Sheesley (CSG)
95 Judson Street, Canton, NY 13617Plant Summary Information
Sheesley (CSG) is ranked #542 out of 544 solar farms in New York in terms of total annual net electricity generation.
Sheesley (CSG) generated 15.0 MWh during the 3-month period between September 2024 to December 2024.
Plant Name | Sheesley (CSG) |
---|---|
Utility Name | Nautilus Solar Solutions |
Location | St. Lawrence County, NY |
Initial Operation Date | December 2024 |
Last Update | Dec 2024 |
Annual Generation | 15.0 MWh |
Annual Consumption | 51 MMBtu |
Ranked #12,157 out of 12,299 Power Plants Nationwide | |
Ranked #6,153 out of 6,182 Solar Power Plants Nationwide | |
Ranked #899 out of 912 New York Power Plants | |
Ranked #542 out of 544 New York Solar Power Plants | |
Fuel Types | Solar |
Map of Sheesley (CSG)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sheesley (CSG).
Monthly Net Generation for Sheesley (CSG)
Sheesley (CSG) Details
Summary Information | |
---|---|
Plant Name | Sheesley (CSG) (67329) |
Plant Address | 95 Judson Street, Canton, NY 13617 |
Utility | Nautilus Solar Solutions (61227) |
Latitude, Longitude | 44.6059, -75.1589 |
Generation Dates on File | Dec 2024 to Dec 2024 |
Initial Operation Date | December 2024 |
Annual Generation | 15.0 MWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | New York Independent System Operator (NYIS) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Niagara Mohawk Power Corp. (13573) NY |
Grid Voltage | 23.00 kV |
Energy Storage | No |
Generator SC Details Operating December 2024
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 4.4 MW |
Summer Capacity | 4.4 MW |
Winter Capacity | 4.4 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2024 |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 52 |
DC Net Capacity | 6.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | Yes |
Virtual Net Metering DC Capacity | 6.2 MW |
Sheesley (CSG) Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#6143 | Bighorn Solar | Salem, OR | 29.0 MWh |
#6144 | Newark Solar 1 LLC | Newark, NJ | 27.0 MWh |
#6145 | Minke Solar | Molalla, OR | 27.0 MWh |
#6146 | Independence Road (CSG) | Independence, NY | 26.0 MWh |
#6147 | Sikorsky Aircraft CHP | Stratford, CT | 53.1 GWh |
#6148 | Pika Solar | Mt. Angel, OR | 25.0 MWh |
#6149 | OR - Green Key - Gun Club | Dundee, OR | 24.0 MWh |
#6150 | Museum Drive East Solar | Grand Island, NE | 22.0 MWh |
#6151 | Glenville Solar (CSG) | Glenville, NY | 17.0 MWh |
#6152 | Novel Milbradt Solar LLC | Belview, MN | 16.0 MWh |
#6154 | LaFayette Solar WI, LLC | Elkhorn, WI | 15.0 MWh |
#6155 | Brush Creek Solar | Silverton, OR | 15.0 MWh |
#6156 | Drift Creek Solar | Silverton, OR | 15.0 MWh |
#6157 | Novel Froehle Solar LLC | Cold Spring, MN | 15.0 MWh |
#6158 | Cabrillo College | Aptos, CA | 13.0 MWh |
#6159 | Altamont (NY) (CSG) | Guilderland, NY | 12.0 MWh |
#6160 | Greene Community Solar | Chenango Forks, NY | 12.0 MWh |
#6161 | Improvement Dst No. 4 | Bakersfield, CA | 12.0 MWh |
#6162 | Silverton Solar | Silverton, OR | 12.0 MWh |
#6163 | Sheep Solar | Turner, OR | 12.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Sheesley (CSG).
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
ASA DeKalb NY Solar I LLC | DeKalb, NY | 6.5 GWh | 8.9 mi |
ASA DeKalb NY Solar II LLC | DeKalb, NY | 4.7 GWh | 9.2 mi |
CES Heuvelton | Ogdensburg, NY | 1.9 GWh | 14.1 mi |
CJ Solar I, LLC | Lisbon, NY | 3.2 GWh | 9.5 mi |
Clarkson Solar | Potsdam, NY | 1.9 GWh | 11.3 mi |
Colton | Pierrepont, NY | 195.0 GWh | 10 mi |
COU Solar I, LLC | Lisbon, NY | 2.3 GWh | 9.5 mi |
Hannawa | Pierrepont, NY | 52.5 GWh | 9.2 mi |
Heuvelton | Village of Heuvelton, NY | 5.0 GWh | 12.1 mi |
Hewittville Hydroelectric | Norwood, NY | 13.8 GWh | 10.1 mi |
Higley | Colton, NY | 37.2 GWh | 12.3 mi |
Norwood | Norwood, NY | 13.1 GWh | 12.2 mi |
NY Hermon 1040 County Rd 21 | Hermon, NY | 589.0 MWh | 12.3 mi |
NY Lancaster Shisler Rd Site 2 Solar CSG | Lancaster, NY | 6.1 GWh | 10.8 mi |
NY Potsdam 28 Hamilton St. Solar | Potsdam, NY | 7.2 GWh | 10.8 mi |
Pyrites Plant | Pyrites, NY | 25.3 GWh | 6 mi |
Sissonville Hydro | Potsdam, NY | 15.7 GWh | 9.4 mi |
Sugar Island | Potsdam, NY | 28.1 GWh | 9.3 mi |
Unionville Hydro Project 2499 NY | Norwood, NY | 13.3 GWh | 11 mi |