SV CSG Lily Lake 2 LLC
6N066 IL-47, Maple Park, IL 60151Plant Summary Information
SV CSG Lily Lake 2 LLC is ranked #111 out of 179 solar farms in Illinois in terms of total annual net electricity generation.
SV CSG Lily Lake 2 LLC generated 523.0 MWh during the 3-month period between September 2024 to December 2024.
Plant Name | SV CSG Lily Lake 2 LLC |
---|---|
Utility Name | SV CSG Lily Lake 2 LLC |
Location | Kane County, IL |
Initial Operation Date | December 2020 |
Last Update | Dec 2024 |
Annual Generation | 3.5 GWh |
Annual Consumption | 12.3 k MMBtu |
Ranked #8,870 out of 12,299 Power Plants Nationwide | |
Ranked #3,852 out of 6,182 Solar Power Plants Nationwide | |
Ranked #244 out of 348 Illinois Power Plants | |
Ranked #111 out of 179 Illinois Solar Power Plants | |
Fuel Types | Solar |
Map of SV CSG Lily Lake 2 LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for SV CSG Lily Lake 2 LLC.
Monthly Net Generation for SV CSG Lily Lake 2 LLC
SV CSG Lily Lake 2 LLC Details
Summary Information | |
---|---|
Plant Name | SV CSG Lily Lake 2 LLC (64330) |
Plant Address | 6N066 IL-47, Maple Park, IL 60151 |
Utility | SV CSG Lily Lake 2 LLC (63895) |
Latitude, Longitude | 41.9549, -88.47837 |
Generation Dates on File | Dec 2020 to Dec 2024 |
Initial Operation Date | December 2020 |
Annual Generation | 3.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Commonwealth Edison Co (4110) IL |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator LILY Details Operating December 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 52 |
DC Net Capacity | 2.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | Yes |
Virtual Net Metering DC Capacity | 2.9 MW |
SV CSG Lily Lake 2 LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3842 | Logan 1 Community Solar Array | Sterling, CO | 3.5 GWh |
#3843 | ELP Myer CSG | Ulster, NY | 3.5 GWh |
#3844 | Landau II Solar (Hybrid) | Kingston, NY | 3.5 GWh |
#3845 | Long John CSG | Sandwich, IL | 3.5 GWh |
#3846 | Xcel Adams 2 Community Solar Array | Watkins, CO | 3.5 GWh |
#3847 | Gary Solar | Bishopville, SC | 3.5 GWh |
#3848 | Riverview Solar | Sterling, CO | 3.5 GWh |
#3849 | Bear One | Hancock, MD | 3.5 GWh |
#3850 | ATI | Cudahy, WI | 3.5 GWh |
#3851 | POM Plant 2 | Del Rey, CA | 3.5 GWh |
#3853 | Vincent Solar | Lynchburg, SC | 3.5 GWh |
#3854 | Kale Patch Solar | Gervais, OR | 3.5 GWh |
#3855 | Ludie Brown Solar Energy Storage | Chinquapin, NC | 3.4 GWh |
#3856 | Hastings Community Solar Farm | Hastings, NE | 3.5 GWh |
#3857 | Donati Solar | Seneca Falls, NY | 3.5 GWh |
#3858 | Victor Mesa Linda C2 | Victorville, CA | 3.5 GWh |
#3859 | Syncarpha El Rito | El Rito, NM | 3.5 GWh |
#3860 | New Beginnings Solar | Kingston, NY | 3.5 GWh |
#3861 | Redwing Solar | Darlington, SC | 3.5 GWh |
#3862 | Nautilus Lindstrom Solar (CSG) | Lindstrom, MN | 3.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding SV CSG Lily Lake 2 LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aurora | Aurora, IL | 346.1 GWh | 16.2 mi |
Cortland | Cortland, IL | 4.3 GWh | 11 mi |
French Road Solar II | Burlington, IL | 4.5 GWh | 8.1 mi |
Geneva Generation Facility | Geneva, IL | 9.2 GWh | 11.5 mi |
Harmony Road Solar | Huntley, IL | 2.9 GWh | 14.5 mi |
Hoffer Plastics | South Elgin, IL | 1.8 GWh | 9.5 mi |
Lafayette 2 - McHenry Franks 2 | Huntley, IL | 4.1 GWh | 18 mi |
Mooseheart School Solar | Mooseheart, IL | 3.5 GWh | 11.6 mi |
MRP Elgin LLC | Elgin, IL | 62.2 GWh | 12.4 mi |
MRP Rocky Road LLC | East Dundee, IL | 12.4 GWh | 15.5 mi |
Nalco | Naperville, IL | 20.3 GWh | 18 mi |
Reed Road Solar | Lake In The Hills, IL | 1.9 GWh | 16.3 mi |
Settlers Hill Gas Recovery | Batavia, IL | 21.5 GWh | 11.4 mi |
Somonauk Road Solar 1 | Somonauk, IL | 4.3 GWh | 16.4 mi |
Square Barn Solar | Algonquin, IL | 2.1 GWh | 15.3 mi |
SV CSG South Dekalb 1 LLC | Dekalb, IL | 4.5 GWh | 15.6 mi |
SV CSG South Dekalb 2 LLC | Dekalb, IL | 4.6 GWh | 15.6 mi |
USS Sycamore Solar (CSG) | Sycamore, IL | 3.7 GWh | 9.7 mi |
Whiskey Acres | Dekalb, IL | 2.9 GWh | 14.2 mi |
Woodland Landfill Gas Recovery | South Elgin, IL | 13.6 GWh | 10.6 mi |