Directory of Power Plants in New York
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Crescent | New York Power Authority | Crescent, NY | New York Independent System Operator (NYIS) | 50.1 GWh | Jun 1924 | Dec 2025 | Water |
| Svenski Solar (Hybrid) | Generate Capital | Crawford, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Mar 2022 | Dec 2025 | Solar |
| DOCCS Greene | Green Correctional Coxsackie NY Solar LLC | Coxsackie, NY | New York Independent System Operator (NYIS) | 7.8 GWh | Sep 2022 | Dec 2025 | Solar |
| Coxsackie | Central Hudson Gas & Elec Corp | Coxsackie, NY | New York Independent System Operator (NYIS) | 1.1 GWh | Nov 1969 | Dec 2025 | Natural Gas : 77.6% Kerosene : 22.4% |
| Coxsackie Solar | FPS Coxsackie Solar LLC | Coxsackie, NY | New York Independent System Operator (NYIS) | 8.3 GWh | Sep 2022 | Dec 2025 | Solar |
| NY - Mines Press | NY - Mines Press | Cortlandt, NY | New York Independent System Operator (NYIS) | 27.0 MWh | Nov 2021 | Dec 2024 | Solar |
| Croton Solar | Croton Solar LLC | Cortlandt, NY | New York Independent System Operator (NYIS) | 5.2 GWh | Nov 2021 | Dec 2025 | Solar |
| NYP-Hudson Valley Hospital Center | NYP-Hudson Valley Hospital Center | Cortlandt Manor, NY | New York Independent System Operator (NYIS) | 34.0 MWh | Dec 2009 | Dec 2025 | Distillate Fuel Oil |
| Cortlandville III Solar CSG | DG Empire Shine, LLC | Cortland, NY | New York Independent System Operator (NYIS) | 7.9 GWh | Dec 2022 | Dec 2025 | Solar |
| Cortlandville I Solar CSG | DG New York CS, LLC | Cortland, NY | New York Independent System Operator (NYIS) | 7.9 GWh | Sep 2021 | Dec 2025 | Solar |
| Source Power NY II - Locust 1 | Locust Solar LLC | Cortland, NY | New York Independent System Operator (NYIS) | 7.7 GWh | Nov 2023 | Dec 2025 | Solar |
| Indeck Corinth Energy Center | Indeck-Corinth Ltd Partnership | Corinth, NY | New York Independent System Operator (NYIS) | 544.4 GWh | Jan 1995 | Dec 2025 | Natural Gas |
| Stewarts Bridge | Erie Boulevard Hydropower LP | Corinth, NY | New York Independent System Operator (NYIS) | 90.4 GWh | Dec 1951 | Dec 2025 | Water |
| Curtis Palmer Hydroelectric | Palmer Hydroelectric | Corinth, NY | New York Independent System Operator (NYIS) | 276.6 GWh | Sep 1985 | Dec 2025 | Water |
| Copenhagen Wind Farm | EDF Renewable Asset Holdings, Inc. | Copenhagen, NY | New York Independent System Operator (NYIS) | 250.2 GWh | Nov 2018 | May 2026 | Wind |
| Kings Falls Hydroelectric | Silverstreet Hydro | Copenhagen, NY | New York Independent System Operator (NYIS) | 2.0 GWh | Sep 1988 | Dec 2024 | Water |
| Copenhagen Plant | Central Rivers Power US, LLC | Copenhagen, NY | New York Independent System Operator (NYIS) | 7.0 GWh | May 1984 | Dec 2025 | Water |
| Copenhagen Solar | NY USLE Copenhagen CR194 LLC | Copenhagen, NY | New York Independent System Operator (NYIS) | 5.1 GWh | Apr 2024 | Dec 2025 | Solar |
| OYA State Route 122 | SunStrong Management, LLC | Constable, NY | New York Independent System Operator (NYIS) | 10.1 GWh | Nov 2021 | Dec 2025 | Solar |
| Broome County | Tesla Inc. | Conklin, NY | New York Independent System Operator (NYIS) | 4.7 GWh | May 2018 | Dec 2025 | Solar |
| Higley | Erie Boulevard Hydropower LP | Colton, NY | New York Independent System Operator (NYIS) | 30.5 GWh | Aug 2003 | Dec 2025 | Water |
| Stark | Erie Boulevard Hydropower LP | Colton, NY | New York Independent System Operator (NYIS) | 78.8 GWh | Dec 1956 | Dec 2025 | Water |
| South Colton | Erie Boulevard Hydropower LP | Colton, NY | New York Independent System Operator (NYIS) | 67.8 GWh | Dec 1953 | Dec 2025 | Water |
| Five Falls | Erie Boulevard Hydropower LP | Colton, NY | New York Independent System Operator (NYIS) | 80.1 GWh | Dec 1954 | Dec 2025 | Water |
| School Street | Erie Boulevard Hydropower LP | Cohoes, NY | New York Independent System Operator (NYIS) | 146.1 GWh | Dec 1914 | Dec 2025 | Water |
| Goldman Sachs Carports Solar | Madison Energy Investments LLC | Cohoes, NY | New York Independent System Operator (NYIS) | 1.2 GWh | Nov 2020 | Dec 2025 | Solar |
| Colonie LFGTE Facility | Innovative Energy Systems Inc | Cohoes, NY | New York Independent System Operator (NYIS) | 39.7 GWh | Jan 2006 | Dec 2025 | Landfill Gas |
| Dutch Hill Wind Project | Evergreen Wind, LLC | Cohocton, NY | New York Independent System Operator (NYIS) | 88.1 GWh | Dec 2008 | Dec 2025 | Wind |
| Cohocton Wind Project | Evergreen Wind, LLC | Cohocton, NY | New York Independent System Operator (NYIS) | 205.5 GWh | Dec 2008 | Dec 2025 | Wind |
| Baron Winds Farm | RWE Clean Energy | Cohocton, NY | New York Independent System Operator (NYIS) | 305.2 GWh | Jan 2023 | May 2026 | Wind |
| TJA-NY-Cohocton Solar Farm, LLC | Dimension Energy LLC | Cohocton, NY | New York Independent System Operator (NYIS) | 6.5 GWh | Nov 2024 | Nov 2025 | Solar |
| Hecate Energy Albany 2 LLC | Greenbacker Renewable Energy Corporation | Coeymans, NY | New York Independent System Operator (NYIS) | 30.3 GWh | Mar 2024 | Dec 2025 | Solar |
| Hecate Energy Albany County 1 | Greenbacker Renewable Energy Corporation | Coeymans, NY | New York Independent System Operator (NYIS) | 27.5 GWh | Jan 2024 | Dec 2025 | Solar |
| 25 Ashdown Road Solar, LLC | AES Distributed Energy | Clifton Park, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Nov 2019 | Dec 2025 | Solar |
| Sugar Hill Solar 1 | Sugar Hill Solar 1, LLC | Clifton Park, NY | ISO New England (ISNE) | 8.0 GWh | Nov 2020 | Dec 2025 | Solar |
| ASA Clayton NY Solar I LLC | ASA Clayton NY Solar I LLC | Clayton, NY | New York Independent System Operator (NYIS) | 2.6 GWh | Jun 2024 | Dec 2025 | Solar |
| Blanchard Road 1 Community Solar | OYA Blanchard Road LLC | Clayton, NY | New York Independent System Operator (NYIS) | 7.1 GWh | Nov 2019 | Dec 2025 | Solar |
| Blanchard Road 2 Community Solar | OYA Blanchard Road 2 LLC | Clayton, NY | New York Independent System Operator (NYIS) | 7.6 GWh | Nov 2019 | Dec 2025 | Solar |
| Great Lakes Seaway Community Solar | OYA Great Lakes Seaway LLC | Clayton, NY | New York Independent System Operator (NYIS) | 5.2 GWh | Nov 2019 | Dec 2025 | Solar |
| NYS Rte 12 Community Solar | OYA NYS Rte 12 LLC | Clayton, NY | New York Independent System Operator (NYIS) | 6.9 GWh | Nov 2019 | Dec 2025 | Solar |
| Onondaga County - Metro Water Board | Tesla Inc. | Clay, NY | New York Independent System Operator (NYIS) | 1.1 GWh | Jan 2016 | Dec 2025 | Solar |
| Clay Solar CSG | DG New York CS, LLC | Clay, NY | New York Independent System Operator (NYIS) | 7.4 GWh | May 2021 | Dec 2025 | Solar |
| Onondaga County - Oak Orchard WWTP | Tesla Inc. | Clay, NY | New York Independent System Operator (NYIS) | 2.5 GWh | Oct 2017 | Dec 2024 | Solar |
| Ver Plank North (CSG) | Nautilus Solar Solutions | Clay, NY | New York Independent System Operator (NYIS) | 5.0 GWh | Nov 2024 | Dec 2025 | Solar |
| Ver Plank South (CSG) | Nautilus Solar Solutions | Clay, NY | New York Independent System Operator (NYIS) | 8.3 GWh | Nov 2024 | Dec 2025 | Solar |
| ELP Claverack Solar | ELP Claverack Solar, LLC | Claverack, NY | New York Independent System Operator (NYIS) | 9.2 GWh | Dec 2022 | Dec 2025 | Solar |
| Buck Run | SunStrong Management, LLC | Clarkson, NY | New York Independent System Operator (NYIS) | 114.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Marble River Wind Farm | Marble River, LLC | Churubusco, NY | New York Independent System Operator (NYIS) | 470.7 GWh | Oct 2012 | May 2026 | Wind |
| Ellenburg | Valcour Operating Services, LLC | Churubusco, NY | New York Independent System Operator (NYIS) | 167.7 GWh | Apr 2008 | Dec 2025 | Wind |
| Clinton | Valcour Operating Services, LLC | Churubusco, NY | New York Independent System Operator (NYIS) | 177.6 GWh | Apr 2008 | Dec 2025 | Wind |
| Columbia University - Johnson Farms | AES Distributed Energy | Chester, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Jun 2018 | Dec 2025 | Solar |
| Chester CSG | Altus Power America Management, LLC | Chester, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Jun 2019 | Dec 2025 | Solar |
| Cassadaga Wind Farm | RWE Clean Energy | Cherry Creek, NY | New York Independent System Operator (NYIS) | 259.3 GWh | Jun 2021 | May 2026 | Wind |
| NY8 - Puckett Solar | MN8 Energy LLC | Chenango Forks, NY | New York Independent System Operator (NYIS) | 31.7 GWh | Sep 2022 | Dec 2025 | Solar |
| Greene Community Solar | Greene Community Solar LLC | Chenango Forks, NY | New York Independent System Operator (NYIS) | 5.3 GWh | Nov 2024 | Dec 2025 | Solar |
| Vulcraft Solar | Soltage VUL 1600 Chemung, LLC | Chemung, NY | New York Independent System Operator (NYIS) | 1.9 GWh | Oct 2013 | Dec 2025 | Solar |
| Jericho Rise Wind Farm LLC | Jericho Rise Wind Farm LLC | Chateaugay, NY | New York Independent System Operator (NYIS) | 160.1 GWh | Nov 2016 | May 2026 | Wind |
| Chasm Hydro Partnership | Ampersand Chasm Hydro LLC | Chateaugay, NY | New York Independent System Operator (NYIS) | 1.9 GWh | Feb 1982 | Nov 2025 | Water |
| Chateaugay | Valcour Operating Services, LLC | Chateaugay, NY | New York Independent System Operator (NYIS) | 200.8 GWh | Mar 2009 | Dec 2025 | Wind |
| NSF Chateaugay Site 1 | NSF Chateaugay Site 1 LLC | Chateaugay, NY | New York Independent System Operator (NYIS) | 7.2 GWh | Dec 2024 | Dec 2025 | Solar |
| NSF Chateaugay Site 2 | NSF Chateaugay Site 2 LLC | Chateaugay, NY | New York Independent System Operator (NYIS) | 6.1 GWh | Dec 2024 | Dec 2025 | Solar |
| Chaffee Gas Recovery | WM Renewable Energy LLC | Chaffee, NY | New York Independent System Operator (NYIS) | 37.4 GWh | Jul 2007 | Dec 2025 | Landfill Gas |
| Cohalan | CD US Solar MT1 LLC | Central Islip, NY | New York Independent System Operator (NYIS) | 4.9 GWh | Aug 2012 | Dec 2025 | Solar |
| Fenner Wind | CHI Energy Inc | Cazenovia, NY | New York Independent System Operator (NYIS) | 75.8 GWh | Sep 2001 | Dec 2025 | Wind |
| Dunkleman Solar | Generate Capital | Cattaraugus, NY | New York Independent System Operator (NYIS) | 9.1 GWh | Dec 2022 | Dec 2025 | Solar |
| Castleton Energy Center | Fortistar Castleton Power | Castleton, NY | New York Independent System Operator (NYIS) | 144.5 GWh | Jan 1992 | Dec 2025 | Natural Gas : 99.2% Distillate Fuel Oil : 0.8% |
| Castleton | Altus Power America Management, LLC | Castleton on Hudson, NY | New York Independent System Operator (NYIS) | 8.1 GWh | May 2021 | Dec 2025 | Solar |
| Chenango Solar | Citizens Enterprises Corporation | Castle Creek, NY | New York Independent System Operator (NYIS) | 6.7 GWh | Nov 2019 | Dec 2025 | Solar |
| Carthage Energy LLC | Carthage Energy LLC | Carthage, NY | New York Independent System Operator (NYIS) | 6.7 GWh | Oct 1991 | Oct 2025 | Natural Gas |
| Herrings | Erie Boulevard Hydropower LP | Carthage, NY | New York Independent System Operator (NYIS) | 18.4 GWh | Dec 1923 | Dec 2025 | Water |
| NY 26 Carthage CSG | Standard Solar | Carthage, NY | New York Independent System Operator (NYIS) | 6.9 GWh | Feb 2020 | Dec 2025 | Solar |
| Carthage B | NY USLE Carthage SR26 B LLC | Carthage, NY | New York Independent System Operator (NYIS) | 5.3 GWh | Feb 2022 | Dec 2025 | Solar |
| Carthage A | NY USLE Carthage SR26 A LLC | Carthage, NY | New York Independent System Operator (NYIS) | 7.6 GWh | Mar 2022 | Dec 2025 | Solar |
| Grass River | SunStrong Management, LLC | Canton, NY | New York Independent System Operator (NYIS) | 1.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Sheesley (CSG) | Nautilus Solar Solutions | Canton, NY | New York Independent System Operator (NYIS) | 7.0 GWh | Nov 2024 | Dec 2025 | Solar |
| TJA-NY-Canton Solar Farm LLC | Dimension Energy LLC | Canton, NY | New York Independent System Operator (NYIS) | 6.9 GWh | Nov 2024 | Dec 2025 | Solar |
| North Woods (CSG) | Nautilus Solar Solutions | Canton, NY | New York Independent System Operator (NYIS) | 2.3 GWh | Jun 2025 | Dec 2025 | Solar |
| Spencer (NY) | Generate Capital | Candor, NY | New York Independent System Operator (NYIS) | 9.1 GWh | Dec 2023 | Dec 2025 | Solar |
| Marathon Solar Farm II LLC North | Distributed Solar Development, LLC | Canastota, NY | New York Independent System Operator (NYIS) | 4.2 GWh | Nov 2020 | Dec 2025 | Solar |
| Marathon Solar Farm LLC South | Distributed Solar Development, LLC | Canastota, NY | New York Independent System Operator (NYIS) | 5.8 GWh | Nov 2020 | Dec 2025 | Solar |
| Lenox Renewables | Lenox Renewables, LLC | Canastota, NY | ISO New England (ISNE) | 5.6 GWh | Aug 2021 | Dec 2025 | Solar |
| Owlville Creek Solar 2, LLC | Owlville Creek Solar 2, LLC | Canastota, NY | New York Independent System Operator (NYIS) | 7.8 GWh | Nov 2020 | Dec 2024 | Solar |
| Owlville Creek Solar, LLC | Owlville Creek Solar, LLC | Canastota, NY | New York Independent System Operator (NYIS) | 8.4 GWh | Nov 2020 | Dec 2025 | Solar |
| Madison County | Onsite Partners, LLC | Canastota, NY | New York Independent System Operator (NYIS) | 2.1 GWh | Jul 2017 | Dec 2024 | Solar |
| Canandaigua Westbrook Solar Array | Onsite Partners, LLC | Canandaigua, NY | New York Independent System Operator (NYIS) | 1.8 GWh | Feb 2017 | Dec 2024 | Solar |
| Canandaigua Solar Array | Onsite Partners, LLC | Canandaigua, NY | New York Independent System Operator (NYIS) | 2.4 GWh | Nov 2016 | Dec 2024 | Solar |
| Aegis CSG | Nautilus Solar Solutions | Canadaigua, NY | New York Independent System Operator (NYIS) | 3.4 GWh | Nov 2018 | Dec 2025 | Solar |
| Maybrook Solar, LLC (CSG) | NJR Clean Energy Ventures Corporation | Campbell Hall, NY | New York Independent System Operator (NYIS) | 8.9 GWh | Jan 2023 | Dec 2025 | Solar |
| CAMILLUS B (CSG) | AETS OpCo Holdings LLC | Camillus, NY | New York Independent System Operator (NYIS) | 7.9 GWh | Sep 2024 | Dec 2025 | Solar |
| CAMILLUS A (CSG) | AETS OpCo Holdings LLC | Camillus, NY | New York Independent System Operator (NYIS) | 8.2 GWh | Sep 2024 | Dec 2025 | Solar |
| Wolcott Hill (Camden) (CSG) | Nautilus Solar Solutions | Camden, NY | New York Independent System Operator (NYIS) | 6.4 GWh | Nov 2024 | Dec 2025 | Solar |
| Camden CSD Solar Array | Onsite Partners, LLC | Camden, NY | New York Independent System Operator (NYIS) | 2.0 GWh | Nov 2017 | Dec 2024 | Solar |
| Cambridge Solar | Generate Capital | Cambridge, NY | New York Independent System Operator (NYIS) | 3.6 GWh | May 2025 | Dec 2025 | Solar |
| Calverton Solar Energy Center | LI Solar Generation, LLC | Calverton, NY | New York Independent System Operator (NYIS) | 41.7 GWh | Jul 2022 | Dec 2025 | Solar |
| Sutter Greenworks LLC | AES Distributed Energy | Calverton, NY | New York Independent System Operator (NYIS) | 8.3 GWh | Sep 2015 | Dec 2025 | Solar |
| Leavenworth Greenworks LLC | AES Distributed Energy | Calverton, NY | New York Independent System Operator (NYIS) | 17.7 GWh | May 2016 | Dec 2025 | Solar |
| Riverhead Solar Farm | AES Distributed Energy | Calverton, NY | New York Independent System Operator (NYIS) | 33.4 GWh | Jun 2019 | Dec 2025 | Solar |
| Calverton | Terraform Arcadia | Calverton, NY | New York Independent System Operator (NYIS) | 4.4 GWh | Sep 2015 | Dec 2025 | Solar |
| Sterlington Greenworks LLC | AES Distributed Energy | Calverton, NY | New York Independent System Operator (NYIS) | 2.1 GWh | Sep 2015 | Dec 2025 | Solar |
| NY- CSG- Livingston 4 | NY- CSG- Livingston 4 | Caledonia, NY | New York Independent System Operator (NYIS) | 2.0 GWh | Jan 2020 | Dec 2025 | Solar |
Browse Power Plants By New York Counties
Figures are based on December 2025 generation numbers.| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| Jefferson County, NY | # 29 | 38 | 404.0 GWh |
| Franklin County, NY | # 28 | 17 | 424.5 GWh |
| Westchester County, NY | # 27 | 32 | 439.7 GWh |
| Bronx County, NY | # 26 | 15 | 456.6 GWh |
| Monroe County, NY | # 25 | 42 | 587.3 GWh |
| Onondaga County, NY | # 24 | 46 | 620.8 GWh |
| Yates County, NY | # 23 | 6 | 663.1 GWh |
| Chautauqua County, NY | # 22 | 36 | 883.2 GWh |
| Wyoming County, NY | # 21 | 15 | 1.1 TWh |
| Steuben County, NY | # 20 | 22 | 1.1 TWh |
| Clinton County, NY | # 19 | 26 | 1.6 TWh |
| Lewis County, NY | # 18 | 28 | 1.6 TWh |
| Saratoga County, NY | # 17 | 43 | 1.7 TWh |
| Richmond County, NY | # 16 | 19 | 1.9 TWh |
| Rockland County, NY | # 15 | 10 | 2.1 TWh |
| Nassau County, NY | # 14 | 24 | 2.4 TWh |
| Kings County, NY | # 13 | 31 | 2.5 TWh |
| New York County, NY | # 12 | 19 | 2.5 TWh |
| Greene County, NY | # 11 | 14 | 2.7 TWh |
| Rensselaer County, NY | # 10 | 23 | 3.3 TWh |
| Albany County, NY | # 9 | 33 | 4.1 TWh |
| Wayne County, NY | # 8 | 13 | 4.7 TWh |
| Orange County, NY | # 7 | 60 | 5.7 TWh |
| Dutchess County, NY | # 6 | 22 | 6.4 TWh |
| St. Lawrence County, NY | # 5 | 69 | 7.8 TWh |
| Suffolk County, NY | # 4 | 69 | 9.4 TWh |
| Queens County, NY | # 3 | 23 | 13.7 TWh |
| Niagara County, NY | # 2 | 26 | 14.9 TWh |
| Oswego County, NY | # 1 | 36 | 30.3 TWh |