Directory of Power Plants in New York
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Adirondack Solar | Cypress Creek Renewables | Ellenburg Center, NY | New York Independent System Operator (NYIS) | 1.7 GWh | Aug 2018 | Dec 2024 | Solar |
| SWM Fuel Cell | Yaphank Fuel Cell Park, LLC | Yaphank, NY | New York Independent System Operator (NYIS) | 55.6 GWh | Nov 2021 | Dec 2024 | Natural Gas |
| Middletown Solar 1, LLC Hybrid CSG | AES Distributed Energy | Middletown, NY | New York Independent System Operator (NYIS) | 2.4 GWh | Nov 2020 | Dec 2024 | Solar |
| Westerlo NY 1 | Westerlo NY 1, LLC | South Westerlo, NY | New York Independent System Operator (NYIS) | 3.5 GWh | Dec 2019 | Dec 2024 | Solar |
| Calabro Airport North Solar Project | CVI Renewables Holdings, LLC. | Shirley, NY | New York Independent System Operator (NYIS) | 2.4 GWh | Nov 2019 | Dec 2024 | Solar |
| Calabro Airport South Solar Project | CVI Renewables Holdings, LLC. | Shirley, NY | New York Independent System Operator (NYIS) | 2.2 GWh | Nov 2019 | Dec 2024 | Solar |
| Mohonasen Central School District | Tesla Inc. | Schenectady, NY | New York Independent System Operator (NYIS) | 1.6 GWh | Aug 2019 | Dec 2024 | Solar |
| Fordham University | Fordham University | Bronx, NY | New York Independent System Operator (NYIS) | 6.0 MWh | Dec 1998 | Dec 2024 | Distillate Fuel Oil |
| SDM000 Clarkson Fuel Cell | 2016 ESA Project Company, LLC | Brooklyn, NY | New York Independent System Operator (NYIS) | 13.6 GWh | Apr 2018 | Dec 2024 | Natural Gas |
| NHH003 Clarkson Fuel Cell | 2016 ESA Project Company, LLC | Brooklyn, NY | New York Independent System Operator (NYIS) | 8.8 GWh | Aug 2018 | Dec 2024 | Natural Gas |
| NHH004 Winthrop Fuel Cell | 2016 ESA Project Company, LLC | Brooklyn, NY | New York Independent System Operator (NYIS) | 8.0 GWh | Aug 2018 | Dec 2024 | Natural Gas |
| Bluestone | Bluestone Solar LLC | Kingston, NY | New York Independent System Operator (NYIS) | 3.5 GWh | Feb 2019 | Dec 2024 | Solar |
| Mount Hope West | Mount Hope Solar 2 LLC | Mount Hope, NY | New York Independent System Operator (NYIS) | 3.6 GWh | Mar 2020 | Dec 2024 | Solar |
| Mount Hope East | Mount Hope Solar 1 LLC | Mount Hope, NY | New York Independent System Operator (NYIS) | 3.5 GWh | Sep 2019 | Dec 2024 | Solar |
| Villa Roma Rd #4 CSG | Scale Sustainable I, LLC | Delaware, NY | New York Independent System Operator (NYIS) | 2.2 GWh | Nov 2019 | Dec 2024 | Solar |
| Frey Rd #1 Community Solar Farm | KSI II Consolidated, LLC | Macedon, NY | New York Independent System Operator (NYIS) | 2.5 GWh | Nov 2020 | Dec 2024 | Solar |
| County Route 11 Community Solar Farm | KSI II Consolidated, LLC | Mooers, NY | New York Independent System Operator (NYIS) | 5.6 GWh | Nov 2020 | Dec 2024 | Solar |
| Furnace Rd Community Solar Farm | KSI II Consolidated, LLC | Ontario, NY | New York Independent System Operator (NYIS) | 4.7 GWh | Nov 2020 | Dec 2024 | Solar |
| Yellow Mills Rd #1 Community Solar Farm | Generate Capital | Farmington, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Nov 2022 | Dec 2024 | Solar |
| Yellow Mills Rd #2 Community Solar Farm | Generate Capital | Farmington, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Nov 2022 | Dec 2024 | Solar |
| Yellow Mills Rd #3 Community Solar Farm | Generate Capital | Farmington, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Nov 2022 | Dec 2024 | Solar |
| Frey Rd #2 Community Solar Farm | KSI II Consolidated, LLC | Macedon, NY | New York Independent System Operator (NYIS) | 2.5 GWh | Nov 2020 | Dec 2024 | Solar |
| Route 22 Community Solar Farm CSG | KSI II Consolidated, LLC | Plattsburgh, NY | New York Independent System Operator (NYIS) | 6.4 GWh | Sep 2021 | Dec 2024 | Solar |
| Kearsarge Oppenheim CSG | Kearsarge Oppenheim LLC | St. Johnsville, NY | New York Independent System Operator (NYIS) | 2.2 GWh | Jun 2018 | Dec 2024 | Solar |
| Villa Roma Rd #2 | Generate Capital | Delaware, NY | New York Independent System Operator (NYIS) | 2.5 GWh | Jan 2020 | Dec 2024 | Solar |
| Villa Roma Rd #3 CSG | Scale Sustainable I, LLC | Delaware, NY | New York Independent System Operator (NYIS) | 519.0 MWh | Nov 2019 | Dec 2024 | Solar |
| Route 19 #2 Community Solar Farm | Generate Capital | Pike, NY | New York Independent System Operator (NYIS) | 8.6 GWh | May 2022 | Dec 2024 | Solar |
| Grabinski | Grabinski Solar LLC | Walden, NY | New York Independent System Operator (NYIS) | 3.6 GWh | Jun 2019 | Aug 2024 | Solar |
| NYS Rte 12 Community Solar | OYA NYS Rte 12 LLC | Clayton, NY | New York Independent System Operator (NYIS) | 6.8 GWh | Nov 2019 | Dec 2024 | Solar |
| Blanchard Road 2 Community Solar | OYA Blanchard Road 2 LLC | Clayton, NY | New York Independent System Operator (NYIS) | 8.3 GWh | Nov 2019 | Dec 2024 | Solar |
| Blanchard Road 1 Community Solar | OYA Blanchard Road LLC | Clayton, NY | New York Independent System Operator (NYIS) | 7.1 GWh | Nov 2019 | Dec 2024 | Solar |
| Hecate Energy Albany County 1 | Greenbacker Renewable Energy Corporation | Coeymans, NY | New York Independent System Operator (NYIS) | 26.5 GWh | Jan 2024 | Dec 2024 | Solar |
| 6140 Route 209 - North | 6140 Route 209 - North, LLC | Kerhonkson, NY | New York Independent System Operator (NYIS) | 6.8 GWh | Sep 2019 | Dec 2024 | Solar |
| Off Airport Road - West | Off Airport Road - West, LLC | Accord, NY | New York Independent System Operator (NYIS) | 6.7 GWh | Nov 2019 | Dec 2024 | Solar |
| Wappinger 9D Solar | Wappinger 9D Solar, LLC | Wappinger, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Jun 2019 | Dec 2024 | Solar |
| Kenmare - Sullivan Community College | MN8 Energy LLC | Sheldrake, NY | New York Independent System Operator (NYIS) | 2.6 GWh | Jun 2015 | Dec 2024 | Solar |
| Brick Church Solar | Brick Church Solar 1, LLC | Brunswick, NY | New York Independent System Operator (NYIS) | 6.5 GWh | Aug 2019 | Dec 2024 | Solar |
| Canandaigua Solar Array | AEP Onsite Partners, LLC | Canandaigua, NY | New York Independent System Operator (NYIS) | 2.4 GWh | Nov 2016 | Dec 2024 | Solar |
| Jefferson-Lewis BOCES Solar | Cypress Creek Renewables | Watertown, NY | New York Independent System Operator (NYIS) | 2.6 GWh | Nov 2017 | Dec 2024 | Solar |
| Time Warner Cable - Knowles | Tesla Inc. | Bath, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Apr 2018 | Dec 2024 | Solar |
| Onyx - Lamphear Road CSG | Onyx Asset Services Group | Rome, NY | New York Independent System Operator (NYIS) | 2.7 GWh | Sep 2016 | Dec 2024 | Solar |
| Musgrave East Solar Farm | Artemis Solar LLC | Aurora, NY | New York Independent System Operator (NYIS) | 2.8 GWh | Nov 2016 | Dec 2024 | Solar |
| Mill Seat Renewable Energy Facility | WM Renewable Energy LLC | Bergen, NY | New York Independent System Operator (NYIS) | 50.8 GWh | Jun 2007 | Dec 2024 | Landfill Gas |
| Musgrave West Solar Farm | Artemis Solar LLC | Aurora, NY | New York Independent System Operator (NYIS) | 2.9 GWh | Nov 2016 | Dec 2024 | Solar |
| Montefiore - Westchester Square | Montefiore-Westchester Square | Bronx, NY | New York Independent System Operator (NYIS) | 9.0 MWh | Jun 1983 | Dec 2024 | Distillate Fuel Oil |
| New York Presbyterian Hospital-168th St | New York Presbyterian Hospital- 168th Street | New York, NY | New York Independent System Operator (NYIS) | 60.0 MWh | Dec 1999 | Dec 2024 | Distillate Fuel Oil |
| Harford Solar Farm | Laertes Solar LLC | Harford, NY | New York Independent System Operator (NYIS) | 2.8 GWh | Nov 2016 | Dec 2024 | Solar |
| Roaring Brook, LLC | Avangrid Power LLC | Lowville, NY | New York Independent System Operator (NYIS) | 204.1 GWh | Sep 2021 | Oct 2025 | Wind |
| Canandaigua Westbrook Solar Array | AEP Onsite Partners, LLC | Canandaigua, NY | New York Independent System Operator (NYIS) | 1.8 GWh | Feb 2017 | Dec 2024 | Solar |
| Oswego County - Fulton Solar | Tesla Inc. | Fulton, NY | New York Independent System Operator (NYIS) | 2.2 GWh | May 2018 | Dec 2024 | Solar |
| Green Island Hydroelectric Station | Albany Engineering Corporation | Green Island, NY | New York Independent System Operator (NYIS) | 37.4 GWh | Oct 1922 | Dec 2024 | Water |
| Finger Lakes Solar I | Finger Lakes Solar I, LLC | Geneva, NY | New York Independent System Operator (NYIS) | 2.8 GWh | Oct 2016 | Dec 2024 | Solar |
| New York Presbyterian Hospital- 68th Street | NY - PRESBYTERIAN HOSPITAL- 68TH ST | New York, NY | New York Independent System Operator (NYIS) | 54.0 GWh | Mar 1997 | Dec 2024 | Natural Gas : 99.9% |
| Cedar Creek PV | AES Distributed Energy | Seaford, NY | New York Independent System Operator (NYIS) | 2.8 GWh | May 2017 | Dec 2024 | Solar |
| Letchworth Solar Project | AEP Onsite Partners, LLC | Gainesville, NY | New York Independent System Operator (NYIS) | 1.8 GWh | May 2017 | Dec 2024 | Solar |
| NYC-HH - CONEY ISLAND HOSPITAL | NYC-HH Coney Island Hospital | Brooklyn, NY | New York Independent System Operator (NYIS) | 56.0 MWh | Jun 1993 | Dec 2024 | Distillate Fuel Oil |
| NY Times Daily Production Facility | The NY Times Production Facility | Flushing, NY | New York Independent System Operator (NYIS) | 409.0 MWh | Aug 2005 | Dec 2024 | Distillate Fuel Oil |
| The Mount Sinai Hospital | Mount Sinai Hospital | New York, NY | New York Independent System Operator (NYIS) | 184.0 MWh | May 1970 | Dec 2024 | Distillate Fuel Oil |
| Lichtenthal | AES Distributed Energy | Batavia, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Jun 2018 | Dec 2024 | Solar |
| Call Farms 1 | AES Distributed Energy | Batavia, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Jun 2018 | Dec 2024 | Solar |
| Calverton | Terraform Arcadia | Calverton, NY | New York Independent System Operator (NYIS) | 4.5 GWh | Sep 2015 | Dec 2024 | Solar |
| Kings Park Solar I | DG LF Solar, LLC | Kings Park, NY | New York Independent System Operator (NYIS) | 2.7 GWh | Jan 2019 | Dec 2024 | Solar |
| Kings Park Solar II | DG LF Solar, LLC | Kings Park, NY | New York Independent System Operator (NYIS) | 2.7 GWh | Jan 2019 | Dec 2024 | Solar |
| Clarkstown Landfill Solar Facility | Clarkstown Solar LLC | West Nyack, NY | New York Independent System Operator (NYIS) | 2.5 GWh | Nov 2014 | Dec 2024 | Solar |
| Shoreham Solar Commons | Duke Energy Renewables Services | Shoreham, NY | New York Independent System Operator (NYIS) | 45.1 GWh | Jun 2018 | Oct 2025 | Solar |
| Onondaga County - Metro Water Board | Tesla Inc. | Clay, NY | New York Independent System Operator (NYIS) | 1.1 GWh | Jan 2016 | Dec 2024 | Solar |
| Onondaga County - Oak Orchard WWTP | Tesla Inc. | Clay, NY | New York Independent System Operator (NYIS) | 2.5 GWh | Oct 2017 | Dec 2024 | Solar |
| Cornell Geneva Solar Farm | Argos Solar LLC | Seneca, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Nov 2015 | Dec 2024 | Solar |
| Onondaga County- Jamesville | Tesla Inc. | Jamesville, NY | New York Independent System Operator (NYIS) | 1.9 GWh | Feb 2018 | Dec 2024 | Solar |
| Vulcraft Solar | Soltage VUL 1600 Chemung, LLC | Chemung, NY | New York Independent System Operator (NYIS) | 2.0 GWh | Oct 2013 | Dec 2024 | Solar |
| Skidmore College | Terraform Arcadia | Saratoga Springs, NY | New York Independent System Operator (NYIS) | 2.2 GWh | Jun 2014 | Dec 2024 | Solar |
| Tompkins Cortland Community College | SEC LHNY Solar One, LLC | Dryden, NY | New York Independent System Operator (NYIS) | 2.4 GWh | Apr 2015 | Dec 2024 | Solar |
| Call Farms 3 | AES Distributed Energy | Batavia, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Jun 2018 | Dec 2024 | Solar |
| Cummins, Inc | Terraform Arcadia | Lakewood, NY | New York Independent System Operator (NYIS) | 1.5 GWh | May 2015 | Dec 2024 | Solar |
| Houghton | Terraform Arcadia | Houghton, NY | New York Independent System Operator (NYIS) | 2.0 GWh | Mar 2015 | Dec 2024 | Solar |
| Oneida - South | Oneida DG Solar, LLC | Whitestown, NY | New York Independent System Operator (NYIS) | 2.5 GWh | Nov 2015 | Dec 2024 | Solar |
| Oneida - West | Oneida DG Solar, LLC | Whitestown, NY | New York Independent System Operator (NYIS) | 2.5 GWh | Nov 2015 | Dec 2024 | Solar |
| Bethlehem - East | DG Bethlehem Solar, LLC | Selkirk, NY | New York Independent System Operator (NYIS) | 2.1 GWh | Feb 2016 | Dec 2024 | Solar |
| Bethlehem - West | DG Bethlehem Solar, LLC | Selkirk, NY | New York Independent System Operator (NYIS) | 2.1 GWh | Feb 2016 | Dec 2024 | Solar |
| Broome County | Tesla Inc. | Conklin, NY | New York Independent System Operator (NYIS) | 5.4 GWh | May 2018 | Dec 2024 | Solar |
| Baron Winds Farm | Big Sky Wind, LLC | Cohocton, NY | New York Independent System Operator (NYIS) | 350.8 GWh | Jan 2023 | Oct 2025 | Wind |
| Tannery Road Landfill | Tannery Road Solar, LLC | Rome, NY | New York Independent System Operator (NYIS) | 2.7 GWh | Jul 2016 | Oct 2025 | Solar |
| Sullivan County - Adult Care Solar | Tesla Inc. | Liberty, NY | New York Independent System Operator (NYIS) | 2.4 GWh | Apr 2017 | Dec 2024 | Solar |
| Sharon Springs | Onyx Asset Services Group | Sharon Springs, NY | New York Independent System Operator (NYIS) | 3.4 GWh | Apr 2018 | Dec 2024 | Solar |
| Seneca Nation Cattaraugus Wind Turbine | Seneca Nation | Irving, NY | New York Independent System Operator (NYIS) | 2.8 GWh | Feb 2017 | Dec 2024 | Wind |
| Gore Mountain Solar II | Gore Mountain Solar II, LLC | Whitehall, NY | New York Independent System Operator (NYIS) | 2.9 GWh | Aug 2016 | Dec 2024 | Solar |
| HGS Solar I | HGS solar I, LLC | Whitehall, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Aug 2016 | Dec 2024 | Solar |
| City of Rochester Solar | AES Distributed Energy | Rochester, NY | New York Independent System Operator (NYIS) | 2.8 GWh | Nov 2017 | Dec 2024 | Solar |
| Broadalbin | Onyx Asset Services Group | Broadalbin, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Mar 2018 | Dec 2024 | Solar |
| Duanesburg | Onyx Asset Services Group | Duanesburg, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Mar 2018 | Dec 2024 | Solar |
| Johnstown | Onyx Asset Services Group | Johnstown, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Mar 2018 | Dec 2024 | Solar |
| Solean Solar Project | BQ Energy LLC | Olean, NY | New York Independent System Operator (NYIS) | 8.4 GWh | Mar 2016 | Dec 2023 | Solar |
| Lincoln Ave Solar Project | CVI Renewables Holdings, LLC. | Holbrook, NY | New York Independent System Operator (NYIS) | 3.7 GWh | Nov 2018 | Dec 2024 | Solar |
| Blydenburgh Solar Project | CVI Renewables Holdings, LLC. | Haupaugge, NY | New York Independent System Operator (NYIS) | 2.9 GWh | Nov 2018 | Dec 2024 | Solar |
| Holtsville Solar Project | CVI Renewables Holdings, LLC. | Holtsville, NY | New York Independent System Operator (NYIS) | 2.0 GWh | Nov 2017 | Dec 2024 | Solar |
| Madison County | AEP Onsite Partners, LLC | Canastota, NY | New York Independent System Operator (NYIS) | 2.1 GWh | Jul 2017 | Dec 2024 | Solar |
| Amsterdam North | Onyx Asset Services Group | Amsterdam, NY | New York Independent System Operator (NYIS) | 3.4 GWh | Mar 2018 | Dec 2024 | Solar |
| Amsterdam South | Onyx Asset Services Group | Amsterdam, NY | New York Independent System Operator (NYIS) | 3.4 GWh | Mar 2018 | Dec 2024 | Solar |
| MER Queens | Bloom Energy | Elmhurst, NY | New York Independent System Operator (NYIS) | 9.7 GWh | Feb 2017 | Dec 2024 | Natural Gas |
| Sunlight Beacon | BQ Energy LLC | Beacon, NY | New York Independent System Operator (NYIS) | 3.3 GWh | Jun 2018 | Dec 2024 | Solar |