| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| SV CSG Baileyville 2 LLC | SV CSG Baileyville 2 LLC | Baileyville, IL | PJM Interconnection, LLC (PJM) | 4.4 GWh | Aug 2023 | Dec 2024 | Solar |
| Cottage Grove South Solar 1, LLC | Generate Capital | Beecher, IL | PJM Interconnection, LLC (PJM) | 43.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Cottage Grove North Solar 1, LLC | Generate Capital | Beecher, IL | PJM Interconnection, LLC (PJM) | 60.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Trinity Freeport | Generate Capital | Freeport, IL | PJM Interconnection, LLC (PJM) | 960.0 MWh | Jul 2024 | Dec 2024 | Solar |
| Trenton West | Generate Capital | Trenton, IL | PJM Interconnection, LLC (PJM) | 2.2 GWh | May 2024 | Dec 2024 | Solar |
| Trenton East | Generate Capital | Trenton, IL | PJM Interconnection, LLC (PJM) | 1.7 GWh | May 2024 | Dec 2024 | Solar |
| Goodenow Road West Solar 1, LLC | Generate Capital | Beecher, IL | PJM Interconnection, LLC (PJM) | 48.0 MWh | Nov 2024 | Dec 2024 | Solar |
| 9521 US 14 SOLAR 1, LLC | Generate Capital | Harvard, IL | PJM Interconnection, LLC (PJM) | 25.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Dakota Solar 1, LLC | Generate Capital | Dakota, IL | PJM Interconnection, LLC (PJM) | 933.0 MWh | Jul 2024 | Dec 2024 | Solar |
| SV CSG South Dekalb 2 LLC | SV CSG South Dekalb 2 LLC | Dekalb, IL | PJM Interconnection, LLC (PJM) | 4.6 GWh | Sep 2023 | Dec 2024 | Solar |
| CED Hilltop Solar | Bay4 Energy Services, LLC | Rockford, IL | PJM Interconnection, LLC (PJM) | 4.4 GWh | Apr 2021 | Dec 2024 | Solar |
| N Solon Road (South) | Greenbacker Renewable Energy Corporation | Richmond, IL | PJM Interconnection, LLC (PJM) | 138.0 MWh | Oct 2024 | Dec 2024 | Solar |
| Shady Oaks Wind 2 | Shady Oaks Wind 2, LLC | Compton, IL | PJM Interconnection, LLC (PJM) | 338.1 GWh | Sep 2023 | Sep 2025 | Wind |
| North Cottage Grove Solar 1, LLC | Reactivate | Chicago Heights, IL | PJM Interconnection, LLC (PJM) | 1.4 GWh | Oct 2024 | Dec 2024 | Solar |
| Torrence Ave Solar 1 LLC | Reactivate | Chicago Heights, IL | PJM Interconnection, LLC (PJM) | 1.6 GWh | Oct 2024 | Dec 2024 | Solar |
| Mulberry Solar, LLC | Reactivate | Granite City, IL | PJM Interconnection, LLC (PJM) | 2.1 GWh | Oct 2024 | Dec 2024 | Solar |
| Monee Solar 1, LLC | Reactivate | Peotone, IL | PJM Interconnection, LLC (PJM) | 2.8 GWh | Oct 2024 | Dec 2024 | Solar |
| Gooseberry Solar, LLC | Reactivate | Ford Heights, IL | PJM Interconnection, LLC (PJM) | 1.0 GWh | Oct 2024 | Dec 2024 | Solar |
| River Ferry Solar 1 | River Ferry Solar 1, LLC | West Union, IL | PJM Interconnection, LLC (PJM) | 303.7 GWh | Nov 2023 | Sep 2025 | Solar |
| All World Solar Facility | All World Machinery Supply, Inc. | Roscoe, IL | PJM Interconnection, LLC (PJM) | 2.2 GWh | Oct 2023 | Dec 2024 | Solar |
| Mt. Morris Solar CSG | DG Illinois Solar, LLC | Polo, IL | PJM Interconnection, LLC (PJM) | 2.6 GWh | Nov 2020 | Dec 2024 | Solar |
| NorthropGrummanSolar(Rolling Meadows,IL) | DG Illinois Solar, LLC | Rolling Meadows, IL | PJM Interconnection, LLC (PJM) | 1.6 GWh | Dec 2019 | Dec 2024 | Solar |
| FedEx Chicago Solar Facility | DG Illinois Solar, LLC | Bedford Park, IL | PJM Interconnection, LLC (PJM) | 2.0 GWh | Sep 2020 | Dec 2024 | Solar |
| SV Gardner 1 (Lutz) CSG | SV CSG Gardner 1 LLC | Gardner, IL | PJM Interconnection, LLC (PJM) | 1.1 GWh | Oct 2021 | Dec 2024 | Solar |
| Pretzel CSG | Pretzel Solar, LLC | Freeport, IL | PJM Interconnection, LLC (PJM) | 4.7 GWh | Feb 2022 | Jun 2024 | Solar |
| Prophet CSG | Prophet Solar, LLC | Rock Falls, IL | PJM Interconnection, LLC (PJM) | 4.8 GWh | Sep 2021 | Aug 2024 | Solar |
| Gala (CSG) | Gala Solar, LLC | Lena, IL | PJM Interconnection, LLC (PJM) | 4.9 GWh | Nov 2021 | Nov 2024 | Solar |
| Albertsons at Melrose Park | ESIL-AL-Melrose, LLC | Melrose Park, IL | PJM Interconnection, LLC (PJM) | 2.9 GWh | Sep 2021 | Dec 2024 | Solar |
| SCS Plainfield 011755 Naperville, LLC | Arevon Energy, Inc. | Naperville, IL | PJM Interconnection, LLC (PJM) | 1.8 GWh | Jan 2021 | Dec 2024 | Solar |
| Mendota Rich Dev CSG | 42nd Road Solar LLC | Mendota, IL | PJM Interconnection, LLC (PJM) | 3.9 GWh | Jan 2022 | Dec 2024 | Solar |
| Keeversville Solar CSG | Keeversville Solar Energy Center LLC | Braidwood, IL | PJM Interconnection, LLC (PJM) | 3.3 GWh | Jun 2021 | Dec 2024 | Solar |
| Plote Somonauk | Solar DG IL 2, LLC | Somonauk, IL | PJM Interconnection, LLC (PJM) | 2.8 GWh | Apr 2024 | Dec 2024 | Solar |
| Ahern Community Solar I, LLC | Ahern Community Solar I, LLC | Morris, IL | PJM Interconnection, LLC (PJM) | 3.0 GWh | Apr 2023 | Dec 2024 | Solar |
| DG Harlem Solar | DG Harlem, LLC | Freeport, IL | PJM Interconnection, LLC (PJM) | 4.0 GWh | Apr 2024 | Dec 2024 | Solar |
| Whiskey Acres | Solar DG IL 4, LLC | Dekalb, IL | PJM Interconnection, LLC (PJM) | 2.9 GWh | Apr 2024 | Dec 2024 | Solar |
| Lawrence Solar 2 LLC | SunVest Solar LLC | Harvard, IL | PJM Interconnection, LLC (PJM) | 6.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Walldog | Cypress Creek Renewables | Pontiac, IL | PJM Interconnection, LLC (PJM) | 210.0 MWh | Oct 2024 | Dec 2024 | Solar |
| Galt | Cypress Creek Renewables | Sterling, IL | PJM Interconnection, LLC (PJM) | 1.5 GWh | Aug 2024 | Dec 2024 | Solar |
| SV CSG Baileyville 1 LLC | SV CSG Baileyville 1 LLC | Baileyville, IL | PJM Interconnection, LLC (PJM) | 4.2 GWh | Aug 2023 | Dec 2024 | Solar |
| SV CSG South Dekalb 1 LLC | SV CSG South Dekalb 1 LLC | Dekalb, IL | PJM Interconnection, LLC (PJM) | 4.5 GWh | Sep 2023 | Dec 2024 | Solar |
| Beecher Gas Recovery | Will County Energy LLC | Beecher, IL | PJM Interconnection, LLC (PJM) | 4.7 GWh | May 2006 | Dec 2024 | Landfill Gas |
| Morris Cogeneration LLC | Morris Cogeneration LLC | Morris, IL | PJM Interconnection, LLC (PJM) | 598.9 GWh | Oct 1998 | Sep 2025 | Natural Gas |
| Lincoln Generating Facility | Lincoln Generating Facility LLC | Manhattan, IL | PJM Interconnection, LLC (PJM) | 9.5 GWh | May 2000 | Oct 2024 | Natural Gas |
| Lee Energy Facility | Lee County Generating Station | Dixon, IL | PJM Interconnection, LLC (PJM) | 116.8 GWh | Apr 2001 | Dec 2024 | Natural Gas |
| NRG Rockford I | Rockford Generation LLC | Rockford, IL | PJM Interconnection, LLC (PJM) | 80.3 GWh | May 2000 | Dec 2024 | Natural Gas |
| University Park South | University Park Energy LLC | University Park, IL | PJM Interconnection, LLC (PJM) | 70.0 GWh | May 2001 | Dec 2024 | Natural Gas |
| Crete Energy Venture LLC | Crete Energy Venture LLC | Crete, IL | PJM Interconnection, LLC (PJM) | 56.5 GWh | Apr 2002 | Nov 2024 | Natural Gas |
| Aurora | Aurora Generation LLC | Aurora, IL | PJM Interconnection, LLC (PJM) | 459.7 GWh | Apr 2001 | Sep 2025 | Natural Gas |
| Calumet Energy Team LLC | IPA Operations Inc - Calumet | Chicago, IL | PJM Interconnection, LLC (PJM) | 5.8 GWh | May 2002 | Aug 2024 | Natural Gas |
| Zion Energy Center | Zion Energy LLC | Zion, IL | PJM Interconnection, LLC (PJM) | 363.6 GWh | May 2002 | Dec 2024 | Natural Gas : 99.7% |
| MRP Elgin LLC | Lincoln Operating Services, LLC | Elgin, IL | PJM Interconnection, LLC (PJM) | 62.2 GWh | Aug 2002 | Dec 2024 | Natural Gas |
| University Park North | LSP University Park LLC | University Park, IL | PJM Interconnection, LLC (PJM) | 123.7 GWh | May 2002 | Dec 2024 | Natural Gas |
| NRG Rockford II Energy Center | Rockford Generation LLC | Rockford, IL | PJM Interconnection, LLC (PJM) | 64.6 GWh | May 2002 | Dec 2024 | Natural Gas |
| Mendota Hills, LLC | Leeward Asset Management, LLC | Paw Paw, IL | PJM Interconnection, LLC (PJM) | 263.7 GWh | Oct 2003 | Dec 2024 | Wind |
| Crescent Ridge | Leeward Asset Management, LLC | Tiskilwa, IL | PJM Interconnection, LLC (PJM) | 216.5 GWh | Nov 2005 | Dec 2024 | Wind |
| High Trail Wind Farm LLC | High Trail Wind Farm LLC | Ellsworth, IL | PJM Interconnection, LLC (PJM) | 513.7 GWh | Feb 2007 | Sep 2025 | Wind |
| Elwood Energy LLC | Elwood Energy LLC | Elwood, IL | PJM Interconnection, LLC (PJM) | 213.5 GWh | Jun 1999 | Sep 2025 | Natural Gas |
| GSG LLC | Leeward Asset Management, LLC | West Brooklyn, IL | PJM Interconnection, LLC (PJM) | 298.7 GWh | May 2007 | Dec 2024 | Wind |
| Geneva Generation Facility | City of Geneva- (IL) | Geneva, IL | PJM Interconnection, LLC (PJM) | 9.2 GWh | May 2005 | Dec 2024 | Natural Gas |
| Old Trail Wind Farm | Old Trail Wind Farm LLC | Ellsworth, IL | PJM Interconnection, LLC (PJM) | 565.4 GWh | Nov 2007 | Sep 2025 | Wind |
| Providence Heights Wind LLC | Avangrid Power LLC | Tiskilwa, IL | PJM Interconnection, LLC (PJM) | 141.2 GWh | Jul 2008 | Dec 2024 | Wind |
| Camp Grove Wind Farm | Orion Energy Group LLC | Wyoming, IL | PJM Interconnection, LLC (PJM) | 406.4 GWh | Nov 2007 | Dec 2024 | Wind |
| EcoGrove Wind LLC | Acciona Wind Energy USA LLC | Lena, IL | PJM Interconnection, LLC (PJM) | 258.0 GWh | Jun 2009 | Dec 2024 | Wind |
| Grand Ridge Wind Energy Center | Invenergy Services LLC | Marseilles, IL | PJM Interconnection, LLC (PJM) | 485.5 GWh | Sep 2008 | Dec 2024 | Wind |
| Streator Cayuga Ridge South | Avangrid Power LLC | Odell, IL | PJM Interconnection, LLC (PJM) | 673.4 GWh | Feb 2010 | Sep 2025 | Wind |
| Blackstone Wind Farm LLC | Blackstone Wind Farm LLC | Ransom, IL | PJM Interconnection, LLC (PJM) | 250.1 GWh | Sep 2009 | Dec 2024 | Wind |
| Blackstone Wind Farm II LLC | Blackstone Wind Farm II LLC | Dwight, IL | PJM Interconnection, LLC (PJM) | 506.9 GWh | Jul 2010 | Dec 2024 | Wind |
| Big Sky Wind LLC | Big Sky Wind LLC | Ohio, IL | PJM Interconnection, LLC (PJM) | 730.9 GWh | Jan 2011 | Dec 2024 | Wind |
| Exelon Solar Chicago | Luminace Solar Chicago, LLC | Chicago, IL | PJM Interconnection, LLC (PJM) | 13.0 GWh | Nov 2009 | Sep 2025 | Solar |
| Minonk Wind Farm | Algonquin Power Co | Minonk, IL | PJM Interconnection, LLC (PJM) | 651.1 GWh | Oct 2012 | Dec 2024 | Wind |
| FPL Energy Illinois Wind LLC Hybrid | FPL Energy Illinois Wind LLC | Shabbona, IL | PJM Interconnection, LLC (PJM) | 619.8 GWh | Nov 2009 | Sep 2025 | Wind |
| Bishop Hill Energy LLC | SunEdison LLC | Cambridge, IL | PJM Interconnection, LLC (PJM) | 591.6 GWh | May 2012 | Dec 2024 | Wind |
| ExxonMobil Oil Joliet Refinery | ExxonMobil Oil Corp | Channahon, IL | PJM Interconnection, LLC (PJM) | 186.1 GWh | Apr 1986 | Sep 2025 | Other Gas |
| Dresden Generating Station | Constellation Nuclear | Morris, IL | PJM Interconnection, LLC (PJM) | 15.2 TWh | Jul 1970 | Sep 2025 | Nuclear |
| Kincaid Generation LLC | Dynegy Kincaid Generation | Kincaid, IL | PJM Interconnection, LLC (PJM) | 2.6 TWh | May 1967 | Sep 2025 | Subbituminous Coal : 99.5% Natural Gas : 0.5% |
| Powerton | Midwest Generations EME LLC | Pekin, IL | PJM Interconnection, LLC (PJM) | 2.9 TWh | Aug 1972 | Sep 2025 | Subbituminous Coal : 99.7% |
| Quad Cities Generating Station | Constellation Nuclear | Cordova, IL | PJM Interconnection, LLC (PJM) | 15.2 TWh | Nov 1972 | Sep 2025 | Nuclear |
| North Ninth Street | Rochelle Municipal Utilities | Rochelle, IL | PJM Interconnection, LLC (PJM) | 1.6 GWh | Sep 1940 | Sep 2025 | Natural Gas : 75.2% Solar : 13.8% Distillate Fuel Oil : 11.0% |
| South Main Street | Rochelle Municipal Utilities | Rochelle, IL | PJM Interconnection, LLC (PJM) | 1.3 GWh | Aug 1967 | Dec 2024 | Distillate Fuel Oil |
| Winnetka | Village of Winnetka - (IL) | Winnetka, IL | PJM Interconnection, LLC (PJM) | 2.7 GWh | Dec 1947 | Dec 2024 | Natural Gas : 91.7% Distillate Fuel Oil : 8.3% |
| Braidwood Generation Station | Constellation Nuclear | Braceville, IL | PJM Interconnection, LLC (PJM) | 20.2 TWh | Jun 1988 | Sep 2025 | Nuclear |
| Byron Generating Station | Constellation Nuclear | Byron, IL | PJM Interconnection, LLC (PJM) | 19.8 TWh | Aug 1985 | Sep 2025 | Nuclear |
| LaSalle Generating Station | Constellation Nuclear | Marseilles, IL | PJM Interconnection, LLC (PJM) | 19.5 TWh | Dec 1983 | Sep 2025 | Nuclear |
| Lockport Powerhouse | Metro Wtr Recl Dist Grtr Chi | Lockport, IL | PJM Interconnection, LLC (PJM) | 10.1 GWh | Jan 1999 | Sep 2025 | Water |
| Nalco | Nalco Co | Naperville, IL | PJM Interconnection, LLC (PJM) | 20.3 GWh | Oct 1985 | Dec 2024 | Natural Gas |
| Settlers Hill Gas Recovery | WM Illinois Renewable Energy LLC | Batavia, IL | PJM Interconnection, LLC (PJM) | 21.5 GWh | Sep 1988 | Dec 2024 | Landfill Gas |
| CID Gas Recovery | WM Illinois Renewable Energy LLC | Calumet City, IL | PJM Interconnection, LLC (PJM) | 14.6 GWh | Feb 1989 | Dec 2024 | Landfill Gas |
| Lake Gas Recovery | WM Illinois Renewable Energy LLC | Northbrook, IL | PJM Interconnection, LLC (PJM) | 11.0 GWh | Jul 1993 | Dec 2024 | Landfill Gas |
| Bright Stalk Wind Farm I | Lexington Chenoa Wind Farm LLC | Chenoa, IL | PJM Interconnection, LLC (PJM) | 729.8 GWh | Nov 2019 | Sep 2025 | Wind |
| INEOS Naperville Cogeneration Plant | INEOS US Chemicals Company - Naperville Campus | Naperville, IL | PJM Interconnection, LLC (PJM) | 27.6 GWh | Nov 1990 | Dec 2023 | Natural Gas |
| University of Illinois Cogen Facility | University of Illinois | Chicago, IL | PJM Interconnection, LLC (PJM) | 112.3 GWh | Mar 1993 | Sep 2025 | Natural Gas : 99.9% |
| Hoffer Plastics | Hoffer Plastics | South Elgin, IL | PJM Interconnection, LLC (PJM) | 2.2 GWh | Mar 1992 | Sep 2025 | Natural Gas |
| Charter Dura-Bar | Wells Manufacturing Co | Woodstock, IL | PJM Interconnection, LLC (PJM) | 8.7 GWh | Mar 1992 | Sep 2025 | Natural Gas |
| Ingredion Incorporated | Ingredion Inc - Illinois | Bedford Park, IL | PJM Interconnection, LLC (PJM) | 219.6 GWh | Apr 1991 | Dec 2024 | Natural Gas |
| Woodland Landfill Gas Recovery | WM Illinois Renewable Energy LLC | South Elgin, IL | PJM Interconnection, LLC (PJM) | 13.6 GWh | Apr 1992 | Dec 2024 | Landfill Gas |
| CSL Behring LLC | CSL Behring LLC | Bradley, IL | PJM Interconnection, LLC (PJM) | 9.1 GWh | Apr 1993 | Dec 2024 | Natural Gas |
| Presence Saint Mary of Nazareth Hospital | Presence Health | Chicago, IL | PJM Interconnection, LLC (PJM) | 21.0 MWh | Jul 1993 | Dec 2024 | Distillate Fuel Oil : 58.8% Natural Gas : 41.2% |
| Dixon Hydroelectric Dam | Eagle Creek Renewable Energy, LLC | Dixon, IL | PJM Interconnection, LLC (PJM) | 11.3 GWh | May 1925 | Dec 2024 | Water |
| Greene Valley Gas Recovery | WM Illinois Renewable Energy LLC | Naperville, IL | PJM Interconnection, LLC (PJM) | 22.5 GWh | Apr 1996 | Dec 2024 | Landfill Gas |
| Livingston Generating Facility | Hoosier Energy R E C, Inc | Pontiac, IL | PJM Interconnection, LLC (PJM) | 63.5 GWh | Nov 1999 | Dec 2024 | Landfill Gas |