Directory of Power Plants in New York
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Holtsville Coast Solar Project | Coast Energy Holdings, LLC | Holtsville, NY | New York Independent System Operator (NYIS) | 17.0 MWh | Nov 2025 | Dec 2025 | Solar |
| Magruder Solar Community Solar | Magruder Solar, LLC | Shawangunk, NY | New York Independent System Operator (NYIS) | 335.0 MWh | Nov 2025 | Dec 2025 | Solar |
| Brookhaven Landfill Solar Farm 1 | Brookhaven 1 | Brookhaven, NY | New York Independent System Operator (NYIS) | 1.2 GWh | Oct 2025 | Dec 2025 | Solar |
| 3715 Oxford RD | Solitude Solar New Hartford Oxford Microgrid, LLC | Oxford, NY | New York Independent System Operator (NYIS) | 268.0 MWh | Oct 2025 | Dec 2025 | Solar |
| NSF Marshall Site 3 | NSF Marshall Site 3, LLC | Marshall, NY | New York Independent System Operator (NYIS) | 191.0 MWh | Oct 2025 | Dec 2025 | Solar |
| NY Country Road 67 and Majorana | NY Country Road 67 and Majorana | Poughkeepsie, NY | New York Independent System Operator (NYIS) | 184.0 MWh | Oct 2025 | Dec 2025 | Solar |
| NSF Marshall Site 2 | NSF Marshall Site 2, LLC | Marshall, NY | New York Independent System Operator (NYIS) | 320.0 MWh | Oct 2025 | Dec 2025 | Solar |
| NSF Marshall Site 1 | NSF Marshall Site 1, LLC | Marshall, NY | New York Independent System Operator (NYIS) | 237.0 MWh | Oct 2025 | Dec 2025 | Solar |
| SL JAMESTOWN ARRAY 1 | SL Jamestown, LLC | Jamestown, NY | New York Independent System Operator (NYIS) | 337.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Johnson City Solar | Above Grid Binghamton Solar LLC | Johnson City, NY | New York Independent System Operator (NYIS) | 196.0 MWh | Sep 2025 | Dec 2025 | Solar |
| SL JAMESTOWN ARRAY 2 | SL Jamestown II, LLC | Jamestown, NY | New York Independent System Operator (NYIS) | 234.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Stockbridge | Greenbacker Renewable Energy Corporation | Munnsville, NY | New York Independent System Operator (NYIS) | 892.0 MWh | Sep 2025 | Dec 2025 | Solar |
| NY 5 King LLC | NY 5 King LLC | Wilton, NY | New York Independent System Operator (NYIS) | 5.0 GWh | Sep 2025 | Dec 2025 | Solar |
| NY 24 Sherman LLC | NY 24 Sherman LLC | Gavensvoort, NY | New York Independent System Operator (NYIS) | 4.6 GWh | Sep 2025 | Dec 2025 | Solar |
| NY Beaver Dams Dix 1239 Duvall Rd Solar | Solitude Solar Dix Duvall Rd Microgrid, LLC | Beaver Dams, NY | New York Independent System Operator (NYIS) | 98.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Green Haven | Generate Capital | Stormville, NY | New York Independent System Operator (NYIS) | 702.0 MWh | Aug 2025 | Dec 2025 | Solar |
| NSF Edmeston Site 2 | NSF Energy Three LLC | South Edmeston, NY | New York Independent System Operator (NYIS) | 1.6 GWh | Aug 2025 | Dec 2025 | Solar |
| NSF Edmeston Site 1 | NSF Energy Three LLC | South Edmeston, NY | New York Independent System Operator (NYIS) | 1.7 GWh | Aug 2025 | Dec 2025 | Solar |
| Oneida East | Azimuth 180 Solar Electric, LLC | Holland Patent, NY | New York Independent System Operator (NYIS) | 891.0 MWh | Aug 2025 | Dec 2025 | Solar |
| Geer Road Solar 2 CSG | AES Clean Energy | Hudson Falls, NY | New York Independent System Operator (NYIS) | 740.0 MWh | Aug 2025 | Dec 2025 | Solar |
| Moores Hill | LSE Sculptor, LLC | New Windsor, NY | New York Independent System Operator (NYIS) | 1.5 GWh | Jul 2025 | Dec 2025 | Solar |
| Independence North | Generate Capital | Whitesville, NY | New York Independent System Operator (NYIS) | 1.8 GWh | Jul 2025 | Dec 2025 | Solar |
| Afton Solar | Afton Solar LLC | Afton, NY | New York Independent System Operator (NYIS) | 1.3 GWh | Jul 2025 | Dec 2025 | Solar |
| FFP - NY Game Farm CSG | Distributed Solar Development, LLC | Dexter, NY | New York Independent System Operator (NYIS) | 901.0 MWh | Jul 2025 | Dec 2025 | Solar |
| Geer Road Solar 1 CSG | AES Clean Energy | Hudson Falls, NY | New York Independent System Operator (NYIS) | 1.4 GWh | Jul 2025 | Dec 2025 | Solar |
| NY FONDA 182 BOSHART RD - Montgomery 1 | NY CDG Montgomery 1 LLC | Fonda, NY | New York Independent System Operator (NYIS) | 4.7 GWh | Jun 2025 | Dec 2025 | Solar |
| SP-425 Memphis | Madison Energy Investments LLC | Memphis, NY | New York Independent System Operator (NYIS) | 6.2 GWh | Jun 2025 | Dec 2025 | Solar |
| Hanover II PV (CSG) | Hanover II PV LLC | Forestville, NY | New York Independent System Operator (NYIS) | 3.6 GWh | Jun 2025 | Dec 2025 | Solar |
| NY Attica 264 Maplewood Rd | EF NY CDG 010, LLC | Attica, NY | New York Independent System Operator (NYIS) | 2.8 GWh | Jun 2025 | Dec 2025 | Solar |
| USNY - Geddes | Abundant Solar Power Inc. | Town of Geddes, NY | New York Independent System Operator (NYIS) | 1.4 GWh | Jun 2025 | Nov 2025 | Solar |
| Gowans (CSG) | Nautilus Solar Solutions | Angola, NY | New York Independent System Operator (NYIS) | 2.4 GWh | Jun 2025 | Dec 2025 | Solar |
| North Woods (CSG) | Nautilus Solar Solutions | Canton, NY | New York Independent System Operator (NYIS) | 2.3 GWh | Jun 2025 | Dec 2025 | Solar |
| County Highway Solar 2 (CSG) | AES Clean Energy | Johnstown, NY | New York Independent System Operator (NYIS) | 3.8 GWh | Jun 2025 | Dec 2025 | Solar |
| Ontario 2 CDG | NY CDG Ontario 2, LLC | Phelps, NY | New York Independent System Operator (NYIS) | 4.5 GWh | May 2025 | Dec 2025 | Solar |
| NY Breesport 625 Breesport Rd | Catalyze Breesport Road Microgrid, LLC | Horseheads, NY | New York Independent System Operator (NYIS) | 1.9 GWh | May 2025 | Dec 2025 | Solar |
| Cambridge Solar | Generate Capital | Cambridge, NY | New York Independent System Operator (NYIS) | 3.6 GWh | May 2025 | Dec 2025 | Solar |
| County Highway Solar 1 CSG | AES Clean Energy | Johnstown, NY | New York Independent System Operator (NYIS) | 4.8 GWh | May 2025 | Dec 2025 | Solar |
| AES Baird Solar CSG | AES Clean Energy | Albion, NY | New York Independent System Operator (NYIS) | 5.5 GWh | Apr 2025 | Dec 2025 | Solar |
| Kosa | Greenbacker Renewable Energy Corporation | Independence, NY | New York Independent System Operator (NYIS) | 1.9 GWh | Apr 2025 | Dec 2025 | Solar |
| Rose Hill Road Solar 1 - Spafford 1 | 38DN Asset Management LLC | Skaneateles, NY | New York Independent System Operator (NYIS) | 6.4 GWh | Apr 2025 | Dec 2025 | Solar |
| NY Evans 7690 SW Blvd - SL Evans Array 2 | SL Evans, LLC | Evans, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Apr 2025 | Dec 2025 | Solar |
| NY Evans 7690 SW Blvd - SL Evans Array 1 | SL Evans, LLC | Evans, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Apr 2025 | Dec 2025 | Solar |
| McCormick NY CSG LLC | McCormick NY CSG LLC | Andover, NY | New York Independent System Operator (NYIS) | 4.0 GWh | Apr 2025 | Dec 2025 | Solar |
| Rose Hill Road Solar 2 - Spafford 2 | 38DN Asset Management LLC | Skaneateles, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Apr 2025 | Dec 2025 | Solar |
| NY Fredonia 9824 Route 60 Solar | SL Fredonia, LLC | Fredonia, NY | New York Independent System Operator (NYIS) | 4.1 GWh | Mar 2025 | Dec 2025 | Solar |
| West Shore Solar LLC | West Shore Solar LLC | West Park, NY | New York Independent System Operator (NYIS) | 2.3 GWh | Mar 2025 | Dec 2025 | Solar |
| Elk Street Solar | Elk Street Solar LLC | Buffalo, NY | New York Independent System Operator (NYIS) | 2.1 GWh | Mar 2025 | Dec 2025 | Solar |
| Old Route 17 | NY Thompson III, LLC | Harris, NY | New York Independent System Operator (NYIS) | 5.0 GWh | Mar 2025 | Dec 2025 | Solar |
| Route 5 & 20 Community Solar Farm | Bullrock-NxtGenREA | E Bloomfield, NY | New York Independent System Operator (NYIS) | 2.1 GWh | Mar 2025 | Dec 2025 | Solar |
| State Route 64N Community Solar Farm | Bullrock-NxtGenREA | East Bloomfield, NY | New York Independent System Operator (NYIS) | 870.0 MWh | Mar 2025 | Dec 2025 | Solar |
| NY CDG 010 | NY CDG 010 LLC | Astoria, NY | New York Independent System Operator (NYIS) | 1.4 GWh | Feb 2025 | Oct 2025 | Solar |
| NY SHERMAN 191 W MAIN ST - SL 2 | SL Sherman II, LLC | Sherman, NY | New York Independent System Operator (NYIS) | 3.5 GWh | Feb 2025 | Dec 2025 | Solar |
| Kendall DG Solar | DG Kendall, LLC | Kendall, NY | New York Independent System Operator (NYIS) | 1.1 GWh | Feb 2025 | Dec 2025 | Solar |
| AES Laubacher Solar CSG | AES Clean Energy | Albion, NY | New York Independent System Operator (NYIS) | 4.1 GWh | Jan 2025 | Dec 2025 | Solar |
| Mahany | Greenbacker Renewable Energy Corporation | Arkport, NY | New York Independent System Operator (NYIS) | 5.5 GWh | Jan 2025 | Dec 2025 | Solar |
| Tubolino CSG | AES Clean Energy | Adams, NY | New York Independent System Operator (NYIS) | 4.2 GWh | Jan 2025 | Dec 2025 | Solar |
| Fork in the Road Solar | Fork in the Road Solar LLC | Milan, NY | New York Independent System Operator (NYIS) | 1.8 GWh | Jan 2025 | Dec 2025 | Solar |
| Albion A | NY USLE Albion Long Bridge A LLC | Albion, NY | New York Independent System Operator (NYIS) | 7.7 GWh | Jan 2025 | Dec 2025 | Solar |
| Chenunda Creek | Generate Capital | Wellsville, NY | New York Independent System Operator (NYIS) | 4.2 GWh | Dec 2024 | Dec 2025 | Solar |
| NSF Chateaugay Site 2 | NSF Chateaugay Site 2 LLC | Chateaugay, NY | New York Independent System Operator (NYIS) | 6.1 GWh | Dec 2024 | Dec 2025 | Solar |
| NSF Chateaugay Site 1 | NSF Chateaugay Site 1 LLC | Chateaugay, NY | New York Independent System Operator (NYIS) | 7.2 GWh | Dec 2024 | Dec 2025 | Solar |
| NY PAVILION 6464 SHEPARD RD - Genesee 4 | NY CDG Genesee 4 LLC | Pavilion, NY | New York Independent System Operator (NYIS) | 6.2 GWh | Dec 2024 | Dec 2025 | Solar |
| Altamont (NY) (CSG) | Nautilus Solar Solutions | Guilderland, NY | New York Independent System Operator (NYIS) | 3.5 GWh | Nov 2024 | Dec 2025 | Solar |
| Meltwater | SunStrong Management, LLC | Manlius, NY | New York Independent System Operator (NYIS) | 7.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Grass River | SunStrong Management, LLC | Canton, NY | New York Independent System Operator (NYIS) | 1.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Buck Run | SunStrong Management, LLC | Clarkson, NY | New York Independent System Operator (NYIS) | 114.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Acer | SunStrong Management, LLC | Madrid, NY | New York Independent System Operator (NYIS) | 68.0 MWh | Nov 2024 | Dec 2024 | Solar |
| TJA-NY- Dix Solar Farm LLC | Dimension Energy LLC | Dix, NY | New York Independent System Operator (NYIS) | 5.8 GWh | Nov 2024 | Dec 2025 | Solar |
| TJA-NY-Chestnut Ridge Rd Moravia, LLC | Dimension Energy LLC | Moravia, NY | New York Independent System Operator (NYIS) | 1.4 GWh | Nov 2024 | Dec 2025 | Solar |
| NY ALTONA MAYOTT - Environomics P2 | Catalyze Pombrio Solar Farm 2 Microgrid, LLC | Altona, NY | New York Independent System Operator (NYIS) | 6.4 GWh | Nov 2024 | Dec 2025 | Solar |
| NY ALTONA MAYOTT - Environomics P1 | Catalyze Pombrio Solar Farm 1 Microgrid, LLC | Altona, NY | New York Independent System Operator (NYIS) | 6.3 GWh | Nov 2024 | Dec 2025 | Solar |
| NY Newark ST RT 31 - Environomics S2 | Catalyze Newark Solar Farm 2 Microgrid, LLC | Newark, NY | New York Independent System Operator (NYIS) | 5.8 GWh | Nov 2024 | Dec 2025 | Solar |
| TJA-NY-1454 CR 15 Oswegatchie, LLC | Dimension Energy LLC | Oswegatchie, NY | New York Independent System Operator (NYIS) | 7.3 GWh | Nov 2024 | Dec 2025 | Solar |
| NY Newark St Rt 31 - Environomics S1 | Catalyze Newark Solar Farm 1 Microgrid, LLC | Newark, NY | New York Independent System Operator (NYIS) | 7.6 GWh | Nov 2024 | Dec 2025 | Solar |
| TJA-NY-Cohocton Solar Farm, LLC | Dimension Energy LLC | Cohocton, NY | New York Independent System Operator (NYIS) | 6.5 GWh | Nov 2024 | Nov 2025 | Solar |
| TJA-NY-Canton Solar Farm LLC | Dimension Energy LLC | Canton, NY | New York Independent System Operator (NYIS) | 6.9 GWh | Nov 2024 | Dec 2025 | Solar |
| TJA-NY-Barrett Rd New Woodstock, LLC | Dimension Energy LLC | New Woodstock, NY | New York Independent System Operator (NYIS) | 6.5 GWh | Nov 2024 | Dec 2025 | Solar |
| NY Finchville Tpke CSG | Finchville Tpke LLC | Otisville, NY | New York Independent System Operator (NYIS) | 2.7 GWh | Nov 2024 | Dec 2025 | Solar |
| Caledonia CSG LLC | Dimension Energy LLC | Caledonia, NY | New York Independent System Operator (NYIS) | 5.6 GWh | Nov 2024 | Dec 2025 | Solar |
| Martinsburg CSG LLC | Dimension Energy LLC | Lowville, NY | New York Independent System Operator (NYIS) | 3.9 GWh | Nov 2024 | Dec 2025 | Solar |
| Richland North | AETS OpCo Holdings LLC | Richland, NY | New York Independent System Operator (NYIS) | 5.8 GWh | Nov 2024 | Dec 2025 | Solar |
| Richland South | AETS OpCo Holdings LLC | Richland, NY | New York Independent System Operator (NYIS) | 3.9 GWh | Nov 2024 | Dec 2025 | Solar |
| Ellisburg | AETS OpCo Holdings LLC | Adams, NY | New York Independent System Operator (NYIS) | 6.3 GWh | Nov 2024 | Dec 2025 | Solar |
| Wolcott Hill (Camden) (CSG) | Nautilus Solar Solutions | Camden, NY | New York Independent System Operator (NYIS) | 6.4 GWh | Nov 2024 | Dec 2025 | Solar |
| Greene Community Solar | Greene Community Solar LLC | Chenango Forks, NY | New York Independent System Operator (NYIS) | 5.3 GWh | Nov 2024 | Dec 2025 | Solar |
| GSPP 409 Ferris Road | Green Street Power Partners | Lawrence, NY | ISO New England (ISNE) | 7.7 GWh | Nov 2024 | Dec 2025 | Solar |
| Ver Plank South (CSG) | Nautilus Solar Solutions | Clay, NY | New York Independent System Operator (NYIS) | 8.3 GWh | Nov 2024 | Dec 2025 | Solar |
| GSPP 641 Ferris Road West | Green Street Power Partners | Lawrence, NY | ISO New England (ISNE) | 4.0 GWh | Nov 2024 | Dec 2025 | Solar |
| Arcadia | Bullrock-NxtGenREA | Newark, NY | New York Independent System Operator (NYIS) | 5.2 GWh | Nov 2024 | Dec 2025 | Solar |
| ESNY-Yorktown | ESNY-Yorktown, LLC | Yorktown, NY | New York Independent System Operator (NYIS) | 6.0 GWh | Nov 2024 | Dec 2025 | Solar |
| Ver Plank North (CSG) | Nautilus Solar Solutions | Clay, NY | New York Independent System Operator (NYIS) | 5.0 GWh | Nov 2024 | Dec 2025 | Solar |
| Ransom | Generate Capital | Binghamton, NY | New York Independent System Operator (NYIS) | 7.8 GWh | Nov 2024 | Dec 2025 | Solar |
| Shoddy Hollow | Generate Capital | Otisville, NY | New York Independent System Operator (NYIS) | 8.7 GWh | Nov 2024 | Dec 2025 | Solar |
| Pivot Solar NY 5 | Pivot Energy | Ticonderoga, NY | New York Independent System Operator (NYIS) | 3.6 GWh | Nov 2024 | Dec 2025 | Solar |
| Wedge NY | Generate Capital | Horseheads, NY | New York Independent System Operator (NYIS) | 5.0 GWh | Nov 2024 | Dec 2025 | Solar |
| Mannys Corners Solar 1 (CSG) | AES Clean Energy | Town of Amsterdam, NY | New York Independent System Operator (NYIS) | 7.8 GWh | Nov 2024 | Dec 2025 | Solar |
| NSF Danby Site 3, LLC | NSF Energy Two, LLC | Ithaca, NY | New York Independent System Operator (NYIS) | 4.8 GWh | Nov 2024 | Dec 2025 | Solar |
| NSF Danby Site 2, LLC | NSF Energy Two, LLC | Ithaca, NY | New York Independent System Operator (NYIS) | 5.1 GWh | Nov 2024 | Dec 2025 | Solar |
| Quaker | CVE US EI8 Quaker LLC | Queensbury, NY | New York Independent System Operator (NYIS) | 8.4 GWh | Nov 2024 | Dec 2025 | Solar |
| NSF Danby Site 1, LLC | NSF Energy Two, LLC | Ithaca, NY | New York Independent System Operator (NYIS) | 6.1 GWh | Nov 2024 | Dec 2025 | Solar |
Browse Power Plants By New York Counties
Figures are based on December 2025 generation numbers.| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| Jefferson County, NY | # 29 | 38 | 404.0 GWh |
| Franklin County, NY | # 28 | 17 | 424.5 GWh |
| Westchester County, NY | # 27 | 32 | 439.7 GWh |
| Bronx County, NY | # 26 | 15 | 456.6 GWh |
| Monroe County, NY | # 25 | 42 | 587.3 GWh |
| Onondaga County, NY | # 24 | 46 | 620.8 GWh |
| Yates County, NY | # 23 | 6 | 663.1 GWh |
| Chautauqua County, NY | # 22 | 36 | 883.2 GWh |
| Wyoming County, NY | # 21 | 15 | 1.1 TWh |
| Steuben County, NY | # 20 | 22 | 1.1 TWh |
| Clinton County, NY | # 19 | 26 | 1.6 TWh |
| Lewis County, NY | # 18 | 28 | 1.6 TWh |
| Saratoga County, NY | # 17 | 43 | 1.7 TWh |
| Richmond County, NY | # 16 | 19 | 1.9 TWh |
| Rockland County, NY | # 15 | 10 | 2.1 TWh |
| Nassau County, NY | # 14 | 24 | 2.4 TWh |
| Kings County, NY | # 13 | 31 | 2.5 TWh |
| New York County, NY | # 12 | 19 | 2.5 TWh |
| Greene County, NY | # 11 | 14 | 2.7 TWh |
| Rensselaer County, NY | # 10 | 23 | 3.3 TWh |
| Albany County, NY | # 9 | 33 | 4.1 TWh |
| Wayne County, NY | # 8 | 13 | 4.7 TWh |
| Orange County, NY | # 7 | 60 | 5.7 TWh |
| Dutchess County, NY | # 6 | 22 | 6.4 TWh |
| St. Lawrence County, NY | # 5 | 69 | 7.8 TWh |
| Suffolk County, NY | # 4 | 69 | 9.4 TWh |
| Queens County, NY | # 3 | 23 | 13.7 TWh |
| Niagara County, NY | # 2 | 26 | 14.9 TWh |
| Oswego County, NY | # 1 | 36 | 30.3 TWh |