Directory of Power Plants in Illinois
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Lawrence Solar 2 LLC | SunVest Solar LLC | Harvard, IL | PJM Interconnection, LLC (PJM) | 6.0 MWh | Nov 2024 | Dec 2024 | Solar |
Ahern Community Solar I, LLC | Ahern Community Solar I, LLC | Morris, IL | PJM Interconnection, LLC (PJM) | 3.0 GWh | Apr 2023 | Dec 2024 | Solar |
SV CSG Baileyville 1 LLC | SV CSG Baileyville 1 LLC | Baileyville, IL | PJM Interconnection, LLC (PJM) | 4.2 GWh | Aug 2023 | Dec 2024 | Solar |
SV CSG South Dekalb 1 LLC | SV CSG South Dekalb 1 LLC | Dekalb, IL | PJM Interconnection, LLC (PJM) | 4.5 GWh | Sep 2023 | Dec 2024 | Solar |
SV CSG South Dekalb 2 LLC | SV CSG South Dekalb 2 LLC | Dekalb, IL | PJM Interconnection, LLC (PJM) | 4.6 GWh | Sep 2023 | Dec 2024 | Solar |
SV CSG Baileyville 2 LLC | SV CSG Baileyville 2 LLC | Baileyville, IL | PJM Interconnection, LLC (PJM) | 4.4 GWh | Aug 2023 | Dec 2024 | Solar |
Shady Oaks Wind 2 | Shady Oaks Wind 2, LLC | Compton, IL | PJM Interconnection, LLC (PJM) | 348.2 GWh | Sep 2023 | Apr 2025 | Wind |
River Ferry Solar 1 | River Ferry Solar 1, LLC | West Union, IL | PJM Interconnection, LLC (PJM) | 296.2 GWh | Nov 2023 | Apr 2025 | Solar |
N Solon Road (South) | Greenbacker Renewable Energy Corporation | Richmond, IL | PJM Interconnection, LLC (PJM) | 138.0 MWh | Oct 2024 | Dec 2024 | Solar |
Bourbonnais | Solar DG IL 5, LLC | Bourbonnais, IL | PJM Interconnection, LLC (PJM) | 2.1 GWh | Apr 2024 | Dec 2024 | Solar |
Dakota Solar 1, LLC | Generate Capital | Dakota, IL | PJM Interconnection, LLC (PJM) | 933.0 MWh | Jul 2024 | Dec 2024 | Solar |
Trenton East | Generate Capital | Trenton, IL | PJM Interconnection, LLC (PJM) | 1.7 GWh | May 2024 | Dec 2024 | Solar |
Trenton West | Generate Capital | Trenton, IL | PJM Interconnection, LLC (PJM) | 2.2 GWh | May 2024 | Dec 2024 | Solar |
Mendota Rich Dev CSG | 42nd Road Solar LLC | Mendota, IL | PJM Interconnection, LLC (PJM) | 3.9 GWh | Jan 2022 | Dec 2024 | Solar |
Whiskey Acres | Solar DG IL 4, LLC | Dekalb, IL | PJM Interconnection, LLC (PJM) | 2.9 GWh | Apr 2024 | Dec 2024 | Solar |
DG Harlem Solar | DG Harlem, LLC | Freeport, IL | PJM Interconnection, LLC (PJM) | 4.0 GWh | Apr 2024 | Dec 2024 | Solar |
Plote Somonauk | Solar DG IL 2, LLC | Somonauk, IL | PJM Interconnection, LLC (PJM) | 2.8 GWh | Apr 2024 | Dec 2024 | Solar |
Sand Prairie Solar | DG Sand Prairie, LLC | Green Valley, IL | PJM Interconnection, LLC (PJM) | 136.0 MWh | Apr 2024 | Dec 2024 | Solar |
Mt. Morris Solar CSG | DG Illinois Solar, LLC | Polo, IL | PJM Interconnection, LLC (PJM) | 2.6 GWh | Nov 2020 | Dec 2024 | Solar |
Vulcan | Vulcan Solar, LLC | Kankakee, IL | PJM Interconnection, LLC (PJM) | 3.6 GWh | Apr 2021 | Nov 2024 | Solar |
Nostrand | Nostrand Solar, LLC | Manteno Township, IL | PJM Interconnection, LLC (PJM) | 4.7 GWh | Apr 2021 | Dec 2024 | Solar |
Kish CSG | Kish Solar, LLC | Cherry Valley, IL | PJM Interconnection, LLC (PJM) | 4.0 GWh | Jul 2021 | Dec 2024 | Solar |
Peterman II | Peterman Solar II, LLC | St. Anne, IL | PJM Interconnection, LLC (PJM) | 3.5 GWh | Apr 2021 | Dec 2024 | Solar |
Blooming Grove Wind Energy Center | Invenergy Services LLC | Chenoa, IL | PJM Interconnection, LLC (PJM) | 866.1 GWh | Nov 2020 | Apr 2025 | Wind |
Charter Durabar at Woodstock | Luminace Solar Illinois 2, LLC | Woodstock, IL | PJM Interconnection, LLC (PJM) | 3.1 GWh | Dec 2020 | Dec 2024 | Solar |
Alta Farms II Wind Project, LLC | Alta Farms II Wind Project, LLC | Clinton, IL | PJM Interconnection, LLC (PJM) | 577.6 GWh | Apr 2023 | Apr 2025 | Wind |
Wolfcastle | Wolfcastle Solar, LLC | Dekalb, IL | PJM Interconnection, LLC (PJM) | 4.0 GWh | Sep 2021 | Dec 2024 | Solar |
Pine Road Solar, LLC CSG | Pine Road Solar, LLC | Sandwich, IL | PJM Interconnection, LLC (PJM) | 4.0 GWh | Mar 2021 | Dec 2024 | Solar |
Rockford CSG | Rockford Baxter Rd Holdco LLC CSG | Rockford, IL | PJM Interconnection, LLC (PJM) | 4.1 GWh | Nov 2021 | Dec 2024 | Solar |
Pontiac | Pontiac Solar, LLC | Pontiac, IL | PJM Interconnection, LLC (PJM) | 4.2 GWh | Jan 2021 | Dec 2024 | Solar |
SCS Beltway 011754 Rock Falls, LLC | Arevon Energy, Inc. | Rock Falls, IL | PJM Interconnection, LLC (PJM) | 1.7 GWh | Aug 2020 | Dec 2023 | Solar |
Cedarville Road | SRC P9 - Lena Solar, LLC | Lena, IL | PJM Interconnection, LLC (PJM) | 3.6 GWh | Nov 2020 | Dec 2023 | Solar |
SV CSG Lily Lake 2 LLC | SV CSG Lily Lake 2 LLC | Maple Park, IL | PJM Interconnection, LLC (PJM) | 3.5 GWh | Nov 2020 | Dec 2024 | Solar |
IGS East Central, LLC | IGS East Central, LLC | Joliet, IL | PJM Interconnection, LLC (PJM) | 3.3 GWh | Nov 2020 | Dec 2023 | Solar |
AES Griggs Solar, LLC | AES Griggs Solar, LLC | Grant Park, IL | PJM Interconnection, LLC (PJM) | 3.4 GWh | Nov 2020 | Dec 2024 | Solar |
Lafayette 2 - Kankakee Yonke | MN8 Energy LLC | Kankakee, IL | PJM Interconnection, LLC (PJM) | 3.6 GWh | Nov 2020 | Dec 2024 | Solar |
Lafayette 2 - McHenry Franks 2 | MN8 Energy LLC | Huntley, IL | PJM Interconnection, LLC (PJM) | 4.1 GWh | Nov 2020 | Dec 2024 | Solar |
Lafayette 2 - McHenry Franks 1 | MN8 Energy LLC | Marengo, IL | PJM Interconnection, LLC (PJM) | 3.8 GWh | Nov 2020 | Dec 2024 | Solar |
Mendota | Mendota US Solar 1 LLC | Mendota, IL | PJM Interconnection, LLC (PJM) | 3.4 GWh | Nov 2020 | Dec 2024 | Solar |
Route 76 Boone Solar 1 | Route 76 Boone Solar 1, LLC | Poplar Grove, IL | PJM Interconnection, LLC (PJM) | 4.1 GWh | Sep 2020 | Dec 2024 | Solar |
CSG Mt. Morris 2, LLC | CSG Mt. Morris 2, LLC | Mt. Morries, IL | PJM Interconnection, LLC (PJM) | 3.6 GWh | Mar 2021 | Dec 2024 | Solar |
NorthropGrummanSolar(Rolling Meadows,IL) | DG Illinois Solar, LLC | Rolling Meadows, IL | PJM Interconnection, LLC (PJM) | 1.6 GWh | Dec 2019 | Dec 2024 | Solar |
FedEx Chicago Solar Facility | DG Illinois Solar, LLC | Bedford Park, IL | PJM Interconnection, LLC (PJM) | 2.0 GWh | Sep 2020 | Dec 2024 | Solar |
SV Gardner 1 (Lutz) CSG | SV CSG Gardner 1 LLC | Gardner, IL | PJM Interconnection, LLC (PJM) | 1.1 GWh | Oct 2021 | Dec 2024 | Solar |
Pretzel CSG | Pretzel Solar, LLC | Freeport, IL | PJM Interconnection, LLC (PJM) | 4.7 GWh | Feb 2022 | Jun 2024 | Solar |
Prophet CSG | Prophet Solar, LLC | Rock Falls, IL | PJM Interconnection, LLC (PJM) | 4.8 GWh | Sep 2021 | Aug 2024 | Solar |
Gala (CSG) | Gala Solar, LLC | Lena, IL | PJM Interconnection, LLC (PJM) | 4.9 GWh | Nov 2021 | Nov 2024 | Solar |
Albertsons at Melrose Park | ESIL-AL-Melrose, LLC | Melrose Park, IL | PJM Interconnection, LLC (PJM) | 2.9 GWh | Sep 2021 | Dec 2024 | Solar |
Marengo Solar | DG Illinois Solar, LLC | Marengo, IL | PJM Interconnection, LLC (PJM) | 3.9 GWh | Nov 2020 | Dec 2024 | Solar |
SCS Plainfield 011755 Naperville, LLC | Arevon Energy, Inc. | Naperville, IL | PJM Interconnection, LLC (PJM) | 1.7 GWh | Jan 2021 | Dec 2023 | Solar |
Northeastern Illinois University Cogen | Northeastern Illinois University | Chicago, IL | PJM Interconnection, LLC (PJM) | 11.8 MWh | Jul 1995 | Dec 2024 | Natural Gas |
Invenergy Nelson Expansion LLC | Invenergy Services LLC | Rock Falls, IL | PJM Interconnection, LLC (PJM) | 717.2 GWh | Mar 2023 | Apr 2025 | Natural Gas |
Northwest Community Hospital | Northwest Community Hospital | Arlington Heights, IL | PJM Interconnection, LLC (PJM) | 492.0 MWh | May 1996 | Dec 2024 | Natural Gas |
Chicago West Side Energy Center | Energy Systems Group LLC | Chicago, IL | PJM Interconnection, LLC (PJM) | 15.2 GWh | Sep 2003 | Dec 2024 | Natural Gas |
Radfords Run Wind Farm | Big Sky Wind, LLC | Maroa, IL | PJM Interconnection, LLC (PJM) | 1.0 TWh | Nov 2017 | Apr 2025 | Wind |
Pilot Hill Wind Farm | EDF Renewable Asset Holdings, Inc. | Herscher, IL | PJM Interconnection, LLC (PJM) | 618.3 GWh | Jul 2015 | Dec 2024 | Wind |
Com Adam 1WF-1 | FPC Services Inc. | Sublette, IL | PJM Interconnection, LLC (PJM) | 7.2 GWh | Sep 2007 | Dec 2024 | Wind |
Walnut Ridge Wind Farm | BHE Renewables, LLC | Sheffield, IL | PJM Interconnection, LLC (PJM) | 728.4 GWh | Nov 2018 | Apr 2025 | Wind |
Rockford Solar Farm | Rockford Solar Partners | Rockford, IL | PJM Interconnection, LLC (PJM) | 3.5 GWh | Sep 2012 | Dec 2024 | Solar |
Museum of Science and Industry | Museum of Science and Industry | Chicago, IL | PJM Interconnection, LLC (PJM) | 34.3 MWh | Mar 2003 | Dec 2024 | Natural Gas |
Rochelle Energy Center | Frontier Operation Services | Rochelle, IL | PJM Interconnection, LLC (PJM) | 18.7 GWh | Nov 2011 | Dec 2023 | Landfill Gas |
Triton East and West Cogen | Triton College | River Grove, IL | PJM Interconnection, LLC (PJM) | 53.0 MWh | Mar 1998 | Mar 2025 | Natural Gas |
North Chicago Energy Center | Energy Systems Group LLC | North Chicago, IL | PJM Interconnection, LLC (PJM) | 36.0 GWh | Sep 2003 | Dec 2023 | Natural Gas |
Green River Wind Farm | Green River Wind Farm Phase 1, LLC | Deer Grove, IL | PJM Interconnection, LLC (PJM) | 540.6 GWh | Oct 2019 | Apr 2025 | Wind |
Loyola University Health Plant | Loyola University Health System | Maywood, IL | PJM Interconnection, LLC (PJM) | 14.8 GWh | Aug 2005 | Dec 2024 | Natural Gas |
Kishwaukee CHP Plant | Four Rivers Sanitation Authority | Rockford, IL | PJM Interconnection, LLC (PJM) | 8.7 GWh | Dec 2009 | Apr 2025 | Other Biomass Gas : 83.3% Natural Gas : 16.7% |
Adkins Energy LLC | Adkins Energy LLC | Lena, IL | PJM Interconnection, LLC (PJM) | 39.0 GWh | Jul 2002 | Dec 2024 | Natural Gas |
Shady Oaks Wind Farm | Algonquin Power Co | Compton, IL | PJM Interconnection, LLC (PJM) | 326.4 GWh | Apr 2012 | Dec 2024 | Wind |
Grand Ridge Solar Farm | Invenergy Services LLC | Marseilles, IL | PJM Interconnection, LLC (PJM) | 25.5 GWh | Jun 2012 | Apr 2025 | Solar |
Bright Stalk Wind Farm I | Lexington Chenoa Wind Farm LLC | Chenoa, IL | PJM Interconnection, LLC (PJM) | 701.6 GWh | Nov 2019 | Apr 2025 | Wind |
Bishop Hill Energy LLC | SunEdison LLC | Cambridge, IL | PJM Interconnection, LLC (PJM) | 591.6 GWh | May 2012 | Dec 2024 | Wind |
FPL Energy Illinois Wind LLC Hybrid | FPL Energy Illinois Wind LLC | Shabbona, IL | PJM Interconnection, LLC (PJM) | 642.0 GWh | Nov 2009 | Apr 2025 | Wind : 99.9% |
Minonk Wind Farm | Algonquin Power Co | Minonk, IL | PJM Interconnection, LLC (PJM) | 651.1 GWh | Oct 2012 | Dec 2024 | Wind |
Exelon Solar Chicago | Luminace Solar Chicago, LLC | Chicago, IL | PJM Interconnection, LLC (PJM) | 12.0 GWh | Nov 2009 | Apr 2025 | Solar |
Big Sky Wind LLC | Big Sky Wind LLC | Ohio, IL | PJM Interconnection, LLC (PJM) | 730.9 GWh | Jan 2011 | Dec 2024 | Wind |
Reed Road Solar | Forefront Power, LLC | Lake In The Hills, IL | PJM Interconnection, LLC (PJM) | 1.9 GWh | Jul 2020 | Dec 2023 | Solar |
Lena | Lena Solar 1 LLC | Lena, IL | PJM Interconnection, LLC (PJM) | 4.2 GWh | Apr 2021 | Dec 2024 | Solar |
Cortland | Cortland Solar 2 LLC | Cortland, IL | PJM Interconnection, LLC (PJM) | 4.3 GWh | Apr 2021 | Dec 2024 | Solar |
CED Spring Creek Solar | Bay4 Energy Services, LLC | St Anne, IL | PJM Interconnection, LLC (PJM) | 3.8 GWh | Mar 2021 | Dec 2024 | Solar |
CPV Three Rivers Energy Center | CPV Three Rivers, LLC | Morris, IL | PJM Interconnection, LLC (PJM) | 6.1 TWh | May 2023 | Apr 2025 | Natural Gas |
High Point Solar LLC | Acciona Energy USA Global, LLC | Lena, IL | PJM Interconnection, LLC (PJM) | 173.1 GWh | Oct 2023 | Apr 2025 | Solar |
Lineage Logistics Solar | DG Illinois Solar, LLC | University Park, IL | PJM Interconnection, LLC (PJM) | 2.7 GWh | Nov 2019 | Dec 2024 | Solar |
CED Hilltop Solar | Bay4 Energy Services, LLC | Rockford, IL | PJM Interconnection, LLC (PJM) | 4.4 GWh | Apr 2021 | Dec 2024 | Solar |
CED Beecher Sun Solar | Bay4 Energy Services, LLC | Beecher, IL | PJM Interconnection, LLC (PJM) | 4.0 GWh | Apr 2021 | Dec 2024 | Solar |
USS Sycamore Solar (CSG) | Standard Solar | Sycamore, IL | PJM Interconnection, LLC (PJM) | 3.7 GWh | Apr 2022 | Dec 2024 | Solar |
USS Goodrich Solar | Standard Solar | Bonfield, IL | PJM Interconnection, LLC (PJM) | 4.2 GWh | Jul 2022 | Dec 2024 | Solar |
Lone Tree Wind, LLC | Leeward Asset Management, LLC | Tiskilwa, IL | PJM Interconnection, LLC (PJM) | 294.4 GWh | Nov 2020 | Apr 2025 | Wind |
Mooseheart School Solar | Forefront Power, LLC | Mooseheart, IL | PJM Interconnection, LLC (PJM) | 3.5 GWh | Oct 2020 | Dec 2023 | Solar |
Somonauk Road Solar 1 | Somonauk Road Solar 1, LLC | Somonauk, IL | PJM Interconnection, LLC (PJM) | 4.3 GWh | Feb 2021 | Dec 2024 | Solar |
Square Barn Solar | Forefront Power, LLC | Algonquin, IL | PJM Interconnection, LLC (PJM) | 2.1 GWh | Jul 2020 | Dec 2023 | Solar |
Harmony Road Solar | Forefront Power, LLC | Huntley, IL | PJM Interconnection, LLC (PJM) | 2.9 GWh | Aug 2020 | Dec 2023 | Solar |
Midland Wind | Avangrid Power LLC | Kewane, IL | PJM Interconnection, LLC (PJM) | 347.1 GWh | Nov 2023 | Apr 2025 | Wind |
Jackson Generation, LLC | Jackson Generation, LLC | Elwood, IL | PJM Interconnection, LLC (PJM) | 7.5 TWh | Apr 2022 | Apr 2025 | Natural Gas |
Whitney Hill Wind Power LLC | Whitney Hill Wind Power LLC | Mt.Pulaski, IL | PJM Interconnection, LLC (PJM) | 155.0 GWh | Feb 2020 | Apr 2025 | Wind |
Hilltopper Wind Project | Hilltopper Wind Project, LLC | Mt. Pulaski, IL | PJM Interconnection, LLC (PJM) | 511.5 GWh | Nov 2018 | Apr 2025 | Wind |
Otter Creek Wind Farm LLC | Avangrid Power LLC | Ransom, IL | PJM Interconnection, LLC (PJM) | 461.2 GWh | Feb 2020 | Apr 2025 | Wind |
IKEA Joliet Rooftop PV System | IKEA Property Inc | Joliet, IL | PJM Interconnection, LLC (PJM) | 2.5 GWh | Nov 2017 | Dec 2024 | Solar |
Lake Forest Hospital Central Energy Plan | Northwestern Lake Forest Hospital | Lake Forest, IL | PJM Interconnection, LLC (PJM) | 313.0 MWh | May 1996 | Dec 2024 | Natural Gas |
Argonne National Laboratory CHP | Argonne National Laboratory | Lemont, IL | PJM Interconnection, LLC (PJM) | 47.9 GWh | Apr 2016 | Dec 2024 | Natural Gas |
Kelly Creek Wind Project | EDF Renewable Asset Holdings, Inc. | Cabery, IL | PJM Interconnection, LLC (PJM) | 655.0 GWh | Nov 2016 | Apr 2025 | Wind |