Amazon MDW6 Solar Project
1125 W Remington Blvd., Romeoville, IL 60446Plant Summary Information
Amazon MDW6 Solar Project is ranked #211 out of 309 solar farms in Illinois in terms of total annual net electricity generation.
Amazon MDW6 Solar Project generated 485.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Amazon MDW6 Solar Project |
|---|---|
| Utility Name | Solar Star Prime 5, LLC |
| Location | Will County, IL |
| Initial Operation Date | December 2020 |
| Last Update | Dec 2025 |
| Annual Generation | 3.0 GWh |
| Annual Consumption | 10.5 k MMBtu |
| Ranked #9,891 out of 13,081 Power Plants Nationwide | |
| Ranked #4,897 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #346 out of 483 Illinois Power Plants | |
| Ranked #211 out of 309 Illinois Solar Power Plants | |
| Fuel Types | Solar |
Map of Amazon MDW6 Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Amazon MDW6 Solar Project.
Monthly Net Generation for Amazon MDW6 Solar Project
Monthly Plant Fuel Consumption for Amazon MDW6 Solar Project
Amazon MDW6 Solar Project Details
| Summary Information | |
|---|---|
| Plant Name | Amazon MDW6 Solar Project (64610) |
| Plant Address | 1125 W Remington Blvd., Romeoville, IL 60446 |
| Utility | Solar Star Prime 5, LLC (64220) |
| Latitude, Longitude | 41.6721, -88.11549 |
| Generation Dates on File | Jan 2022 to Dec 2025 |
| Initial Operation Date | December 2020 |
| Annual Generation | 3.0 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 21-266-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | RFC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Commonwealth Edison Co (4110) IL |
| Grid Voltage | 0.48 kV / 0.48 kV / 0.48 kV |
| Energy Storage | No |
Generator MDW6 Details Operating December 2020
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 1.9 MW |
| Summer Capacity | 1.9 MW |
| Winter Capacity | 1.6 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 10 |
| DC Net Capacity | 3 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Amazon MDW6 Solar Project Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| ST TOTAL Strong Solar Statutory Trust | 1100 N. Market Street, Wilmington, DE 19890 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #4887 | Vulcan | Kankakee, IL | 3.0 GWh |
| #4888 | Albertsons at Melrose Park | Melrose Park, IL | 3.0 GWh |
| #4889 | Oak Leaf Solar XXVII LLC | Greely, CO | 3.0 GWh |
| #4890 | TIA Solar | Tampa, FL | 3.0 GWh |
| #4891 | Cedar Creek PV | Seaford, NY | 3.0 GWh |
| #4892 | Baltimore City B | Perryman, MD | 3.0 GWh |
| #4893 | San Luis Solar Garden | Antonito, CO | 3.0 GWh |
| #4894 | Rutan | Palmdale, CA | 3.0 GWh |
| #4895 | USG 1 | El Centro, CA | 3.0 GWh |
| #4896 | Three Bridge | Pembroke, NC | 3.0 GWh |
| #4898 | Lawrence Brook | Morristown, VT | 3.0 GWh |
| #4899 | Illinois PV Knox 3B | Galesburg, IL | 3.0 GWh |
| #4900 | Lichtenthal | Batavia, NY | 3.0 GWh |
| #4901 | APG Old Bayside | Aberdeen, MD | 3.0 GWh |
| #4902 | El Dorado County | Placerville, CA | 3.0 GWh |
| #4903 | Beulaville | Beulaville, NC | 3.0 GWh |
| #4904 | Kearsarge Gill | Gill, MA | 3.0 GWh |
| #4905 | Rose Hill Road Solar 2 - Spafford 2 | Skaneateles, NY | 3.0 GWh |
| #4906 | CO- CSU- Fort Collins II | Fort Collins, CO | 3.0 GWh |
| #4907 | BWC Swan Pond River CSG | Rehoboth, MA | 3.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Amazon MDW6 Solar Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Argonne National Laboratory CHP | Lemont, IL | 40.3 GWh | 8.1 mi |
| Aurora | Aurora, IL | 508.9 GWh | 11.4 mi |
| Elwood Energy LLC | Elwood, IL | 345.0 GWh | 16.1 mi |
| FedEx Chicago Solar Facility | Bedford Park, IL | 2.0 GWh | 17.7 mi |
| Geneva Generation Facility | Geneva, IL | 12.7 GWh | 17.1 mi |
| Greene Valley Gas Recovery | Naperville, IL | 22.5 GWh | 4.5 mi |
| IKEA Joliet Rooftop PV System | Joliet, IL | 2.9 GWh | 13.5 mi |
| IL BEDFORD PARK 7035 W 65TH ST | BEDFORD PARK, IL | 480.0 MWh | 17.8 mi |
| IL Bolingbrook 279 Marquette Dr | Bolingbrook, IL | 762.0 MWh | 2.8 mi |
| IL Joliet 1101 Cherry Hl Rd | Joliet, IL | 64.0 MWh | 12.2 mi |
| Ingredion Incorporated | Bedford Park, IL | 219.6 GWh | 16.7 mi |
| Jackson Generation, LLC | Elwood, IL | 6.5 TWh | 16.1 mi |
| Kendall County Generation Facility | Minooka, IL | 5.5 TWh | 15.2 mi |
| Lockport Powerhouse | Lockport, IL | 16.4 GWh | 7.3 mi |
| Mooseheart School Solar | Mooseheart, IL | 3.6 GWh | 15.5 mi |
| MPH Elwood | Elwood, IL | 2.4 GWh | 16.2 mi |
| Nalco | Naperville, IL | 20.3 GWh | 9.8 mi |
| SCS Plainfield 011755 Naperville, LLC | Naperville, IL | 1.7 GWh | 3.2 mi |
| Settlers Hill Gas Recovery | Batavia, IL | 22.2 GWh | 16.4 mi |
| Water Lily Solar LLC | Minooka, IL | 388.0 MWh | 15.1 mi |