Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
St. Johns Episcopal Hospital | St. Johns Episcopal Hospital | Far Rockaway, NY | New York Independent System Operator (NYIS) | 6.0 MWh | Dec 1994 | Dec 2023 | Distillate Fuel Oil |
Mount Sinai South Nassau Hospital | Mount Sinai South Nassau Hospital | Oceanside, NY | New York Independent System Operator (NYIS) | 24.5 MWh | Dec 1974 | Dec 2023 | Distillate Fuel Oil |
Duanesburg | Onyx Asset Services Group | Duanesburg, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Mar 2018 | Dec 2023 | Solar |
Amsterdam South | Onyx Asset Services Group | Amsterdam, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Mar 2018 | Dec 2023 | Solar |
Amsterdam North | Onyx Asset Services Group | Amsterdam, NY | New York Independent System Operator (NYIS) | 2.9 GWh | Mar 2018 | Dec 2023 | Solar |
Sharon Springs | Onyx Asset Services Group | Sharon Springs, NY | New York Independent System Operator (NYIS) | 2.3 GWh | Apr 2018 | Dec 2023 | Solar |
Holtsville Solar Project | CVI Renewables Holdings, LLC. | Holtsville, NY | New York Independent System Operator (NYIS) | 2.1 GWh | Nov 2017 | Dec 2023 | Solar |
Blydenburgh Solar Project | CVI Renewables Holdings, LLC. | Haupaugge, NY | New York Independent System Operator (NYIS) | 2.8 GWh | Nov 2018 | Dec 2023 | Solar |
Lincoln Ave Solar Project | CVI Renewables Holdings, LLC. | Holbrook, NY | New York Independent System Operator (NYIS) | 3.5 GWh | Nov 2018 | Dec 2023 | Solar |
Solean Solar Project | BQ Energy LLC | Olean, NY | New York Independent System Operator (NYIS) | 8.4 GWh | Mar 2016 | Dec 2023 | Solar |
Johnstown | Onyx Asset Services Group | Johnstown, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Mar 2018 | Dec 2023 | Solar |
Kearsarge Oppenheim CSG | Kearsarge Oppenheim LLC | St. Johnsville, NY | New York Independent System Operator (NYIS) | 2.1 GWh | Jun 2018 | Dec 2023 | Solar |
Broadalbin | Onyx Asset Services Group | Broadalbin, NY | New York Independent System Operator (NYIS) | 2.7 GWh | Mar 2018 | Dec 2023 | Solar |
City of Rochester Solar | AES Distributed Energy | Rochester, NY | New York Independent System Operator (NYIS) | 2.8 GWh | Nov 2017 | Dec 2023 | Solar |
HGS Solar I | HGS solar I, LLC | Whitehall, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Aug 2016 | Dec 2023 | Solar |
Gore Mountain Solar II | Gore Mountain Solar II, LLC | Whitehall, NY | New York Independent System Operator (NYIS) | 2.7 GWh | Aug 2016 | Dec 2023 | Solar |
Seneca Nation Cattaraugus Wind Turbine | Seneca Nation | Irving, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Feb 2017 | Dec 2023 | Wind |
Madison County | AEP Onsite Partners, LLC | Canastota, NY | New York Independent System Operator (NYIS) | 2.6 GWh | Jul 2017 | Dec 2023 | Solar |
Onyx - Saratoga Springs Landfill Solar CSG | Onyx Asset Services Group | Saratoga Springs, NY | New York Independent System Operator (NYIS) | 2.7 GWh | Oct 2017 | Dec 2023 | Solar |
Route 19 #1 Community Solar Farm | Generate Capital | Pike, NY | New York Independent System Operator (NYIS) | 3.8 GWh | May 2022 | Dec 2023 | Solar |
Sunlight Beacon | BQ Energy LLC | Beacon, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Jun 2018 | Dec 2023 | Solar |
Broadalbin-Perth Solar | AES Distributed Energy | Amsterdam, NY | New York Independent System Operator (NYIS) | 2.1 GWh | Aug 2018 | Dec 2023 | Solar |
The Bank of New York | The Bank of New York | New York, NY | New York Independent System Operator (NYIS) | 30.0 MWh | Dec 1982 | Dec 2023 | Distillate Fuel Oil |
Brooklyn Hospital Center | Brooklyn Hospital Center | Brooklyn, NY | New York Independent System Operator (NYIS) | 27.0 MWh | Dec 1974 | Dec 2023 | Distillate Fuel Oil |
Saint Catherine of Siena Medical Center | Saint Catherine of Siena Medical Center | Smithtown, NY | New York Independent System Operator (NYIS) | 13.0 MWh | Dec 1971 | Dec 2023 | Distillate Fuel Oil |
Riverhead Solar Farm | AES Distributed Energy | Calverton, NY | New York Independent System Operator (NYIS) | 30.4 GWh | Jun 2019 | Dec 2023 | Solar |
Enfield Community Solar | Enfield Community Solar | Ithaca, NY | New York Independent System Operator (NYIS) | 848.0 MWh | Nov 2017 | Dec 2023 | Solar |
Baer Road CSG | Delaware River Solar, LLC | New York, NY | New York Independent System Operator (NYIS) | 2.7 GWh | Dec 2017 | Dec 2023 | Solar |
Kingsbrook Jewish Medical Center | Kingsbrook Jewish Medical Center | Brooklyn, NY | New York Independent System Operator (NYIS) | 32.0 MWh | Jul 1999 | Dec 2023 | Distillate Fuel Oil |
St Johns Riverside Hospital | St Johns Riverside Hospital | Yonkers, NY | New York Independent System Operator (NYIS) | 6.0 MWh | Dec 1967 | Dec 2023 | Distillate Fuel Oil |
Minisink Solar 1 LLC | Minisink Solar 1 LLC | Minisink, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Sep 2018 | Dec 2023 | Solar |
Minisink Community Solar 2 LLC | Minisink Solar 2 LLC | Minisink, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Oct 2018 | Dec 2023 | Solar |
Kelly Bridge Road Community Solar Farm | Generate Capital | Liberty, NY | New York Independent System Operator (NYIS) | 2.8 GWh | Dec 2019 | Dec 2023 | Solar |
Hospital Rd Community Solar Farm CSG | Delaware River Solar, LLC | Delaware, NY | New York Independent System Operator (NYIS) | 2.0 GWh | Nov 2019 | Dec 2023 | Solar |
Pool Brook Rd Community Solar Farm | Generate Capital | Laurens, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Mar 2019 | Dec 2023 | Solar |
Hickory Grove #1 | Altus Power America Management, LLC | Horseheads, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Nov 2020 | Dec 2023 | Solar |
RT 52 Walden Solar 1, LLC Hybrid | AES Distributed Energy | Montgomery, NY | New York Independent System Operator (NYIS) | 6.4 GWh | Nov 2019 | Dec 2023 | Solar |
Finchville Solar, LLC Hybrid CSG | AES Distributed Energy | Mt. Hope, NY | New York Independent System Operator (NYIS) | 7.6 GWh | Sep 2020 | Dec 2023 | Solar : 99.4% Electricity used for energy storage : 0.6% |
25 Ashdown Road Solar, LLC | AES Distributed Energy | Clifton Park, NY | New York Independent System Operator (NYIS) | 5.4 GWh | Nov 2019 | Dec 2023 | Solar |
Burrstone Energy Center | Burrstone Energy Center | New Hartford, NY | New York Independent System Operator (NYIS) | 17.1 GWh | Jul 2009 | Dec 2023 | Natural Gas |
Chambers Road Solar | Altus Power America Management, LLC | Big Flats, NY | New York Independent System Operator (NYIS) | 6.1 GWh | Nov 2020 | Dec 2023 | Solar |
Garnet Solar (NY) | AEP Onsite Partners, LLC | Johnsburg, NY | New York Independent System Operator (NYIS) | 2.6 GWh | May 2018 | Dec 2023 | Solar |
Podunk Road CSG | Altus Power America Management, LLC | Enfield, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Jan 2019 | Dec 2023 | Solar |
Hickory Grove #2 | Altus Power America Management, LLC | Horseheads, NY | New York Independent System Operator (NYIS) | 2.8 GWh | Nov 2020 | Dec 2023 | Solar |
Brick Church Solar | Brick Church Solar 1, LLC | Brunswick, NY | New York Independent System Operator (NYIS) | 6.2 GWh | Aug 2019 | Dec 2023 | Solar |
RIT Henrietta Solar 1, LLC | SolRiver Capital LLC | Rochester, NY | New York Independent System Operator (NYIS) | 2.0 GWh | Nov 2018 | Dec 2023 | Solar |
Sugarhill Road - Solitude Solar CSG | Standard Solar | Rexford, NY | New York Independent System Operator (NYIS) | 7.7 GWh | Aug 2019 | Dec 2023 | Solar |
Malone Solar Site | Helios NY I, LLC | Malone, NY | New York Independent System Operator (NYIS) | 1.4 GWh | Nov 2018 | Dec 2023 | Solar |
Franklin Solar Site | Helios NY I, LLC | Malone, NY | New York Independent System Operator (NYIS) | 2.0 GWh | Nov 2018 | Dec 2023 | Solar |
Ulster County Solar | Ulster Solar LLC | Kingston, NY | New York Independent System Operator (NYIS) | 1.7 GWh | Apr 2018 | Dec 2023 | Solar |
Chester CSG | Altus Power America Management, LLC | Chester, NY | New York Independent System Operator (NYIS) | 2.3 GWh | Jun 2019 | Dec 2023 | Solar |
Greenville CSG | Altus Power America Management, LLC | Port Jervis, NY | New York Independent System Operator (NYIS) | 2.8 GWh | Jul 2019 | Dec 2023 | Solar |
Harbec Energy | Harbec Energy | Ontario, NY | New York Independent System Operator (NYIS) | 977.0 MWh | Nov 2001 | Dec 2023 | Wind : 55.7% Natural Gas : 44.3% |
Johnstown Solar 1, LLC | AES Distributed Energy | Gloversville, NY | New York Independent System Operator (NYIS) | 4.9 GWh | Nov 2019 | Dec 2023 | Solar |
Hollygrove CSG | Nautilus Solar Solutions | Red Creek, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Nov 2018 | Dec 2023 | Solar |
Guildlerland CSG | Nautilus Solar Solutions | Guilderland, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Nov 2018 | Dec 2023 | Solar |
Howland CSG | Nautilus Solar Solutions | Sandy Creek, NY | New York Independent System Operator (NYIS) | 2.7 GWh | Nov 2018 | Dec 2023 | Solar |
Gifford CSG | Nautilus Solar Solutions | Schenectady, NY | New York Independent System Operator (NYIS) | 2.8 GWh | Nov 2018 | Nov 2023 | Solar |
Czub CSG | Nautilus Solar Solutions | Schagticoke, NY | New York Independent System Operator (NYIS) | 3.4 GWh | Nov 2018 | Dec 2023 | Solar |
Mereand CSG | Nautilus Solar Solutions | Watertown, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Nov 2018 | Dec 2023 | Solar |
Aegis CSG | Nautilus Solar Solutions | Canadaigua, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Nov 2018 | Dec 2023 | Solar |
Pearl CSG | Nautilus Solar Solutions | Batavia, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Nov 2018 | Dec 2023 | Solar |
Bethlehem Solar | Nautilus Solar Solutions | New Scotland, NY | New York Independent System Operator (NYIS) | 2.5 GWh | May 2019 | Dec 2023 | Solar |
Frog Hollow CSG | Nautilus Solar Solutions | Ellenville, NY | New York Independent System Operator (NYIS) | 3.4 GWh | Sep 2019 | Dec 2023 | Solar |
Dover CSG | Nautilus Solar Solutions | Dover Plains, NY | New York Independent System Operator (NYIS) | 3.7 GWh | Aug 2019 | Dec 2023 | Solar |
Howell CSG | Nautilus Solar Solutions | Middletown, NY | New York Independent System Operator (NYIS) | 2.2 GWh | Jan 2020 | Dec 2023 | Solar |
Strauss CSG | Nautilus Solar Solutions | Geneva, NY | New York Independent System Operator (NYIS) | 3.4 GWh | Aug 2019 | Dec 2023 | Solar |
Ellsworth I CSG | Nautilus Solar Solutions | Mechanicville, NY | New York Independent System Operator (NYIS) | 2.0 GWh | Aug 2019 | Dec 2023 | Solar |
Frey Rd #2 Community Solar Farm | KSI II Consolidated, LLC | Macedon, NY | New York Independent System Operator (NYIS) | 2.4 GWh | Nov 2020 | Dec 2023 | Solar |
Boas Rd #3 Community Solar Farm | Altus Power America Management, LLC | Mooers, NY | New York Independent System Operator (NYIS) | 2.7 GWh | Jul 2019 | Dec 2023 | Solar |
Boas Rd #2 Community Solar Farm | Altus Power America Management, LLC | Mooers, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Jul 2019 | Dec 2023 | Solar |
Boas Rd #1 Community Solar Farm | Altus Power America Management, LLC | Mooers, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Jul 2019 | Dec 2023 | Solar |
Villa Roma Rd #4 CSG | Delaware River Solar, LLC | Delaware, NY | New York Independent System Operator (NYIS) | 2.4 GWh | Nov 2019 | Dec 2023 | Solar |
Villa Roma Rd #3 CSG | Delaware River Solar, LLC | Delaware, NY | New York Independent System Operator (NYIS) | 2.4 GWh | Nov 2019 | Dec 2023 | Solar |
Villa Roma Rd #2 | Generate Capital | Delaware, NY | New York Independent System Operator (NYIS) | 2.7 GWh | Jan 2020 | Dec 2023 | Solar |
Villa Roma Rd #1 | Generate Capital | Delaware, NY | New York Independent System Operator (NYIS) | 2.4 GWh | Jan 2020 | Dec 2023 | Solar |
Route 22 Community Solar Farm CSG | KSI II Consolidated, LLC | Plattsburgh, NY | New York Independent System Operator (NYIS) | 5.9 GWh | Sep 2021 | Dec 2023 | Solar |
Boas Rd #4 Community Solar Farm | Generate Capital | Mooers, NY | New York Independent System Operator (NYIS) | 2.6 GWh | Jan 2020 | Dec 2023 | Solar |
Yellow Mills Rd #3 Community Solar Farm | Generate Capital | Farmington, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Nov 2022 | Dec 2023 | Solar |
Yellow Mills Rd #2 Community Solar Farm | Generate Capital | Farmington, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Nov 2022 | Dec 2023 | Solar |
Yellow Mills Rd #1 Community Solar Farm | Generate Capital | Farmington, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Nov 2022 | Dec 2023 | Solar |
Furnace Rd Community Solar Farm | KSI II Consolidated, LLC | Ontario, NY | New York Independent System Operator (NYIS) | 4.5 GWh | Nov 2020 | Dec 2023 | Solar |
County Route 11 Community Solar Farm | KSI II Consolidated, LLC | Mooers, NY | New York Independent System Operator (NYIS) | 5.9 GWh | Nov 2020 | Dec 2023 | Solar |
Frey Rd #1 Community Solar Farm | KSI II Consolidated, LLC | Macedon, NY | New York Independent System Operator (NYIS) | 2.4 GWh | Nov 2020 | Dec 2023 | Solar |
Route 19 #2 Community Solar Farm | Generate Capital | Pike, NY | New York Independent System Operator (NYIS) | 9.1 GWh | May 2022 | Dec 2023 | Solar |
Allis Medina Solar LLC CSG | AES Distributed Energy | Medina, NY | New York Independent System Operator (NYIS) | 7.8 GWh | Jun 2020 | Dec 2023 | Solar |
Kearsarge Johnstown 1 CSG | Kearsarge Johnstown 1 LLC | Johnstown, NY | New York Independent System Operator (NYIS) | 2.2 GWh | Nov 2018 | Dec 2023 | Solar |
Kearsarge Johnstown 2 CSG | Kearsarge Johnstown 2 LLC | Johnstown, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Nov 2018 | Dec 2023 | Solar |
ATT Jericho | Bloom Energy | Huntington, NY | New York Independent System Operator (NYIS) | 7.8 GWh | Feb 2017 | Dec 2023 | Natural Gas |
MER Queens | Bloom Energy | Elmhurst, NY | New York Independent System Operator (NYIS) | 7.8 GWh | Feb 2017 | Dec 2023 | Natural Gas |
Route 14A CDG Solar North and South LLC | Route 14A CDG Solar North and South, LLC | Geneva, NY | New York Independent System Operator (NYIS) | 6.3 GWh | Nov 2018 | Dec 2023 | Solar |
Newfield Community Solar LLC | Newfield Solar LLC | Newfield, NY | New York Independent System Operator (NYIS) | 8.7 GWh | Dec 2018 | Dec 2023 | Solar |
Montefiore Mount Vernon Hospital | Montefiore Mount Vernon Hospital | Mount Vernon, NY | New York Independent System Operator (NYIS) | 55.0 MWh | Dec 1975 | Dec 2023 | Distillate Fuel Oil |
CBP Solar | EnterSolar | Buchanan, NY | New York Independent System Operator (NYIS) | 2.3 GWh | Nov 2018 | Dec 2023 | Solar |
Kinder Morgan Fordham | EnterSolar | Staten Island, NY | New York Independent System Operator (NYIS) | 3.8 GWh | May 2018 | Dec 2023 | Solar |
Rockland Bakery Inc. | Rockland Bakery Inc. | Nanuet, NY | New York Independent System Operator (NYIS) | 19.0 MWh | Dec 1995 | Dec 2023 | Natural Gas : 93.8% Distillate Fuel Oil : 6.2% |
Steel Sun 2: 2303-III-9 Hamburg Tpke | BQ Energy LLC | Lackawanna, NY | New York Independent System Operator (NYIS) | 2.9 GWh | Apr 2019 | Dec 2023 | Solar |
Steel Sun 2: 2303-III-4 Hamburg Tpke | BQ Energy LLC | Lackawanna, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Apr 2019 | Dec 2023 | Solar |
Steel Sun 2: 2303-III-2 Hamburg Tpke | BQ Energy LLC | Lackawanna, NY | New York Independent System Operator (NYIS) | 2.7 GWh | Apr 2019 | Dec 2023 | Solar |
Homer Street West | BQ Energy LLC | Olean, NY | New York Independent System Operator (NYIS) | 2.2 GWh | Apr 2019 | Dec 2023 | Solar |