Altamont Road Solar, LLC | Generate Capital | Voorheesville, NY | New York Independent System Operator (NYIS) | 4.2 GWh | Apr 2024 | Dec 2025 | Solar |
| ASA Gouverneur NY Solar II LLC | ASA Gouverneur NY Solar II LLC | Gouverneur, NY | New York Independent System Operator (NYIS) | 4.4 GWh | Apr 2024 | Dec 2025 | Solar |
| East Point Energy Center | East Point Energy Center, LLC | Sharon Springs, NY | New York Independent System Operator (NYIS) | 102.2 GWh | Apr 2024 | May 2026 | Solar |
| ASA DeKalb NY Solar III LLC | ASA DeKalb NY Solar III LLC | Richville, NY | New York Independent System Operator (NYIS) | 4.4 GWh | Mar 2024 | Dec 2025 | Solar |
| Hecate Energy Albany 2 LLC | Greenbacker Renewable Energy Corporation | Coeymans, NY | New York Independent System Operator (NYIS) | 30.3 GWh | Mar 2024 | Dec 2025 | Solar |
| FFP - NY Urbanski | FFP NY Goshen Project1, LLC | Goshen, NY | New York Independent System Operator (NYIS) | 4.1 GWh | Mar 2024 | Dec 2025 | Solar |
| FFP - NY Varano | FFP NY Goshen Project2, LLC | Goshen, NY | New York Independent System Operator (NYIS) | 4.2 GWh | Mar 2024 | Dec 2025 | Solar |
| Barone | Generate Capital | Wurtsboro, NY | New York Independent System Operator (NYIS) | 5.6 GWh | Mar 2024 | Dec 2025 | Solar |
| Pivot Solar NY 3 | Pivot Energy | Delevan, NY | New York Independent System Operator (NYIS) | 4.0 GWh | Mar 2024 | Dec 2025 | Solar |
| Pivot Solar NY 6 | Pivot Energy | Ticonderoga, NY | New York Independent System Operator (NYIS) | 8.4 GWh | Mar 2024 | Dec 2025 | Solar |
| NY Grand Island 871 Whitehaven Rd Solar | Grand Island Sunrise LLC | Grand Island, NY | New York Independent System Operator (NYIS) | 7.0 GWh | Feb 2024 | Dec 2025 | Solar |
| Eden Dowmont Road | Dowmont Solar, LLC | Argyle, NY | New York Independent System Operator (NYIS) | 8.6 GWh | Feb 2024 | Dec 2025 | Solar |
| Eden Hidden Meadows | Hidden Meadows Solar, LLC | Fort Meadow, NY | New York Independent System Operator (NYIS) | 7.8 GWh | Feb 2024 | Dec 2025 | Solar |
| Mantisi | Mantisi Solar LLC | Brockport, NY | New York Independent System Operator (NYIS) | 9.4 GWh | Feb 2024 | Dec 2025 | Solar |
| Pivot Solar NY 1 | Pivot Energy | Ticonderoga, NY | New York Independent System Operator (NYIS) | 9.2 GWh | Feb 2024 | Dec 2025 | Solar |
| Pivot Solar NY 9 | Pivot Energy | Ticonderoga, NY | New York Independent System Operator (NYIS) | 7.9 GWh | Feb 2024 | Dec 2025 | Solar |
| Burns Road Solar | Pivot Energy | Angola, NY | New York Independent System Operator (NYIS) | 4.5 GWh | Feb 2024 | Dec 2025 | Solar |
| Winema Solar Partners | Winema Solar Partners, LLC | Oneida, NY | New York Independent System Operator (NYIS) | 8.7 GWh | Feb 2024 | Dec 2025 | Solar |
| NY Geneseo 3240 W Lake Rd Solar | NYSolar03 LLC | Geneseo, NY | New York Independent System Operator (NYIS) | 6.0 GWh | Jan 2024 | Dec 2025 | Solar |
| NY Lancaster Gunnville Rd Site 1 Solar C | AC Power 14, LLC | Lancaster, NY | New York Independent System Operator (NYIS) | 5.5 GWh | Jan 2024 | Oct 2025 | Solar |
| NY Lancaster Shisler Rd Site 2 Solar CSG | AC Power 14, LLC | Lancaster, NY | New York Independent System Operator (NYIS) | 5.8 GWh | Jan 2024 | Dec 2025 | Solar |
| FFP - NY Werner CSG | Distributed Solar Development, LLC | Rush, NY | New York Independent System Operator (NYIS) | 4.1 GWh | Jan 2024 | Dec 2025 | Solar |
| DG Moorman Creek | DG Moorman Creek, LLC | Hilton, NY | New York Independent System Operator (NYIS) | 6.5 GWh | Jan 2024 | Dec 2025 | Solar |
| Wolf | Wolf Solar LLC | Brockport, NY | New York Independent System Operator (NYIS) | 6.7 GWh | Jan 2024 | Dec 2025 | Solar |
| Harris (NY) | Bullrock-NxtGenREA | Liberty, NY | New York Independent System Operator (NYIS) | 2.9 GWh | Jan 2024 | Dec 2025 | Solar |
| Summit - Cicero | MN8 Energy LLC | Brewerton, NY | New York Independent System Operator (NYIS) | 8.4 GWh | Jan 2024 | Dec 2025 | Solar |
| Source Power NY III - Medina II (CSG) | TJA-NY-11202 Ridge Rd Medina, LLC | Medina, NY | New York Independent System Operator (NYIS) | 4.0 GWh | Jan 2024 | Dec 2025 | Solar |
| Hecate Energy Albany County 1 | Greenbacker Renewable Energy Corporation | Coeymans, NY | New York Independent System Operator (NYIS) | 27.5 GWh | Jan 2024 | Dec 2025 | Solar |
| Slayton Settlement Road Solar CSG | RPNY Solar 3, LLC | Lockport, NY | New York Independent System Operator (NYIS) | 11.3 GWh | Jan 2024 | Dec 2025 | Solar |
| NY8 - Teichos Pattersonville | MN8 Energy LLC | Pattersonville, NY | New York Independent System Operator (NYIS) | 37.5 GWh | Jan 2024 | Dec 2025 | Solar |
| Day Hollow Road Community Solar | Bullrock-NxtGenREA | Owego, NY | New York Independent System Operator (NYIS) | 8.2 GWh | Dec 2023 | Dec 2025 | Solar |
| NY Potsdam 28 Hamilton St. Solar | Potsdam Community Solar 2, LLC | Potsdam, NY | New York Independent System Operator (NYIS) | 5.5 GWh | Dec 2023 | Dec 2025 | Solar |
| Spencer (NY) | Generate Capital | Candor, NY | New York Independent System Operator (NYIS) | 9.1 GWh | Dec 2023 | Dec 2025 | Solar |
| Day Hollow | Bullrock-NxtGenREA | Owego, NY | New York Independent System Operator (NYIS) | 8.2 GWh | Dec 2023 | Dec 2025 | Solar |
| Brodhead Solar, LLC | Generate Capital | Moderna, NY | New York Independent System Operator (NYIS) | 3.8 GWh | Dec 2023 | Dec 2025 | Solar |
| Glenville Solar (CSG) | NY USLE Glenville Freemans Bridge LLC | Glenville, NY | New York Independent System Operator (NYIS) | 7.1 GWh | Nov 2023 | Dec 2025 | Solar |
Browse Power Plants By New York Counties
Figures are based on December 2025 generation numbers.| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| Jefferson County, NY | # 29 | 38 | 404.0 GWh |
| Franklin County, NY | # 28 | 17 | 424.5 GWh |
| Westchester County, NY | # 27 | 32 | 439.7 GWh |
| Bronx County, NY | # 26 | 15 | 456.6 GWh |
| Monroe County, NY | # 25 | 42 | 587.3 GWh |
| Onondaga County, NY | # 24 | 46 | 620.8 GWh |
| Yates County, NY | # 23 | 6 | 663.1 GWh |
| Chautauqua County, NY | # 22 | 36 | 883.2 GWh |
| Wyoming County, NY | # 21 | 15 | 1.1 TWh |
| Steuben County, NY | # 20 | 22 | 1.1 TWh |
| Clinton County, NY | # 19 | 26 | 1.6 TWh |
| Lewis County, NY | # 18 | 28 | 1.6 TWh |
| Saratoga County, NY | # 17 | 43 | 1.7 TWh |
| Richmond County, NY | # 16 | 19 | 1.9 TWh |
| Rockland County, NY | # 15 | 10 | 2.1 TWh |
| Nassau County, NY | # 14 | 24 | 2.4 TWh |
| Kings County, NY | # 13 | 31 | 2.5 TWh |
| New York County, NY | # 12 | 19 | 2.5 TWh |
| Greene County, NY | # 11 | 14 | 2.7 TWh |
| Rensselaer County, NY | # 10 | 23 | 3.3 TWh |
| Albany County, NY | # 9 | 33 | 4.1 TWh |
| Wayne County, NY | # 8 | 13 | 4.7 TWh |
| Orange County, NY | # 7 | 60 | 5.7 TWh |
| Dutchess County, NY | # 6 | 22 | 6.4 TWh |
| St. Lawrence County, NY | # 5 | 69 | 7.8 TWh |
| Suffolk County, NY | # 4 | 69 | 9.4 TWh |
| Queens County, NY | # 3 | 23 | 13.7 TWh |
| Niagara County, NY | # 2 | 26 | 14.9 TWh |
| Oswego County, NY | # 1 | 36 | 30.3 TWh |