Directory of Power Plants in New York
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Martinsburg CSG LLC | Dimension Energy LLC | Lowville, NY | New York Independent System Operator (NYIS) | 39.0 MWh | Nov 2024 | Dec 2024 | Solar |
Wolcott Hill (Camden) (CSG) | Nautilus Solar Solutions | Camden, NY | New York Independent System Operator (NYIS) | 35.0 MWh | Nov 2024 | Dec 2024 | Solar |
Altamont (NY) (CSG) | Nautilus Solar Solutions | Guilderland, NY | New York Independent System Operator (NYIS) | 12.0 MWh | Nov 2024 | Dec 2024 | Solar |
Sheesley (CSG) | Nautilus Solar Solutions | Canton, NY | New York Independent System Operator (NYIS) | 15.0 MWh | Nov 2024 | Dec 2024 | Solar |
Greene Community Solar | Greene Community Solar LLC | Chenango Forks, NY | New York Independent System Operator (NYIS) | 12.0 MWh | Nov 2024 | Dec 2024 | Solar |
Swaggertown Solar I | Green Street Power Partners | Glenville, NY | ISO New England (ISNE) | 122.0 MWh | Oct 2024 | Dec 2024 | Solar |
Morris Ridge Solar | Morris Ridge Solar Energy Center, LLC | Mount Morris, NY | New York Independent System Operator (NYIS) | 94.4 GWh | Oct 2024 | Apr 2025 | Solar |
Enfield Solar Site 1 | NSF Enfield Site 1, LLC | Enfield, NY | New York Independent System Operator (NYIS) | 309.0 MWh | Oct 2024 | Dec 2024 | Solar |
Enfield Solar Site 3 | NSF Enfield Site 3, LLC | Enfield, NY | New York Independent System Operator (NYIS) | 287.0 MWh | Oct 2024 | Dec 2024 | Solar |
Enfield Solar Site 2 | NSF Enfield Site 2, LLC | Enfield, NY | New York Independent System Operator (NYIS) | 90.0 MWh | Oct 2024 | Dec 2024 | Solar |
Ticon Solar | Ticon Solar, LLC | Ticonderoga, NY | New York Independent System Operator (NYIS) | 198.0 MWh | Oct 2024 | Dec 2024 | Solar |
Ruhlmann A (CSG) | AETS OpCo Holdings LLC | Lockport, NY | New York Independent System Operator (NYIS) | 371.0 MWh | Oct 2024 | Dec 2024 | Solar |
Independence Road (CSG) | AETS OpCo Holdings LLC | Independence, NY | New York Independent System Operator (NYIS) | 26.0 MWh | Oct 2024 | Dec 2024 | Solar |
Princetown Solar 1 | AES Clean Energy | Duanesburg, NY | New York Independent System Operator (NYIS) | 221.0 MWh | Oct 2024 | Dec 2024 | Solar |
North Troy | Onyx Asset Services Group | Troy, NY | New York Independent System Operator (NYIS) | 507.0 MWh | Sep 2024 | Dec 2024 | Solar |
CAMILLUS A (CSG) | AETS OpCo Holdings LLC | Camillus, NY | New York Independent System Operator (NYIS) | 1.1 GWh | Sep 2024 | Dec 2024 | Solar |
CAMILLUS B (CSG) | AETS OpCo Holdings LLC | Camillus, NY | New York Independent System Operator (NYIS) | 1.0 GWh | Sep 2024 | Dec 2024 | Solar |
Niagara Solar Project | DG Niagara, LLC | Randomville, NY | New York Independent System Operator (NYIS) | 701.0 MWh | Sep 2024 | Dec 2024 | Solar |
Claverack Creek Solar | Claverack Creek Solar, LLC | Hudson, NY | New York Independent System Operator (NYIS) | 895.0 MWh | Sep 2024 | Dec 2024 | Solar |
Swaggertown Solar II | Green Street Power Partners | Glenville, NY | ISO New England (ISNE) | 1.3 GWh | Aug 2024 | Dec 2024 | Solar |
CES Heuvelton | Heuvelton Solar, LLC | Ogdensburg, NY | New York Independent System Operator (NYIS) | 1.9 GWh | Aug 2024 | Dec 2024 | Solar |
Northline Solar CSG | AES Clean Energy | Schaghticoke, NY | New York Independent System Operator (NYIS) | 936.0 MWh | Aug 2024 | Dec 2024 | Solar |
Comfort CSG | Nautilus Solar Solutions | Grand Island, NY | New York Independent System Operator (NYIS) | 1.6 GWh | Aug 2024 | Dec 2024 | Solar |
Bodhi Solar | Bodhi Solar, LLC | Wheatfield, NY | New York Independent System Operator (NYIS) | 2.1 GWh | Jul 2024 | Dec 2024 | Solar |
Krumkill Road Solar South, LLC | Generate Capital | Guilderland, NY | New York Independent System Operator (NYIS) | 2.8 GWh | Jul 2024 | Dec 2024 | Solar |
Krumkill Road Solar North, LLC | Generate Capital | Guilderland, NY | New York Independent System Operator (NYIS) | 2.6 GWh | Jul 2024 | Dec 2024 | Solar |
NY SHERMAN 176 W MAIN ST - SL 1 | SL Sherman, LLC | Sherman, NY | New York Independent System Operator (NYIS) | 1.5 GWh | Jul 2024 | Dec 2024 | Solar |
NY Hermon 1040 County Rd 21 | Solitude Solar Russell County Rd 21 Microgrid, LLC | Hermon, NY | New York Independent System Operator (NYIS) | 589.0 MWh | Jul 2024 | Dec 2024 | Solar |
High River Energy Center, LLC | High River Energy Center, LLC | Florida, NY | New York Independent System Operator (NYIS) | 112.0 GWh | Jul 2024 | Apr 2025 | Solar |
Randall Road Solar II | Green Street Power Partners | Ballston Spa, NY | ISO New England (ISNE) | 1.2 GWh | Jun 2024 | Dec 2024 | Solar |
Randall Road Solar I | Green Street Power Partners | Ballston Spa, NY | ISO New England (ISNE) | 2.0 GWh | Jun 2024 | Dec 2024 | Solar |
Independence East | AETS OpCo Holdings LLC | Independence, NY | New York Independent System Operator (NYIS) | 238.0 MWh | Jun 2024 | Dec 2024 | Solar |
Alexander Road Solar | RPNY Solar 7, LLC | Batavia, NY | ISO New England (ISNE) | 943.0 MWh | Jun 2024 | Dec 2024 | Solar |
Pike Road Solar (NY) | RPNY Solar 6, LLC | Batavia, NY | ISO New England (ISNE) | 1.5 GWh | Jun 2024 | Dec 2024 | Solar |
Clemons Road Solar | RPNY Solar 4, LLC | Minoa, NY | ISO New England (ISNE) | 1.0 GWh | Jun 2024 | Dec 2024 | Solar |
ASA Clayton NY Solar I LLC | ASA Clayton NY Solar I LLC | Clayton, NY | New York Independent System Operator (NYIS) | 738.0 MWh | Jun 2024 | Dec 2024 | Solar |
NY Avon I CSG | DG Empire Sun, LLC | Avon, NY | New York Independent System Operator (NYIS) | 5.5 GWh | Jun 2024 | Dec 2024 | Solar |
South Fork Wind | Orsted Wind Power North America LLC | East Hampton, NY | New York Independent System Operator (NYIS) | 443.9 GWh | Jun 2024 | Apr 2025 | Wind |
NSF Aurelius Site 4 LLC | NSF Energy One LLC | Auburn, NY | New York Independent System Operator (NYIS) | 5.2 GWh | May 2024 | Dec 2024 | Solar |
NSF Aurelius Site 2, LLC | NSF Energy One LLC | Auburn, NY | New York Independent System Operator (NYIS) | 4.0 GWh | May 2024 | Dec 2024 | Solar |
NSF Aurelius Site 1 LLC | NSF Energy One LLC | Auburn, NY | New York Independent System Operator (NYIS) | 4.5 GWh | May 2024 | Dec 2024 | Solar |
Ny Frankfort Bleecker St - Frankfort -NG | Frankfort Solar Farm LLC | Frankfort, NY | New York Independent System Operator (NYIS) | 2.3 GWh | May 2024 | Dec 2024 | Solar |
Peterboro (CSG) | Nautilus Solar Solutions | Vernon, NY | New York Independent System Operator (NYIS) | 2.7 GWh | May 2024 | Dec 2024 | Solar |
County Route 11B | Generate Capital | Mooers Forks, NY | New York Independent System Operator (NYIS) | 3.7 GWh | Apr 2024 | Dec 2024 | Solar |
ASA Gouverneur NY Solar II LLC | ASA Gouverneur NY Solar II LLC | Gouverneur, NY | New York Independent System Operator (NYIS) | 2.8 GWh | Apr 2024 | Dec 2024 | Solar |
NY Sorrell Hill II CSG | DG Empire Lumen 2023, LLC | Baldwinsville, NY | New York Independent System Operator (NYIS) | 481.0 MWh | Apr 2024 | Dec 2024 | Solar |
East Point Energy Center | East Point Energy Center, LLC | Sharon Springs, NY | New York Independent System Operator (NYIS) | 83.7 GWh | Apr 2024 | Apr 2025 | Solar |
Barone | Generate Capital | Wurtsboro, NY | New York Independent System Operator (NYIS) | 4.0 GWh | Mar 2024 | Dec 2024 | Solar |
Hecate Energy Albany 2 LLC | Greenbacker Renewable Energy Corporation | Coeymans, NY | New York Independent System Operator (NYIS) | 24.7 GWh | Mar 2024 | Dec 2024 | Solar |
FFP - NY Varano | FFP NY Goshen Project2, LLC | Goshen, NY | New York Independent System Operator (NYIS) | 6.3 GWh | Mar 2024 | Dec 2024 | Solar |
FFP - NY Urbanski | FFP NY Goshen Project1, LLC | Goshen, NY | New York Independent System Operator (NYIS) | 4.7 GWh | Mar 2024 | Dec 2024 | Solar : 99.9% |
Eden Hidden Meadows | Hidden Meadows Solar, LLC | Fort Meadow, NY | New York Independent System Operator (NYIS) | 6.0 GWh | Feb 2024 | Dec 2024 | Solar |
Eden Dowmont Road | Dowmont Solar, LLC | Argyle, NY | New York Independent System Operator (NYIS) | 6.3 GWh | Feb 2024 | Dec 2024 | Solar |
NY Grand Island 871 Whitehaven Rd Solar | Grand Island Sunrise LLC | Grand Island, NY | New York Independent System Operator (NYIS) | 6.5 GWh | Feb 2024 | Dec 2024 | Solar |
Slayton Settlement Road Solar CSG | RPNY Solar 3, LLC | Lockport, NY | New York Independent System Operator (NYIS) | 8.8 GWh | Jan 2024 | Dec 2024 | Solar |
Summit - Cicero | MN8 Energy LLC | Brewerton, NY | New York Independent System Operator (NYIS) | 6.9 GWh | Jan 2024 | Dec 2024 | Solar |
Source Power NY III - Medina II (CSG) | TJA-NY-11202 Ridge Rd Medina, LLC | Medina, NY | New York Independent System Operator (NYIS) | 6.9 GWh | Jan 2024 | Dec 2024 | Solar |
NY Geneseo 3240 W Lake Rd Solar | NYSolar03 LLC | Geneseo, NY | New York Independent System Operator (NYIS) | 5.7 GWh | Jan 2024 | Dec 2024 | Solar |
NY Lancaster Gunnville Rd Site 1 Solar C | AC Power 14, LLC | Lancaster, NY | New York Independent System Operator (NYIS) | 6.1 GWh | Jan 2024 | Dec 2024 | Solar |
NY Lancaster Shisler Rd Site 2 Solar CSG | AC Power 14, LLC | Lancaster, NY | New York Independent System Operator (NYIS) | 6.1 GWh | Jan 2024 | Dec 2024 | Solar |
DG Moorman Creek | DG Moorman Creek, LLC | Hilton, NY | New York Independent System Operator (NYIS) | 4.3 GWh | Jan 2024 | Dec 2024 | Solar |
FFP - NY Werner CSG | Distributed Solar Development, LLC | Rush, NY | New York Independent System Operator (NYIS) | 438.0 MWh | Jan 2024 | Sep 2024 | Solar |
NY8 - Teichos Pattersonville | MN8 Energy LLC | Pattersonville, NY | New York Independent System Operator (NYIS) | 33.7 GWh | Jan 2024 | Dec 2024 | Solar |
Spencer (NY) | Generate Capital | Candor, NY | New York Independent System Operator (NYIS) | 7.0 GWh | Dec 2023 | Dec 2024 | Solar |
NY Potsdam 28 Hamilton St. Solar | Potsdam Community Solar 2, LLC | Potsdam, NY | New York Independent System Operator (NYIS) | 7.2 GWh | Dec 2023 | Dec 2024 | Solar |
Ridgeway 2 | Generate Capital | Rochester, NY | New York Independent System Operator (NYIS) | 4.5 GWh | Nov 2023 | Dec 2024 | Solar |
Rivard 1 | Generate Capital | Sheridan, NY | New York Independent System Operator (NYIS) | 6.3 GWh | Nov 2023 | Dec 2024 | Solar |
Manilus | Solar Planet Power | Manilus, NY | New York Independent System Operator (NYIS) | 6.3 GWh | Nov 2023 | Dec 2024 | Solar |
Guilderland Solar | Helios Energy New York 13 LLC | Altamont, NY | New York Independent System Operator (NYIS) | 2.5 GWh | Nov 2023 | Dec 2024 | Solar |
Rivard 2 | Generate Capital | Sheridan, NY | New York Independent System Operator (NYIS) | 7.2 GWh | Nov 2023 | Dec 2024 | Solar |
ASA DeKalb NY Solar II LLC | ASA DeKalb NY Solar II LLC | DeKalb, NY | New York Independent System Operator (NYIS) | 4.7 GWh | Nov 2023 | Dec 2024 | Solar |
ASA DeKalb NY Solar I LLC | ASA DeKalb NY Solar I LLC | DeKalb, NY | New York Independent System Operator (NYIS) | 6.5 GWh | Nov 2023 | Dec 2024 | Solar |
NY Lower Road III CSG | Lower Road III, LLC | New Hampton, NY | New York Independent System Operator (NYIS) | 3.7 GWh | Nov 2023 | Dec 2024 | Solar |
NY Lower Road II CSG | Lower Road II, LLC | New Hampton, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Nov 2023 | Dec 2024 | Solar |
Saratoga Solar III, LLC | Green Street Power Partners | Middle Grove, NY | ISO New England (ISNE) | 5.7 GWh | Nov 2023 | Dec 2024 | Solar |
GSPP 126 Little Bow Rd S, LLC | Green Street Power Partners | Gouverneur, NY | ISO New England (ISNE) | 4.2 GWh | Nov 2023 | Dec 2024 | Solar |
GSPP 126 Little Bow Rd N, LLC | Green Street Power Partners | Gouverneur, NY | ISO New England (ISNE) | 3.2 GWh | Nov 2023 | Dec 2024 | Solar |
Source Power NY II - Locust 1 | Locust Solar LLC | Cortland, NY | New York Independent System Operator (NYIS) | 7.6 GWh | Nov 2023 | Dec 2024 | Solar |
Source Power NY III - Remsen | Distributed Solar Development, LLC | Remsen, NY | New York Independent System Operator (NYIS) | 5.0 GWh | Nov 2023 | Dec 2024 | Solar |
Broadway CDG Solar LLC | Broadway CDG Solar LLC | Depew, NY | New York Independent System Operator (NYIS) | 7.2 GWh | Nov 2023 | Dec 2024 | Solar |
Ball Hill Wind Energy, LLC | Ball Hill Wind Energy, LLC | Forestville, NY | New York Independent System Operator (NYIS) | 281.3 GWh | Nov 2023 | Apr 2025 | Wind |
Glenville Solar (CSG) | NY USLE Glenville Freemans Bridge LLC | Glenville, NY | New York Independent System Operator (NYIS) | 17.0 MWh | Nov 2023 | Dec 2023 | Solar |
Ridgeway 1 | Generate Capital | Rochester, NY | New York Independent System Operator (NYIS) | 9.4 GWh | Oct 2023 | Dec 2024 | Solar |
Janiak | Generate Capital | Port Jervis, NY | New York Independent System Operator (NYIS) | 3.6 GWh | Oct 2023 | Dec 2024 | Solar |
NSF Torrey Site 1 | NSF Torrey Site 1, LLC | Torrey, NY | New York Independent System Operator (NYIS) | 8.4 GWh | Oct 2023 | Dec 2024 | Solar |
NSF Torrey Site 2 | NSF Torrey Site 2, LLC | Torrey, NY | New York Independent System Operator (NYIS) | 8.4 GWh | Oct 2023 | Dec 2024 | Solar |
NSF Torrey Site 3 | NSF Torrey Site 3, LLC | Torrey, NY | New York Independent System Operator (NYIS) | 8.4 GWh | Oct 2023 | Dec 2024 | Solar |
State Route 5 | AETS OpCo Holdings LLC | Vernon, NY | New York Independent System Operator (NYIS) | 6.6 GWh | Oct 2023 | Dec 2024 | Solar |
NY8 - ELP Stillwater Solar | MN8 Energy LLC | Mechanicville, NY | New York Independent System Operator (NYIS) | 34.1 GWh | Oct 2023 | Dec 2024 | Solar |
Eddy | Generate Capital | Williamson, NY | New York Independent System Operator (NYIS) | 4.0 GWh | Sep 2023 | Dec 2024 | Solar |
Saratoga Solar IV, LLC | Green Street Power Partners | Rock City Falls, NY | ISO New England (ISNE) | 4.2 GWh | Sep 2023 | Dec 2024 | Solar |
Source Power II - Taft CSG | Distributed Solar Development, LLC | East Syracuse, NY | New York Independent System Operator (NYIS) | 5.5 GWh | Sep 2023 | Dec 2024 | Solar |
Bluestone Wind, LLC | Bluestone Wind, LLC | Sanford, NY | New York Independent System Operator (NYIS) | 326.1 GWh | Sep 2023 | Apr 2025 | Wind |
Catskill | Generate Capital | Triangle, NY | New York Independent System Operator (NYIS) | 6.1 GWh | Aug 2023 | Dec 2024 | Solar |
Oswego | NY USLE Oswego SR104 LLC | Oswego, NY | New York Independent System Operator (NYIS) | 457.0 MWh | Aug 2023 | Dec 2023 | Solar |
Summit - Scriba CSG | MN8 Energy LLC | Scriba, NY | New York Independent System Operator (NYIS) | 7.7 GWh | Aug 2023 | Dec 2024 | Solar |
Bullitt Farm Solar | Generate Capital | Marcy, NY | New York Independent System Operator (NYIS) | 7.0 GWh | Aug 2023 | Dec 2024 | Solar |
Source Power NY II - Whaling | Whaling Solar, LLC | Utica, NY | New York Independent System Operator (NYIS) | 824.0 MWh | Aug 2023 | Dec 2023 | Solar |
NY Ridgeway I CSG | DG Empire Shine, LLC | Lyndonville, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Jul 2023 | Dec 2024 | Solar |
RIC - Hanover (CSG) | MN8 Energy LLC | Silver Creek, NY | New York Independent System Operator (NYIS) | 8.7 GWh | Jul 2023 | Dec 2024 | Solar |
Browse Power Plants By New York Counties
Figures are based on December 2024 generation numbers.County | State Rank | Active Plants | Dec 2024 Generation |
---|---|---|---|
Westchester County, NY | # 29 | 31 | 429.1 GWh |
Franklin County, NY | # 28 | 15 | 470.7 GWh |
Onondaga County, NY | # 27 | 36 | 477.1 GWh |
Bronx County, NY | # 26 | 15 | 477.8 GWh |
Jefferson County, NY | # 25 | 38 | 526.4 GWh |
Monroe County, NY | # 24 | 41 | 548.8 GWh |
Yates County, NY | # 23 | 6 | 713.2 GWh |
Chautauqua County, NY | # 22 | 24 | 858.5 GWh |
Wyoming County, NY | # 21 | 15 | 906.6 GWh |
Steuben County, NY | # 20 | 22 | 1.1 TWh |
Clinton County, NY | # 19 | 28 | 1.5 TWh |
Lewis County, NY | # 18 | 28 | 1.8 TWh |
Rockland County, NY | # 17 | 10 | 2.0 TWh |
Richmond County, NY | # 16 | 19 | 2.0 TWh |
Saratoga County, NY | # 15 | 37 | 2.0 TWh |
Kings County, NY | # 14 | 31 | 2.3 TWh |
Nassau County, NY | # 13 | 24 | 2.7 TWh |
New York County, NY | # 12 | 18 | 3.0 TWh |
Rensselaer County, NY | # 11 | 22 | 3.0 TWh |
Dutchess County, NY | # 10 | 21 | 3.9 TWh |
Albany County, NY | # 9 | 30 | 4.0 TWh |
Greene County, NY | # 8 | 13 | 4.1 TWh |
Wayne County, NY | # 7 | 11 | 4.8 TWh |
Orange County, NY | # 6 | 53 | 5.6 TWh |
Suffolk County, NY | # 5 | 67 | 8.2 TWh |
St. Lawrence County, NY | # 4 | 68 | 8.3 TWh |
Queens County, NY | # 3 | 22 | 15.1 TWh |
Niagara County, NY | # 2 | 25 | 15.3 TWh |
Oswego County, NY | # 1 | 33 | 29.2 TWh |