Lawrence Solar 2 LLC
10001 US Highway 14, Harvard, IL 60022Plant Summary Information
Lawrence Solar 2 LLC is ranked #179 out of 179 solar farms in Illinois in terms of total annual net electricity generation.
Lawrence Solar 2 LLC generated 6.0 MWh during the 3-month period between September 2024 to December 2024.
Plant Name | Lawrence Solar 2 LLC |
---|---|
Utility Name | SunVest Solar LLC |
Location | McHenry County, IL |
Initial Operation Date | December 2024 |
Last Update | Dec 2024 |
Annual Generation | 6.0 MWh |
Annual Consumption | 20 MMBtu |
Ranked #12,242 out of 12,299 Power Plants Nationwide | |
Ranked #6,174 out of 6,182 Solar Power Plants Nationwide | |
Ranked #348 out of 348 Illinois Power Plants | |
Ranked #179 out of 179 Illinois Solar Power Plants | |
Fuel Types | Solar |
Map of Lawrence Solar 2 LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lawrence Solar 2 LLC.
Monthly Net Generation for Lawrence Solar 2 LLC
Lawrence Solar 2 LLC Details
Summary Information | |
---|---|
Plant Name | Lawrence Solar 2 LLC (67682) |
Plant Address | 10001 US Highway 14, Harvard, IL 60022 |
Utility | SunVest Solar LLC (65535) |
Latitude, Longitude | 42.48018, -88.59916 |
Generation Dates on File | Dec 2024 to Dec 2024 |
Initial Operation Date | December 2024 |
Annual Generation | 6.0 MWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Commonwealth Edison Co (4110) IL |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator LAWS2 Details Operating December 2024
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2024 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Bifacial | Yes |
Azimuth Angle | 180 |
Tilt Angle | 45 |
DC Net Capacity | 3.1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 2 MW |
Virtual Net Metering Agreement | No |
Lawrence Solar 2 LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#6162 | Silverton Solar | Silverton, OR | 12.0 MWh |
#6163 | Sheep Solar | Turner, OR | 12.0 MWh |
#6164 | Colton Solar | Molalla, OR | 12.0 MWh |
#6165 | Interstate Solar | Gervais, OR | 12.0 MWh |
#6166 | Grand Ronde Solar | Grand Ronde, OR | 12.0 MWh |
#6167 | Raffia Road Solar Project | Enfield, CT | 11.0 MWh |
#6168 | Dayton Cutoff Solar | McMinnville, OR | 10.0 MWh |
#6169 | Exeter Ten (CSG) | Exeter, RI | 10.0 MWh |
#6170 | Zena Solar | Northwest Salem, OR | 9.0 MWh |
#6171 | Valley Creek Solar | Salem, OR | 8.0 MWh |
#6172 | Nachtigall 1836-WD | Wasco, CA | 8.0 MWh |
#6173 | HCE Moran Solar, LLC | Rice, VA | 7.0 MWh |
#6175 | North Kern 3 | Bakersfield, CA | 6.0 MWh |
#6176 | Limestone CSG 1 LLC | Limestone, ME | 5.0 MWh |
#6177 | Missile Street (CSG) | Presque Island, ME | 4.0 MWh |
#6178 | 118 Echo | Mashpee, MA | 4.0 MWh |
#6179 | TX Houston 7080 Express Lane | Houston, TX | 3.0 MWh |
#6180 | Mechanic Street (CSG) | Presque Island, ME | 3.0 MWh |
#6181 | Lake Hallie | Chippewa Falls, WI | 1.0 MWh |
#6182 | CASD Solar | Carlisle, PA | 1.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Lawrence Solar 2 LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alden Road Harvard Solar 1 | Harvard, IL | 4.0 GWh | 7.5 mi |
Beloit Memorial Hospital Power Plant | Beloit, WI | 70.6 MWh | 21.4 mi |
Charter Dura-Bar | Woodstock, IL | 8.5 GWh | 16.3 mi |
Charter Durabar at Woodstock | Woodstock, IL | 3.1 GWh | 16.4 mi |
Darien Solar | Darien, WI | 60.7 GWh | 12 mi |
Harmony Road Solar | Huntley, IL | 2.9 GWh | 22.9 mi |
HQC Rock River Solar Power Gen Station | Beloit, WI | 3.0 GWh | 23.1 mi |
Kish CSG | Cherry Valley, IL | 4.0 GWh | 24.6 mi |
Lafayette 2 - McHenry Franks 1 | Marengo, IL | 3.8 GWh | 15.8 mi |
Lafayette 2 - McHenry Franks 2 | Huntley, IL | 4.1 GWh | 19.1 mi |
LaFayette Solar WI, LLC | Elkhorn, WI | 15.0 MWh | 15.7 mi |
Marengo Solar | Marengo, IL | 3.9 GWh | 15.3 mi |
N Solon Road (South) | Richmond, IL | 138.0 MWh | 16.3 mi |
Riverside Energy Center | Beloit, WI | 3.2 TWh | 23.3 mi |
Rockton | Rockton, IL | 5.7 GWh | 24.4 mi |
Route 76 Boone Solar 1 | Poplar Grove, IL | 4.1 GWh | 13.3 mi |
Silver Lake Solar WI, LLC | Salem, WI | 2.1 GWh | 21.9 mi |
Spring Prairie Solar WI, LLC | Burlington, WI | 4.0 GWh | 19 mi |
Square Barn Solar | Algonquin, IL | 2.1 GWh | 24.5 mi |
West Riverside Energy Center | Beloit, WI | 4.6 TWh | 23.6 mi |