NorthropGrummanSolar(Rolling Meadows,IL)
600 S. Hicks Rd, Rolling Meadows, IL 60008Plant Summary Information
NorthropGrummanSolar(Rolling Meadows,IL) is ranked #174 out of 201 solar farms in Illinois in terms of total annual net electricity generation.
NorthropGrummanSolar(Rolling Meadows,IL) generated 227.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | NorthropGrummanSolar(Rolling Meadows,IL) |
|---|---|
| Utility Name | DG Illinois Solar, LLC |
| Location | Cook County, IL |
| Initial Operation Date | January 2020 |
| Last Update | Dec 2024 |
| Annual Generation | 1.6 GWh |
| Annual Consumption | 5.6 k MMBtu |
| Ranked #11,082 out of 12,613 Power Plants Nationwide | |
| Ranked #5,799 out of 6,463 Solar Power Plants Nationwide | |
| Ranked #311 out of 371 Illinois Power Plants | |
| Ranked #174 out of 201 Illinois Solar Power Plants | |
| Fuel Types | Solar |
Map of NorthropGrummanSolar(Rolling Meadows,IL)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for NorthropGrummanSolar(Rolling Meadows,IL).
Monthly Net Generation for NorthropGrummanSolar(Rolling Meadows,IL)
Monthly Plant Fuel Consumption for NorthropGrummanSolar(Rolling Meadows,IL)
NorthropGrummanSolar(Rolling Meadows,IL) Details
| Summary Information | |
|---|---|
| Plant Name | NorthropGrummanSolar(Rolling Meadows,IL) (64918) |
| Plant Address | 600 S. Hicks Rd, Rolling Meadows, IL 60008 |
| Utility | DG Illinois Solar, LLC (63505) |
| Latitude, Longitude | 42.09972, -88.03104 |
| Generation Dates on File | Jan 2021 to Dec 2024 |
| Initial Operation Date | January 2020 |
| Annual Generation | 1.6 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Commonwealth Edison Co (4110) IL |
| Grid Voltage | 0.48 kV |
| Energy Storage | No |
Generator NGCIL Details Operating January 2020
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1.1 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 1.1 MW |
| Winter Capacity | 1.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | January 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 20 |
| DC Net Capacity | 1.3 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
NorthropGrummanSolar(Rolling Meadows,IL) Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #5789 | Owens Corning Headquarters | Toledo, OH | 1.6 GWh |
| #5790 | Becker Solar CSG | St. Michael, MN | 1.6 GWh |
| #5791 | Murray Hill Solar | New Providence, NJ | 1.6 GWh |
| #5792 | Rivesville Solar | Rivesville, WV | 1.6 GWh |
| #5793 | Prawer Project CSG | Clear Lake, MN | 1.6 GWh |
| #5794 | GSPP NESV, LLC | Attleboro, MA | 1.6 GWh |
| #5795 | UASTP I | Tucson, AZ | 1.6 GWh |
| #5796 | Grinnell College | Grinnell, IA | 1.6 GWh |
| #5797 | Rock Hall | Rock Hall, MD | 1.6 GWh |
| #5798 | Bishop Ranch BR 1-X | San Ramon, CA | 1.6 GWh |
| #5800 | ISH Solar Central, LLC | Bayville, NJ | 1.6 GWh |
| #5801 | FAA NorCal TRACON | Mather AFB, CA | 1.6 GWh |
| #5802 | Alticor Inc - Solar Project | Buena Park, CA | 1.6 GWh |
| #5803 | McHenry Solar | Hampton, CT | 1.6 GWh |
| #5804 | Tahquitz High School | Hemet, CA | 1.6 GWh |
| #5805 | Town of Branford | Branford, CT | 1.6 GWh |
| #5806 | Strandness Garden | Starbuck, MN | 1.6 GWh |
| #5807 | Cornell Snyder Road Solar Array | Lansing, NY | 1.6 GWh |
| #5808 | El Dorado AR | El Dorado, AR | 1.6 GWh |
| #5809 | Becker Solar 2 CSG | St. Michael, MN | 1.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding NorthropGrummanSolar(Rolling Meadows,IL).
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Albertsons at Melrose Park | Melrose Park, IL | 2.9 GWh | 15.5 mi |
| Aurora | Aurora, IL | 498.7 GWh | 22.1 mi |
| Geneva Generation Facility | Geneva, IL | 9.2 GWh | 19 mi |
| Hoffer Plastics | South Elgin, IL | 2.7 GWh | 15.6 mi |
| INEOS Naperville Cogeneration Plant | Naperville, IL | 27.6 GWh | 20.9 mi |
| Lake Forest Hospital Central Energy Plan | Lake Forest, IL | 313.0 MWh | 13.7 mi |
| Lake Gas Recovery | Northbrook, IL | 11.0 GWh | 11.1 mi |
| Loyola University Health Plant | Maywood, IL | 14.8 GWh | 19.6 mi |
| MRP Elgin LLC | Elgin, IL | 62.2 GWh | 12.9 mi |
| MRP Rocky Road LLC | East Dundee, IL | 12.4 GWh | 10.7 mi |
| Nalco | Naperville, IL | 20.3 GWh | 22.3 mi |
| North Chicago Energy Center | North Chicago, IL | 38.2 GWh | 17 mi |
| Northeastern Illinois University Cogen | Chicago, IL | 11.8 MWh | 18 mi |
| Northwest Community Hospital | Arlington Heights, IL | 492.0 MWh | 2.9 mi |
| Reed Road Solar | Lake In The Hills, IL | 2.0 GWh | 10.8 mi |
| Settlers Hill Gas Recovery | Batavia, IL | 21.5 GWh | 20.5 mi |
| Square Barn Solar | Algonquin, IL | 2.3 GWh | 18.6 mi |
| Triton East and West Cogen | River Grove, IL | 362.0 MWh | 15.8 mi |
| Winnetka | Winnetka, IL | 2.7 GWh | 15.4 mi |
| Woodland Landfill Gas Recovery | South Elgin, IL | 13.6 GWh | 14.9 mi |