Pinckneyville
4646 White Walnut Road, Pinckneyville, IL 62274Plant Summary Information
Pinckneyville is ranked #36 out of 75 natural gas power plants in Illinois in terms of total annual net electricity generation.
Pinckneyville is comprised of 8 generators and generated 4.2 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Pinckneyville |
---|---|
Utility Name | Union Electric Co - (MO) |
Location | Perry County, IL |
Initial Operation Date | June 2000 |
Last Update | Dec 2022 |
Annual Generation | 31.1 GWh |
Annual Consumption | 356.5 k MMBtu |
Ranked #4,420 out of 11,455 Power Plants Nationwide | |
Ranked #1,282 out of 2,284 Natural Gas Power Plants Nationwide | |
Ranked #112 out of 314 Illinois Power Plants | |
Ranked #36 out of 75 Illinois Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Pinckneyville
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pinckneyville.
Monthly Net Generation for Pinckneyville
Pinckneyville Details
Summary Information | |
---|---|
Plant Name | Pinckneyville (55202) |
Plant Address | 4646 White Walnut Road Pinckneyville, IL 62274 |
Utility | Union Electric Co - (MO) (19436) |
Latitude, Longitude | 38.1114, -89.3467 |
Generation Dates on File | Jan 2001 to Dec 2022 |
Initial Operation Date | June 2000 |
Annual Generation | 31.1 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Ameren Illinois Company (56697) IL |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | NATURAL GAS PL CO OF AMERICA |
Natural Gas Storage | No |
Generator 1 Details Operating June 2000
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AMMO.PNKYCTG1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | AMMO.PNKYCTG1 |
Nameplate Capacity | 45 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 44 MW |
Winter Capacity | 46 MW |
Minimum Load | 29 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2000 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 2 Details Operating June 2000
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AMMO.PNKYCTG2 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | AMMO.PNKYCTG2 |
Nameplate Capacity | 45 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 44 MW |
Winter Capacity | 46 MW |
Minimum Load | 29 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2000 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 3 Details Operating June 2000
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AMMO.PNKYCTG3 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | AMMO.PNKYCTG3 |
Nameplate Capacity | 45 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 44 MW |
Winter Capacity | 46 MW |
Minimum Load | 29 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2000 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 4 Details Operating June 2000
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AMMO.PNKYCTG4 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | AMMO.PNKYCTG4 |
Nameplate Capacity | 45 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 44 MW |
Winter Capacity | 46 MW |
Minimum Load | 29 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2000 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 5 Details Operating June 2001
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AMMO.PNKYCTG5 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | AMMO.PNKYCTG5 |
Nameplate Capacity | 50 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 35 MW |
Winter Capacity | 44 MW |
Minimum Load | 30 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2001 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 6 Details Operating June 2001
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AMMO.PNKYCTG6 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | AMMO.PNKYCTG6 |
Nameplate Capacity | 50 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 35 MW |
Winter Capacity | 44 MW |
Minimum Load | 30 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2001 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 7 Details Operating June 2001
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AMMO.PNKYCTG7 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | AMMO.PNKYCTG7 |
Nameplate Capacity | 50 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 35 MW |
Winter Capacity | 44 MW |
Minimum Load | 30 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2001 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 8 Details Operating July 2001
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AMMO.PNKYCTG8 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | AMMO.PNKYCTG8 |
Nameplate Capacity | 50 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 35 MW |
Winter Capacity | 44 MW |
Minimum Load | 30 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2001 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Pinckneyville Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1272 | Saint Agnes Medical Center | Fresno, CA | 31.7 GWh |
#1273 | San Jose Cogeneration | San Jose, CA | 31.6 GWh |
#1274 | Grayson | Glendale, CA | 31.5 GWh |
#1275 | Grossmont Hospital | La Mesa, CA | 31.5 GWh |
#1276 | Hutchinson Energy Center | Hutchinson, KS | 38.6 GWh |
#1277 | Packaging Corp. of America Jackson Mill | Jackson, AL | 103.0 GWh |
#1278 | Santa Clara Cogen | Santa Clara, CA | 31.3 GWh |
#1279 | Hutchinson Plant #1 | Hutchinson, MN | 31.2 GWh |
#1280 | Somerset Plant | Skowhegan, ME | 525.3 GWh |
#1281 | Elk Hills Cogen | Tupman, CA | 31.2 GWh |
#1283 | Central Michigan University | Mt. Pleasant, MI | 30.9 GWh |
#1284 | Lange Gas Turbines | Rapid City, SD | 30.8 GWh |
#1285 | College of New Jersey | Ewing, NJ | 30.8 GWh |
#1286 | OBP Cogen | New York, NY | 30.7 GWh |
#1287 | Hibbing | Hibbing, MN | 46.7 GWh |
#1288 | Yuba City Cogen Partners | Yuba City, CA | 30.6 GWh |
#1289 | ECP Uptown Campus | Pittsburgh, PA | 30.5 GWh |
#1290 | CIP II/AR Bridgewater Holdings - NJCOE | Bridgewater, NJ | 30.6 GWh |
#1291 | Mira Loma Peaker | Ontario, CA | 30.2 GWh |
#1292 | Hampton Facility | Hampton, NH | 30.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Pinckneyville.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
AES Belleville Solar LLC | Belleville, IL | 15.0 GWh | 44.5 mi |
Baldwin Energy Complex | Baldwin, IL | 6.4 TWh | 28.3 mi |
Breese | Breese, IL | 448.5 MWh | 35.6 mi |
Carlyle | Carlyle, IL | 420.6 MWh | 34.5 mi |
Clendenin A Community Solar, LLC CSG | Herrin, IL | 4.5 GWh | 26.7 mi |
Clinton Solar 4 LLC CSG | Carlyle, IL | 4.8 GWh | 33.7 mi |
Freeburg | Freeburg, IL | 139.2 MWh | 37.7 mi |
Hurricane Creek CSG | Carterville, IL | 1.5 GWh | 27.2 mi |
John A Logan College Solar | Carterville, IL | 2.7 GWh | 28.7 mi |
Kern A Community Solar, LLC CSG | West Frankfort, IL | 4.5 GWh | 26.1 mi |
Lukuc B Community Solar LLC CSG | Herrin, IL | 4.3 GWh | 25.2 mi |
Marion | Marion, IL | 774.7 GWh | 40.2 mi |
Marlow Solar, LLC CSG | Bluford, IL | 4.2 GWh | 35 mi |
McLeansboro | McLeansboro, IL | 34.8 MWh | 43.8 mi |
Prairie State Generating Station | Marissa, IL | 13.5 TWh | 20.9 mi |
Prairie State Solar Project | Swanwick Township, IL | 250.4 GWh | 14.3 mi |
Red Bud | Red Bud, IL | 153.4 MWh | 36.2 mi |
Sandoval | Centralia, IL | 4.5 GWh | 34.7 mi |
SIUC | Carbondale, IL | 6.9 GWh | 28.5 mi |
Waterloo | Waterloo, IL | 681.3 MWh | 46.7 mi |