Directory of Power Plants in Minnesota
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Hammer CSG | DG Minnesota CSG, LLC | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.0 GWh | Nov 2018 | Dec 2024 | Solar |
USS Golly Gee Solar LLC | United States Solar Corporation | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Jun 2023 | Dec 2024 | Solar |
Sobania Community Solar LLC | Madison Energy Holdings LLC | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Aug 2020 | Dec 2024 | Solar |
Tiller CSG | DG Minnesota CSG, LLC | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.7 GWh | Nov 2018 | Dec 2024 | Solar |
Hammer Community (CSG) | Hammer Community Solar LLC | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Jul 2020 | Dec 2024 | Solar |
Sherco Solar I | Northern States Power Co - Minnesota | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 108.6 GWh | Sep 2024 | Mar 2025 | Solar |
Hinterland CSG, LLC | Madison Energy Holdings LLC | Clearlake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Oct 2020 | Dec 2024 | Solar |
MN CSG 2019-38 DE LLC | MN CSG 2019-38 DE LLC | Cleveland, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.4 GWh | Oct 2022 | Dec 2024 | Solar |
Red Maple Solar | Terraform Arcadia | Cleveland, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.1 GWh | May 2018 | Dec 2024 | Solar |
Pivot Energy Minnesota Solar 1 | Pivot Energy | Clinton Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 919.0 MWh | May 2023 | Dec 2023 | Solar |
Sappi Cloquet Mill | Sappi Cloquet LLC | Cloquet, MN | Midcontinent Independent System Operator, Inc. (MISO) | 469.8 GWh | Dec 1928 | Mar 2025 | Black Liquor : 66.5% Wood/Wood Waste Solids : 16.8% Natural Gas : 12.1% Water : 3.9% |
Knife Falls | ALLETE, Inc. | Cloquet, MN | Midcontinent Independent System Operator, Inc. (MISO) | 9.8 GWh | Dec 1921 | Dec 2024 | Water |
Clay Boswell | ALLETE, Inc. | Cohasset, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.5 TWh | Jun 1958 | Mar 2025 | Subbituminous Coal : 99.7% |
Laurel Village (CSG) | Laurel Village Community Solar LLC | Cokato, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Mar 2020 | Dec 2024 | Solar |
Cokato CSG | Cokato Holdco LLC | Cokato, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.0 GWh | Jul 2021 | Dec 2023 | Solar |
WakeSun LLC | SunShare Management | Cold Spring, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.4 GWh | Dec 2016 | Dec 2024 | Solar |
Novel Froehle Solar LLC | Novel Froehle Solar HQ LLC | Cold Spring, MN | Midcontinent Independent System Operator, Inc. (MISO) | 15.0 MWh | Nov 2024 | Dec 2024 | Solar |
USS Hancock Solar LLC CSG | United States Solar Corporation | Cologne, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Dec 2020 | Dec 2024 | Solar |
USS Lake Patterson Solar CSG | Standard Solar | Cologne, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Jul 2019 | Dec 2024 | Solar |
USS Eggo Solar CSG | Standard Solar | Cologne, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | May 2019 | Dec 2024 | Solar |
Corcoran CSG | Altus Power America Management, LLC | Corcoran, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.8 GWh | Dec 2018 | Dec 2024 | Solar |
B.R. Corcoran CSG | Minnesota Solar CSG 19, LLC | Corcoran, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.4 GWh | Oct 2017 | Dec 2024 | Solar |
Danielson Wind Farms LLC | BEAM US, LLC | Cosmos, MN | Midcontinent Independent System Operator, Inc. (MISO) | 46.7 GWh | Feb 2011 | Dec 2024 | Wind |
Adams Wind Generations LLC | BEAM US, LLC | Cosmos, MN | Midcontinent Independent System Operator, Inc. (MISO) | 46.5 GWh | Feb 2011 | Dec 2024 | Wind |
Cottage Grove Project CSG | DG Minnesota CSG, LLC | Cottage Grove, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.9 GWh | Sep 2018 | Dec 2024 | Solar |
LSP-Cottage Grove LP | Cottage Grove Operating Services LLC | Cottage Grove, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.3 TWh | Sep 1997 | Dec 2024 | Natural Gas |
Cottage Grove CSG, LLC | Ecoplexus, Inc | Cottage Grove, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.1 GWh | Feb 2018 | Dec 2024 | Solar |
CGSun, LLC Community Solar | Cypress Creek Renewables | Cottage Grove, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.8 GWh | Nov 2017 | Dec 2024 | Solar |
Novel Shelly Solar LLC (CSG) | REA Investments, LLC | Cottonwood, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Aug 2022 | Dec 2024 | Solar |
Nicollet Garden | Excelsior Energy Capital | Courtland, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2020 | Dec 2024 | Solar |
Nicollet Community Solar One LLC | Madison Energy Holdings LLC | Courtland, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Jun 2020 | Dec 2024 | Solar |
FastSun 8 CSG | Altus Power America Management, LLC | Courtland, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Nov 2019 | Dec 2024 | Solar |
Courtland CSG LLC | United States Solar Corporation | Courtland, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Jun 2023 | Dec 2024 | Solar |
Rengstorf Solar CSG | National Grid Renewables | Coutland, MN | Midcontinent Independent System Operator, Inc. (MISO) | 9.1 GWh | Oct 2017 | Dec 2024 | Solar |
American Crystal Sugar Crookston | American Crystal Sugar Co | Crookston, MN | Midcontinent Independent System Operator, Inc. (MISO) | 43.2 GWh | Aug 1954 | Dec 2024 | Subbituminous Coal |
USS Chariot Solar LLC | United States Solar Corporation | Danube, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Dec 2020 | Dec 2024 | Solar |
USS Mesa Solar LLC | United States Solar Corporation | Danube, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Dec 2022 | Dec 2024 | Solar |
USS Danube Solar LLC | United States Solar Corporation | Danube, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Nov 2021 | Dec 2024 | Solar |
USS Cosmo Solar LLC (CSG) | United States Solar Corporation | Danube, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Nov 2023 | Dec 2024 | Solar |
FastSun 1 CSG | Altus Power America Management, LLC | Dassel, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Nov 2019 | Dec 2023 | Solar |
Meeker Community Solar One LLC CSG | Madison Energy Holdings LLC | Dassel, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2019 | Dec 2024 | Solar |
Delano | Delano Municipal Utilities | Delano, MN | Midcontinent Independent System Operator, Inc. (MISO) | 51.9 MWh | Sep 1946 | Dec 2024 | Distillate Fuel Oil |
Detroit Lakes | City of Detroit Lakes - (MN) | Detroit Lakes, MN | Midcontinent Independent System Operator, Inc. (MISO) | 50.0 MWh | Jun 1968 | Dec 2024 | Distillate Fuel Oil |
Wapsipinicon Wind Project | EDF Renewable Asset Holdings, Inc. | Dexter, MN | Midcontinent Independent System Operator, Inc. (MISO) | 259.7 GWh | Jan 2009 | Dec 2024 | Wind |
Pleasant Valley Wind Farm | Northern States Power Co - Minnesota | Dexter, MN | Midcontinent Independent System Operator, Inc. (MISO) | 770.3 GWh | Jul 2015 | Dec 2024 | Wind |
Grand Meadow | Northern States Power Co - Minnesota | Dexter, MN | Midcontinent Independent System Operator, Inc. (MISO) | 380.3 GWh | Nov 2008 | Dec 2024 | Wind |
Pleasant Valley (MN) | Great River Energy | Dexter, MN | Midcontinent Independent System Operator, Inc. (MISO) | 85.9 GWh | Apr 2001 | Dec 2024 | Natural Gas : 99.3% Distillate Fuel Oil : 0.7% |
Dodge Center Solar | Enel Green Power NA, Inc. | Dodge Center, MN | Midcontinent Independent System Operator, Inc. (MISO) | 12.9 GWh | Nov 2016 | Dec 2024 | Solar |
Syncarpha Dodge 1 CSG | Solar Provider Group MN I LLC | Dodge Center, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Apr 2019 | Dec 2024 | Solar |
Novel Schmoll Farms Solar CSG | REA Investments, LLC | Dodge Center, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Oct 2020 | Dec 2024 | Solar |
G McNeilus Wind Farm Dodge Center | Justin McNeilus | Dodge Center, MN | Midcontinent Independent System Operator, Inc. (MISO) | 94.0 GWh | Aug 2002 | Dec 2024 | Wind |
Dodge Renewables 1 | Dodge Renewables 1, LLC | Dodge Center, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.3 GWh | Jul 2022 | Dec 2024 | Solar |
M L Hibbard | ALLETE, Inc. | Duluth, MN | Midcontinent Independent System Operator, Inc. (MISO) | 68.1 GWh | May 1949 | Mar 2025 | Wood/Wood Waste Solids : 93.4% Subbituminous Coal : 5.6% Natural Gas : 1.0% |
Jean Duluth Solar | ALLETE, Inc. | Duluth, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Nov 2022 | Dec 2024 | Solar |
Fond Du Lac | ALLETE, Inc. | Duluth, MN | Midcontinent Independent System Operator, Inc. (MISO) | 54.3 GWh | Dec 1923 | Dec 2024 | Water |
Hydra Community Solar Garden, LLC (CSG) | National Grid Renewables | Dundas, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Apr 2020 | Dec 2024 | Solar |
Thomson Reuters Data Center Bldg H | Ryan Companies US, Inc. | Eagan, MN | Midcontinent Independent System Operator, Inc. (MISO) | 41.0 MWh | Dec 2006 | Nov 2024 | Distillate Fuel Oil |
West Group Data Center | Ryan Companies US, Inc. | Eagan, MN | Midcontinent Independent System Operator, Inc. (MISO) | 53.0 MWh | Apr 2005 | Mar 2025 | Distillate Fuel Oil |
Thomson Reuters Campus Bldg A-D | Thomson Corp | Eagan, MN | Midcontinent Independent System Operator, Inc. (MISO) | 91.0 MWh | Mar 1999 | Mar 2025 | Distillate Fuel Oil |
Thomson Reuters Data Center Bldg ES101 | Ryan Companies US, Inc. | Eagan, MN | Midcontinent Independent System Operator, Inc. (MISO) | 9.0 MWh | Apr 2009 | Aug 2024 | Distillate Fuel Oil |
West Group Data Center F | Ryan Companies US, Inc. | Eagan, MN | Midcontinent Independent System Operator, Inc. (MISO) | 50.0 MWh | May 2004 | Nov 2024 | Distillate Fuel Oil |
Koppelman Sun CSG | National Grid Renewables | Eagle Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.1 GWh | Oct 2017 | Dec 2024 | Solar |
FastSun 14 CSG | Altus Power America Management, LLC | Eagle Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2019 | Dec 2024 | Solar |
American Crystal Sugar East Grand Forks | American Crystal Sugar Co | East Grand Forks, MN | Midcontinent Independent System Operator, Inc. (MISO) | 43.4 GWh | Aug 1990 | Dec 2024 | Subbituminous Coal |
SolarClub 30 (CSG) | Nautilus Solar Solutions | Eden Valley, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Dec 2023 | Dec 2024 | Solar |
Hilltop Power | Hilltop Power, LLC | Edgerton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Nov 2008 | Dec 2024 | Wind |
Johnson Solar CSG | National Grid Renewables | Edgerton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.9 GWh | Dec 2017 | Dec 2024 | Solar |
Antlia Community Solar | Antlia Community Solar | Edgerton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.7 GWh | Aug 2017 | Dec 2024 | Solar |
Elk River City of | City of Elk River | Elk River, MN | Midcontinent Independent System Operator, Inc. (MISO) | 32.0 MWh | Feb 1948 | Dec 2023 | Distillate Fuel Oil |
Elk River | Great River Energy | Elk River, MN | Midcontinent Independent System Operator, Inc. (MISO) | 33.0 GWh | Dec 1950 | Mar 2025 | Natural Gas : 97.9% Distillate Fuel Oil : 2.1% |
Fairfax | City of Fairfax - (MN) | Fairfax, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 MWh | Jul 2001 | Dec 2024 | Distillate Fuel Oil |
Fairmont Wind | Southern Minnesota Mun P Agny | Fairmont, MN | Midcontinent Independent System Operator, Inc. (MISO) | 14.6 GWh | Feb 2003 | Dec 2024 | Wind |
Fairmont (MN) | Southern Minnesota Mun P Agny | Fairmont, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.1 GWh | Dec 1974 | Dec 2024 | Natural Gas : 97.6% Distillate Fuel Oil : 2.4% |
USS Fair Park Solar LLC (CSG) | United States Solar Corporation | Faribault, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Nov 2023 | Dec 2024 | Solar |
Walcott Solar CSG | Altus Power America Management, LLC | Faribault, MN | Midcontinent Independent System Operator, Inc. (MISO) | 9.0 GWh | Jun 2020 | Dec 2024 | Solar |
Faribault Energy Park | Minnesota Municipal Power Agny | Faribault, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.1 TWh | Apr 2005 | Dec 2024 | Natural Gas |
West Faribault Solar | Enel Green Power NA, Inc. | Faribault, MN | Midcontinent Independent System Operator, Inc. (MISO) | 9.9 GWh | Nov 2016 | Dec 2024 | Solar |
Cannon Garden Solar | Cannon Garden LLC | Faribault, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Dec 2019 | Dec 2024 | Solar |
Falls Creek Garden | Falls Creek Garden LLC | Faribault, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Jan 2020 | Dec 2024 | Solar |
Straight Garden Solar | Straight Garden LLC | Faribault, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Feb 2020 | Dec 2024 | Solar |
Roberds Garden CSG | Roberds Garden LLC | Faribault, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Aug 2019 | Dec 2024 | Solar |
Marion Garden | Excelsior Energy Capital | Faribault, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Oct 2020 | Dec 2024 | Solar |
Ursa Community Solar | Ursa Community Solar | Farmington, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.9 GWh | Dec 2016 | Dec 2024 | Solar |
Farmington Holdco Solar | Farmington Holdco LLC | Farmington, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.0 GWh | Jan 2017 | Dec 2024 | Solar |
Dakota Community Solar One LLC CSG | Madison Energy Holdings LLC | Farmington, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2019 | Dec 2024 | Solar |
Empire Solar | Cypress Creek Renewables | Farmington, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.7 GWh | Nov 2016 | Dec 2024 | Solar |
Vermillion River_MN_GRE DEA-GM | SoCore Energy LLC | Farmington, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.1 GWh | Nov 2019 | Dec 2024 | Solar |
FastSun 19 CSG | Altus Power America Management, LLC | Farmington, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | May 2020 | Dec 2024 | Solar |
SunE Feely 1 CSG, LLC | Ecoplexus, Inc | Farmington, MN | Midcontinent Independent System Operator, Inc. (MISO) | 8.0 GWh | Aug 2018 | Dec 2024 | Solar |
USS Horne North Solar LLC CSG | Standard Solar | Felton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Sep 2020 | Dec 2024 | Solar |
USS JJ Clay Solar LLC CSG | Standard Solar | Felton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Sep 2020 | Dec 2024 | Solar |
USS Horne South Solar LLC CSG | Standard Solar | Felton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Sep 2020 | Dec 2024 | Solar |
Hoot Lake Solar | Otter Tail Power Co | Fergus Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 72.5 GWh | Jul 2023 | Mar 2025 | Solar |
Hoot Lake | Otter Tail Power Co | Fergus Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.3 GWh | Aug 1914 | Dec 2024 | Water |
Stevens Community Solar LLC | Madison Energy Holdings LLC | Foley, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Sep 2020 | Dec 2024 | Solar |
USS Foley Solar LLC | United States Solar Corporation | Foley, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Jun 2022 | Dec 2024 | Solar |
Novel Novak Solar LLC CSG | REA Investments, LLC | Foley, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 GWh | Jul 2021 | Dec 2024 | Solar |
Svihel Community Solar LLC CSG | Svihel Community Solar LLC | Foley, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Mar 2021 | Dec 2024 | Solar |
Caelum Community Solar | Caelum Community Solar | Foley, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.8 GWh | Sep 2017 | Dec 2024 | Solar |
Fountain | Greenbacker Renewable Energy Corporation | Fountain, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.3 GWh | Oct 2021 | Dec 2024 | Solar |