| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Machesney Park | Solar DG IL 1 LLC | Machesney Park, IL | PJM Interconnection, LLC (PJM) | 3.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Lawrence Solar 2 LLC | SunVest Solar LLC | Harvard, IL | PJM Interconnection, LLC (PJM) | 6.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Northeastern Illinois University Cogen | Northeastern Illinois University | Chicago, IL | PJM Interconnection, LLC (PJM) | 11.8 MWh | Jul 1995 | Dec 2024 | Natural Gas |
| Presence Saint Mary of Nazareth Hospital | Presence Health | Chicago, IL | PJM Interconnection, LLC (PJM) | 21.0 MWh | Jul 1993 | Dec 2024 | Distillate Fuel Oil : 58.8% Natural Gas : 41.2% |
| 9521 US 14 SOLAR 1, LLC | Generate Capital | Harvard, IL | PJM Interconnection, LLC (PJM) | 25.0 MWh | Nov 2024 | Dec 2024 | Solar |
| State Farm | State Farm Insurance | Bloomington, IL | Midcontinent Independent System Operator, Inc. (MISO) | 26.0 MWh | Sep 1996 | Sep 2025 | Distillate Fuel Oil |
| Flora Site B | City of Flora - (IL) | Flora, IL | Midcontinent Independent System Operator, Inc. (MISO) | 32.0 MWh | Nov 2001 | Dec 2024 | Distillate Fuel Oil |
| Museum of Science and Industry | Museum of Science and Industry | Chicago, IL | PJM Interconnection, LLC (PJM) | 34.3 MWh | Mar 2003 | Dec 2024 | Natural Gas |
| Flora Site A | City of Flora - (IL) | Flora, IL | Midcontinent Independent System Operator, Inc. (MISO) | 37.0 MWh | Nov 2001 | Dec 2024 | Distillate Fuel Oil |
| Cottage Grove South Solar 1, LLC | Generate Capital | Beecher, IL | PJM Interconnection, LLC (PJM) | 43.0 MWh | Nov 2024 | Dec 2024 | Solar |
| IMEA Flora | Illinois Municipal Elec Agency | Flora, IL | Midcontinent Independent System Operator, Inc. (MISO) | 48.0 MWh | Nov 2000 | Dec 2024 | Distillate Fuel Oil |
| Goodenow Road West Solar 1, LLC | Generate Capital | Beecher, IL | PJM Interconnection, LLC (PJM) | 48.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Bushnell | City of Bushnell - (IL) | Bushnell, IL | Midcontinent Independent System Operator, Inc. (MISO) | 49.0 MWh | May 1940 | Dec 2024 | Distillate Fuel Oil |
| Farmer City | City of Farmer City - (IL) | Farmer City, IL | Midcontinent Independent System Operator, Inc. (MISO) | 50.0 MWh | Mar 1951 | Dec 2024 | Distillate Fuel Oil |
| Altamont | City of Altamont - (IL) | Altamont, IL | Midcontinent Independent System Operator, Inc. (MISO) | 56.0 MWh | Dec 2001 | Dec 2024 | Distillate Fuel Oil |
| Cottage Grove North Solar 1, LLC | Generate Capital | Beecher, IL | PJM Interconnection, LLC (PJM) | 60.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Casey City of | City of Casey - (IL) | Casey, IL | Midcontinent Independent System Operator, Inc. (MISO) | 61.0 MWh | Apr 2002 | Dec 2024 | Distillate Fuel Oil |
| Factory | City of Springfield - (IL) | Springfield, IL | Midcontinent Independent System Operator, Inc. (MISO) | 78.9 MWh | Jul 1973 | Oct 2024 | Distillate Fuel Oil |
| Clinton Solar 2b | Pivot Energy | Centralia, IL | Midcontinent Independent System Operator, Inc. (MISO) | 81.0 MWh | Oct 2024 | Dec 2024 | Solar |
| Reynolds | City of Springfield - (IL) | Springfield, IL | Midcontinent Independent System Operator, Inc. (MISO) | 81.0 MWh | Oct 1970 | Dec 2024 | Distillate Fuel Oil |
| Dakota | Cypress Creek Renewables | Rock City, IL | PJM Interconnection, LLC (PJM) | 82.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Kankakee Solar 3 | Pivot Energy | Manteno, IL | Midcontinent Independent System Operator, Inc. (MISO) | 107.0 MWh | Oct 2024 | Dec 2024 | Solar |
| Marshall (IL) | City of Marshall - (IL) | Marshall, IL | Midcontinent Independent System Operator, Inc. (MISO) | 116.0 MWh | Mar 2002 | Dec 2024 | Distillate Fuel Oil |
| Red Bud | City of Red Bud - (IL) | Red Bud, IL | Midcontinent Independent System Operator, Inc. (MISO) | 121.0 MWh | Feb 1959 | Dec 2024 | Distillate Fuel Oil |
| Freeburg | Village of Freeburg - (IL) | Freeburg, IL | Midcontinent Independent System Operator, Inc. (MISO) | 122.0 MWh | Jul 1948 | Dec 2024 | Distillate Fuel Oil |
| Sand Prairie Solar | DG Sand Prairie, LLC | Green Valley, IL | PJM Interconnection, LLC (PJM) | 136.0 MWh | Apr 2024 | Dec 2024 | Solar |
| N Solon Road (South) | Greenbacker Renewable Energy Corporation | Richmond, IL | PJM Interconnection, LLC (PJM) | 138.0 MWh | Oct 2024 | Dec 2024 | Solar |
| St. Clair Solar 3 | Pivot Energy | Washington Park, IL | Midcontinent Independent System Operator, Inc. (MISO) | 158.0 MWh | May 2024 | Dec 2024 | Solar |
| Pearl Station | Prairie Power, Inc | Pearl, IL | Midcontinent Independent System Operator, Inc. (MISO) | 161.0 MWh | May 1973 | Dec 2024 | Distillate Fuel Oil |
| Avenue A Generator Sets | City of Rock Falls - (IL) | Rock Falls, IL | Midcontinent Independent System Operator, Inc. (MISO) | 161.0 MWh | Aug 2000 | Dec 2024 | Distillate Fuel Oil |
| Highland | City of Highland | Highland, IL | Midcontinent Independent System Operator, Inc. (MISO) | 187.0 MWh | Feb 1967 | Dec 2024 | Distillate Fuel Oil |
| Rantoul | Village of Rantoul - (IL) | Rantoul, IL | Midcontinent Independent System Operator, Inc. (MISO) | 200.0 MWh | Dec 1950 | Sep 2025 | Distillate Fuel Oil |
| Walldog | Cypress Creek Renewables | Pontiac, IL | PJM Interconnection, LLC (PJM) | 210.0 MWh | Oct 2024 | Dec 2024 | Solar |
| Triton East and West Cogen | Triton College | River Grove, IL | PJM Interconnection, LLC (PJM) | 218.0 MWh | Mar 1998 | Aug 2025 | Natural Gas |
| Carmi | City of Carmi - (IL) | Carmi, IL | Midcontinent Independent System Operator, Inc. (MISO) | 230.0 MWh | Nov 1948 | Dec 2024 | Distillate Fuel Oil |
| Carlyle | City of Carlyle - (IL) | Carlyle, IL | Midcontinent Independent System Operator, Inc. (MISO) | 231.0 MWh | Jul 1964 | Dec 2024 | Distillate Fuel Oil |
| Sullivan (IL) | City of Sullivan - (IL) | Sullivan, IL | Midcontinent Independent System Operator, Inc. (MISO) | 255.0 MWh | May 1946 | Sep 2025 | Distillate Fuel Oil |
| Breese | City of Breese - (IL) | Breese, IL | Midcontinent Independent System Operator, Inc. (MISO) | 263.0 MWh | Nov 1953 | Dec 2024 | Distillate Fuel Oil |
| TAC-Distributed Energy Resource Hybrid | Ameren Illinois | Champaign, IL | Midcontinent Independent System Operator, Inc. (MISO) | 307.0 MWh | Feb 2017 | Dec 2024 | Solar : 63.8% Wind : 36.2% |
| Lake Forest Hospital Central Energy Plan | Northwestern Lake Forest Hospital | Lake Forest, IL | PJM Interconnection, LLC (PJM) | 313.0 MWh | May 1996 | Dec 2024 | Natural Gas |
| Pike County Wind Power | Illinois Rural Electric Coop | Pittsfield, IL | Midcontinent Independent System Operator, Inc. (MISO) | 355.0 MWh | Apr 2005 | Nov 2024 | Wind |
| Princeton (IL) | City of Princeton - (IL) | Princeton, IL | Midcontinent Independent System Operator, Inc. (MISO) | 434.0 MWh | Jun 1953 | Dec 2024 | Natural Gas : 99.8% |
| Waterloo | City of Waterloo - (IL) | Waterloo, IL | Midcontinent Independent System Operator, Inc. (MISO) | 491.0 MWh | May 1946 | Dec 2024 | Natural Gas : 68.9% Distillate Fuel Oil : 31.1% |
| Northwest Community Hospital | Northwest Community Hospital | Arlington Heights, IL | PJM Interconnection, LLC (PJM) | 492.0 MWh | May 1996 | Dec 2024 | Natural Gas |
| Industrial Park | City of Rock Falls - (IL) | Rock Falls, IL | Midcontinent Independent System Operator, Inc. (MISO) | 615.0 MWh | Jun 2001 | Dec 2024 | Distillate Fuel Oil |
| Breezewood | Cypress Creek Renewables | Bloomington, IL | Midcontinent Independent System Operator, Inc. (MISO) | 732.0 MWh | Aug 2024 | Dec 2024 | Solar |
| Goose Creek Energy Center | Union Electric Co - (MO) | Monticello, IL | Midcontinent Independent System Operator, Inc. (MISO) | 817.0 MWh | Apr 2003 | Nov 2024 | Natural Gas |
| Dakota Solar 1, LLC | Generate Capital | Dakota, IL | PJM Interconnection, LLC (PJM) | 933.0 MWh | Jul 2024 | Dec 2024 | Solar |
| Trinity Freeport | Generate Capital | Freeport, IL | PJM Interconnection, LLC (PJM) | 960.0 MWh | Jul 2024 | Dec 2024 | Solar |
| Marion Solar 4b LLC | Pivot Energy | Sandoval, IL | Midcontinent Independent System Operator, Inc. (MISO) | 970.0 MWh | Apr 2024 | Dec 2024 | Solar |
| Gooseberry Solar, LLC | Reactivate | Ford Heights, IL | PJM Interconnection, LLC (PJM) | 1.0 GWh | Oct 2024 | Dec 2024 | Solar |
| SV Gardner 1 (Lutz) CSG | SV CSG Gardner 1 LLC | Gardner, IL | PJM Interconnection, LLC (PJM) | 1.1 GWh | Oct 2021 | Dec 2024 | Solar |
| Cedarville (IL) | Generate Capital | Freeport, IL | Midcontinent Independent System Operator, Inc. (MISO) | 1.2 GWh | Apr 2024 | Dec 2024 | Solar |
| Pontiac 1A | Solar DG IL 3 LLC | Pontiac, IL | PJM Interconnection, LLC (PJM) | 1.3 GWh | Jul 2024 | Dec 2024 | Solar |
| Brown County Wind Turbine | Adams Electric Cooperative | Mount Sterling, IL | Midcontinent Independent System Operator, Inc. (MISO) | 1.3 GWh | Aug 2011 | Apr 2024 | Wind |
| South Main Street | Rochelle Municipal Utilities | Rochelle, IL | PJM Interconnection, LLC (PJM) | 1.3 GWh | Aug 1967 | Dec 2024 | Distillate Fuel Oil |
| North Cottage Grove Solar 1, LLC | Reactivate | Chicago Heights, IL | PJM Interconnection, LLC (PJM) | 1.4 GWh | Oct 2024 | Dec 2024 | Solar |
| Putnam Solar 1B | Pivot Energy | Granville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | May 2024 | Dec 2024 | Solar |
| Galt | Cypress Creek Renewables | Sterling, IL | PJM Interconnection, LLC (PJM) | 1.5 GWh | Aug 2024 | Dec 2024 | Solar |
| Torrence Ave Solar 1 LLC | Reactivate | Chicago Heights, IL | PJM Interconnection, LLC (PJM) | 1.6 GWh | Oct 2024 | Dec 2024 | Solar |
| NorthropGrummanSolar(Rolling Meadows,IL) | DG Illinois Solar, LLC | Rolling Meadows, IL | PJM Interconnection, LLC (PJM) | 1.6 GWh | Dec 2019 | Dec 2024 | Solar |
| North Ninth Street | Rochelle Municipal Utilities | Rochelle, IL | PJM Interconnection, LLC (PJM) | 1.6 GWh | Sep 1940 | Sep 2025 | Natural Gas : 75.2% Solar : 13.8% Distillate Fuel Oil : 11.0% |
| ESIL-PFCHICAGO 2, LLC | Madison Energy Holdings LLC | Chicago, IL | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Oct 2020 | Dec 2024 | Solar |
| Trenton East | Generate Capital | Trenton, IL | PJM Interconnection, LLC (PJM) | 1.7 GWh | May 2024 | Dec 2024 | Solar |
| SCS Plainfield 011755 Naperville, LLC | Arevon Energy, Inc. | Naperville, IL | PJM Interconnection, LLC (PJM) | 1.8 GWh | Jan 2021 | Dec 2024 | Solar |
| SCS Beltway 011754 Rock Falls, LLC | Arevon Energy, Inc. | Rock Falls, IL | PJM Interconnection, LLC (PJM) | 1.8 GWh | Aug 2020 | Dec 2024 | Solar |
| Yorktown 2 Solar | SoCore Energy LLC | Lyndon, IL | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Dec 2023 | Dec 2024 | Solar |
| Reed Road Solar | Forefront Power, LLC | Lake In The Hills, IL | PJM Interconnection, LLC (PJM) | 2.0 GWh | Jul 2020 | Dec 2024 | Solar |
| Woodlawn II (CSG) | Woodlawn Solar II, LLC | Crete, IL | PJM Interconnection, LLC (PJM) | 2.0 GWh | Nov 2021 | Dec 2024 | Solar |
| FedEx Chicago Solar Facility | DG Illinois Solar, LLC | Bedford Park, IL | PJM Interconnection, LLC (PJM) | 2.0 GWh | Sep 2020 | Dec 2024 | Solar |
| Yorktown 1 Solar | SoCore Energy LLC | Lyndon, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Dec 2023 | Dec 2024 | Solar |
| Mulberry Solar, LLC | Reactivate | Granite City, IL | PJM Interconnection, LLC (PJM) | 2.1 GWh | Oct 2024 | Dec 2024 | Solar |
| Kankakee Solar 1 | Pivot Energy | Bourbonnais, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Apr 2024 | Dec 2024 | Solar |
| Harmony Road Solar | Forefront Power, LLC | Huntley, IL | PJM Interconnection, LLC (PJM) | 2.1 GWh | Aug 2020 | Dec 2024 | Solar |
| Bourbonnais | Solar DG IL 5, LLC | Bourbonnais, IL | PJM Interconnection, LLC (PJM) | 2.1 GWh | Apr 2024 | Dec 2024 | Solar |
| Trenton West | Generate Capital | Trenton, IL | PJM Interconnection, LLC (PJM) | 2.2 GWh | May 2024 | Dec 2024 | Solar |
| Putnam Solar 1 | Pivot Energy | Granville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Apr 2024 | Dec 2024 | Solar |
| JM Huber at Quincy | Luminace Solar Illinois 2, LLC | Quincy, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Nov 2021 | Dec 2024 | Solar |
| Hoffer Plastics | Hoffer Plastics | South Elgin, IL | PJM Interconnection, LLC (PJM) | 2.2 GWh | Mar 1992 | Sep 2025 | Natural Gas |
| All World Solar Facility | All World Machinery Supply, Inc. | Roscoe, IL | PJM Interconnection, LLC (PJM) | 2.2 GWh | Oct 2023 | Dec 2024 | Solar |
| Square Barn Solar | Forefront Power, LLC | Algonquin, IL | PJM Interconnection, LLC (PJM) | 2.3 GWh | Jul 2020 | Dec 2024 | Solar |
| ESIL-PFCHICAGO 3, LLC | Madison Energy Holdings LLC | Chicago, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.4 GWh | Jul 2020 | Dec 2024 | Solar |
| Whiteside Solar 1 CSG | Whiteside Solar 1, LLC | Fulton, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.4 GWh | Nov 2020 | Dec 2024 | Solar |
| The GSI Group LLC at Assumption | Luminace Solar Illinois 2, LLC | Assumption, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.4 GWh | Dec 2020 | Dec 2024 | Solar |
| John A Logan College Solar | REA Investments, LLC | Carterville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.4 GWh | Nov 2019 | Dec 2024 | Solar |
| SCS American Bottoms 009885 Sauget, LLC | Arevon Energy, Inc. | Sauget, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.5 GWh | Jul 2020 | Dec 2024 | Solar |
| IKEA Joliet Rooftop PV System | IKEA Property Inc | Joliet, IL | PJM Interconnection, LLC (PJM) | 2.5 GWh | Nov 2017 | Dec 2024 | Solar |
| Galesburg Solar Array | AEP Onsite Partners, LLC | Oquawka, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.5 GWh | Feb 2020 | Dec 2024 | Solar |
| Amazon MDW6 Solar Project | Solar Star Prime 5, LLC | Romeoville, IL | PJM Interconnection, LLC (PJM) | 2.6 GWh | Nov 2020 | Dec 2024 | Solar |
| Mt. Morris Solar CSG | DG Illinois Solar, LLC | Polo, IL | PJM Interconnection, LLC (PJM) | 2.6 GWh | Nov 2020 | Dec 2024 | Solar |
| Winnetka | Village of Winnetka - (IL) | Winnetka, IL | PJM Interconnection, LLC (PJM) | 2.7 GWh | Dec 1947 | Dec 2024 | Natural Gas : 91.7% Distillate Fuel Oil : 8.3% |
| Lineage Logistics Solar | DG Illinois Solar, LLC | University Park, IL | PJM Interconnection, LLC (PJM) | 2.7 GWh | Nov 2019 | Dec 2024 | Solar |
| Monee Solar 1, LLC | Reactivate | Peotone, IL | PJM Interconnection, LLC (PJM) | 2.8 GWh | Oct 2024 | Dec 2024 | Solar |
| CED Champaign Solar LLC | Consolidated Edison Development Inc. | Champaign, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.8 GWh | Jun 2020 | Dec 2024 | Solar |
| Plote Somonauk | Solar DG IL 2, LLC | Somonauk, IL | PJM Interconnection, LLC (PJM) | 2.8 GWh | Apr 2024 | Dec 2024 | Solar |
| Whiskey Acres | Solar DG IL 4, LLC | Dekalb, IL | PJM Interconnection, LLC (PJM) | 2.9 GWh | Apr 2024 | Dec 2024 | Solar |
| SCS West Fairchild 011958 Danville, LLC | Arevon Energy, Inc. | Danville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.9 GWh | Jun 2021 | Dec 2024 | Solar |
| Morgan Solar 1b CSG | Morgan Solar 1b LLC | Meredosia, IL | Midcontinent Independent System Operator, Inc. (MISO) | 2.9 GWh | Jul 2021 | Dec 2024 | Solar |
| Albertsons at Melrose Park | ESIL-AL-Melrose, LLC | Melrose Park, IL | PJM Interconnection, LLC (PJM) | 2.9 GWh | Sep 2021 | Dec 2024 | Solar |
| DPC York | SoCore Energy LLC | Thomson, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.0 GWh | Jul 2019 | Dec 2024 | Solar |