University of Illinois Cogen Facility | University of Illinois | Chicago, IL | 104 GWh | Mar 1993 | Feb 2025 |
Natural Gas : 99.9%
|
Delaware City Plant | Delaware City Refining Company LLC | Delaware City, DE | 1 TWh | Sep 1956 | Feb 2025 |
Natural Gas : 79.7%
Other Gas : 20.3%
|
Grand Ridge Solar Farm | Invenergy Services LLC | Marseilles, IL | 25 GWh | Jun 2012 | Feb 2025 |
Solar
|
International Paper Franklin Mill | International Paper | Franklin, VA | 271 GWh | Oct 1977 | Feb 2025 |
Black Liquor : 82.5%
Natural Gas : 17.5%
|
Whitney Hill Wind Power LLC | Whitney Hill Wind Power LLC | Mt.Pulaski, IL | 162 GWh | Feb 2020 | Feb 2025 |
Wind
|
East Campus Utility Plant | University of Cincinnati | Cincinnati, OH | 156 MWh | Jun 2006 | Feb 2025 |
Distillate Fuel Oil
|
Celanese Acetate LLC | Celanese Acetate LLC | Narrows, VA | 173 GWh | Dec 1941 | Feb 2025 |
Natural Gas
|
Great Falls Hydro Project | Eagle Creek Renewable Energy, LLC | Paterson, NJ | 3 GWh | Nov 1985 | Feb 2025 |
Water
|
Invenergy Nelson Expansion LLC | Invenergy Services LLC | Rock Falls, IL | 673 GWh | Mar 2023 | Feb 2025 |
Natural Gas
|
Doswell Energy Center | Doswell Ltd Partnership | Ashland, VA | 6 TWh | Oct 1991 | Feb 2025 |
Natural Gas : 99.2%
Distillate Fuel Oil : 0.8%
|
Union County Resource Recovery | Covanta Union Operations LLC | Rahway, NJ | 304 GWh | Jan 1994 | Feb 2025 |
Non-biogenic Municipal Solid Waste : 55.0%
Biogenic Municipal Solid Waste : 45.0%
|
Covington Facility | WestRock Corp | Covington, VA | 741 GWh | Dec 1950 | Feb 2025 |
Black Liquor : 42.6%
Natural Gas : 26.3%
Wood/Wood Waste Solids : 16.5%
Bituminous Coal : 13.9%
Residual Fuel Oil : 0.6%
|
Clean Energy Future-Lordstown, LLC | Clean Energy Future-Lordstown, LLC | Lordstown, OH | 6 TWh | Sep 2018 | Feb 2025 |
Natural Gas
|
Hecate Energy Highland LLC | Hecate Energy Highland LLC | Buford, OH | 419 GWh | - | Feb 2025 |
Solar
|
Northampton Generating Company LP | EIF Northampton GP, LLC | Northampton, PA | 422 GWh | Jul 1995 | Feb 2025 |
Waste/Other Coal : 97.2%
Waste/Other Oil : 1.7%
Tire-derived Fuels : 1.0%
|
Wheelabrator Gloucester LP | Wheelabrator Environmental Systems | Westville, NJ | 79 GWh | Dec 1989 | Feb 2025 |
Non-biogenic Municipal Solid Waste : 55.0%
Biogenic Municipal Solid Waste : 45.0%
|
Lancaster County Resource Recovery | Covanta Lancaster Inc | Brainbridge, PA | 186 GWh | Nov 1990 | Feb 2025 |
Non-biogenic Municipal Solid Waste : 54.8%
Biogenic Municipal Solid Waste : 44.9%
|
Hopewell Mill | RockTenn-Hopewell | Hopewell, VA | 282 GWh | Nov 1980 | Feb 2025 |
Black Liquor : 44.5%
Wood/Wood Waste Solids : 32.3%
Natural Gas : 22.5%
Bituminous Coal : 0.6%
|
Skipjack Solar Center | AES Distributed Energy | Wayside, VA | 338 GWh | Apr 2022 | Feb 2025 |
Solar
|
Hummel Station LLC | Hummel Station, LLC | Shamokin Dam, PA | 8 TWh | May 2018 | Feb 2025 |
Natural Gas
|
Lackawanna Energy Center | Invenergy Services LLC | Jessup, PA | 10 TWh | Feb 2018 | Feb 2025 |
Natural Gas
|
South Field Energy | South Field Energy, LLC | Wellsville, OH | 9 TWh | Jul 2021 | Feb 2025 |
Natural Gas
|
Covanta Alexandria/Arlington Energy | Covanta Alexandria/Arlington | Alexandria, VA | 143 GWh | Sep 1987 | Feb 2025 |
Non-biogenic Municipal Solid Waste : 55.0%
Biogenic Municipal Solid Waste : 45.0%
|
Covanta Fairfax Energy | Covanta Fairfax Inc | Lorton, VA | 628 GWh | Feb 1990 | Feb 2025 |
Non-biogenic Municipal Solid Waste : 54.0%
Biogenic Municipal Solid Waste : 44.2%
Natural Gas : 1.9%
|
Montgomery County Resource Recovery | Covanta Montgomery, Inc. | Dickerson, MD | 296 GWh | Apr 1995 | Feb 2025 |
Non-biogenic Municipal Solid Waste : 54.5%
Biogenic Municipal Solid Waste : 44.6%
Natural Gas : 0.9%
|
Paulsboro Refinery | Paulsboro Refining Company - LLC | Paulsboro, NJ | 344 GWh | Jul 1982 | Feb 2025 |
Natural Gas : 59.3%
Other Gas : 40.7%
|
ExxonMobil Oil Joliet Refinery | ExxonMobil Oil Corp | Channahon, IL | 178 GWh | Apr 1986 | Feb 2025 |
Other Gas
|
Ringer Hill Wind Farm, LLC | Ringer Hill Wind LLC | Salisbury, PA | 98 GWh | Nov 2016 | Feb 2025 |
Wind
|
Molson Coors Shenandoah Brewery | Molson Coors Shenandoah Brewery | Elkton, VA | 6 GWh | May 2012 | Feb 2025 |
Other Biomass Gas
|
Desper Solar | Dominion Renewable Energy | Louisa, VA | 123 GWh | Nov 2021 | Feb 2025 |
Solar
|
Axiall Natrium Plant | Westlake Chemical Natrium Plant | New Martinsville, WV | 699 GWh | Dec 1942 | Feb 2025 |
Natural Gas : 94.3%
Other Gas : 5.7%
|
Tennessee Eastman Operations | Eastman Chemical Co-TN Ops | Kingsport, TN | 1 TWh | Aug 1936 | Feb 2025 |
Natural Gas : 58.6%
Bituminous Coal : 39.6%
Other Gas : 1.0%
Sludge Waste : 0.7%
|
Georgia-Pacific Big Island | GP Big Island LLC | Big Island, VA | 54 GWh | May 1920 | Feb 2025 |
Natural Gas : 61.3%
Wood/Wood Waste Solids : 25.8%
Black Liquor : 8.8%
Other Biomass Solids : 3.8%
|
Newark Energy Center | Hartree Partners LP | Newark, NJ | 3 TWh | Aug 2015 | Feb 2025 |
Natural Gas
|
Rutgers Biomedical and Health Cogen | Rutgers, The State University of NJ | Newark, NJ | 37 GWh | Jun 1989 | Feb 2025 |
Natural Gas
|
Keystone Solar | Altus Power America Management, LLC | Quarryville, PA | 8 GWh | Aug 2012 | Feb 2025 |
Solar
|
University of Notre Dame | University of Notre Dame | Notre Dame, IN | 93 GWh | Jun 1952 | Feb 2025 |
Natural Gas : 99.4%
Distillate Fuel Oil : 0.6%
|
Meherrin Solar | Dominion Renewable Energy | Skippers, VA | 118 GWh | Aug 2022 | Feb 2025 |
Solar
|
Bunge North America East LLC | Bunge North America East LLC | Decatur, IN | 10 GWh | Nov 1950 | Feb 2025 |
Natural Gas
|
Archbald Power Station | PEI Power Corp | Archbald, PA | 96 GWh | Aug 1988 | Feb 2025 |
Natural Gas : 72.9%
Landfill Gas : 27.1%
|
Piney Creek Solar | Dominion Energy Inc. | Clover, VA | 79 GWh | Jul 2023 | Feb 2025 |
Solar
|
KapStone Kraft Paper Corp | Westrock Kraft Paper, LLC | Roanoke Rapids, NC | 190 GWh | Dec 1965 | Feb 2025 |
Black Liquor : 64.8%
Bituminous Coal : 15.5%
Natural Gas : 11.3%
Wood/Wood Waste Solids : 8.0%
|
York County Resource Recovery | York County Solid W & R Auth | York, PA | 237 GWh | Oct 1989 | Feb 2025 |
Non-biogenic Municipal Solid Waste : 53.5%
Biogenic Municipal Solid Waste : 43.7%
Natural Gas : 2.8%
|
Keys Energy Center | PSEG Keys Energy Center, LLC | Brandywine, MD | 5 TWh | Jun 2018 | Feb 2025 |
Natural Gas
|
Vicinity Energy Trenton, L.P. | Vicinity Energy Trenton, L.P. | Trenton, NJ | 145 MWh | Nov 1983 | Feb 2025 |
Natural Gas : 95.0%
Distillate Fuel Oil : 5.0%
|
Fern Solar LLC | BayWa r.e. Solar Projects LLC | Battleboro, NC | 175 GWh | Nov 2020 | Feb 2025 |
Solar
|
Lockport Powerhouse | Metro Wtr Recl Dist Grtr Chi | Lockport, IL | 3 GWh | Jan 1999 | Feb 2025 |
Water
|
Grasshopper Solar | Dominion Energy Inc. | Chase City, VA | 125 GWh | Aug 2020 | Feb 2025 |
Solar
|
Sadler Solar | Dominion Energy Inc. | Emporia, VA | 176 GWh | Jun 2021 | Feb 2025 |
Solar
|
Summit Street Power Plant | Kent State University | Kent, OH | 33 GWh | Dec 2002 | Feb 2025 |
Natural Gas
|
Covanta Delaware Valley | Covanta Delaware Valley LP | Chester, PA | 540 GWh | Mar 1991 | Feb 2025 |
Non-biogenic Municipal Solid Waste : 55.0%
Biogenic Municipal Solid Waste : 45.0%
|
Eastern Correctional Institute | Maryland Environmental Service | Westover, MD | 3 GWh | Jul 1987 | Feb 2025 |
Natural Gas : 99.6%
|
French Paper Hydro | French Paper Co | Niles, MI | 3 GWh | Dec 1920 | Feb 2025 |
Water
|
Covanta Essex Company | Covanta Essex Company | Newark, NJ | 448 GWh | Oct 1990 | Feb 2025 |
Non-biogenic Municipal Solid Waste : 55.0%
Biogenic Municipal Solid Waste : 45.0%
|
Hopewell Cogeneration | Luminant Generation Company LLC | Hopewell, VA | 2 TWh | Dec 1989 | Feb 2025 |
Natural Gas : 99.4%
Distillate Fuel Oil : 0.6%
|
Wheelabrator Baltimore Refuse | Wheelabrator Environmental Systems | Baltimore, MD | 318 GWh | Oct 1984 | Feb 2025 |
Non-biogenic Municipal Solid Waste : 55.0%
Biogenic Municipal Solid Waste : 45.0%
|
Kishwaukee CHP Plant | Four Rivers Sanitation Authority | Rockford, IL | 8 GWh | Dec 2009 | Feb 2025 |
Other Biomass Gas : 82.9%
Natural Gas : 17.1%
|
Camden Resource Recovery Facility | Covanta Camden Energy Recovery Center | Camden, NJ | 171 GWh | Feb 1991 | Feb 2025 |
Non-biogenic Municipal Solid Waste : 55.0%
Biogenic Municipal Solid Waste : 45.0%
|
Cleveland Works | Cleveland Cliffs | Cleveland, OH | 343 GWh | Dec 1949 | Feb 2025 |
Blast Furnace Gas : 60.1%
Natural Gas : 39.9%
|
West Campus Steam Plant | Penn State University | University Park, PA | 38 GWh | Dec 1937 | Feb 2025 |
Natural Gas
|
Pixelle Specialty Solutions LLC - Chillicothe Facility | Pixelle Specialty Solution, LLC | Chillicothe, OH | 204 GWh | Jan 1952 | Feb 2025 |
Black Liquor : 42.3%
Natural Gas : 39.9%
Wood/Wood Waste Solids : 14.5%
Tire-derived Fuels : 2.1%
Distillate Fuel Oil : 1.2%
|
Merck Rahway Power Plant | Merck & Co Inc | Rahway, NJ | 32 GWh | Dec 1976 | Feb 2025 |
Natural Gas : 99.5%
|
Jackson Generation, LLC | Jackson Generation, LLC | Elwood, IL | 7 TWh | Apr 2022 | Feb 2025 |
Natural Gas
|
East Campus Steam Plant | Penn State University | University Park, PA | 46 GWh | May 2011 | Feb 2025 |
Natural Gas : 99.9%
|
Central Utility Plant at White Oak | GSA Metropolitan Service Center | Silver Spring, MD | 70 GWh | Oct 2003 | Feb 2025 |
Natural Gas : 99.4%
Distillate Fuel Oil : 0.6%
|
Timber Road IV | Paulding Wind Farm IV LLC | Payne, OH | 400 GWh | Dec 2019 | Feb 2025 |
Wind
|
Indiana University of Pennsylvania | Indiana University of Penn | Indiana, PA | 12 GWh | Feb 1988 | Feb 2025 |
Natural Gas : 96.6%
Distillate Fuel Oil : 3.4%
|
Hoffmann LaRoche | PB Nutclif Master, LLC | Nutley, NJ | 50 GWh | Apr 2004 | Feb 2025 |
Natural Gas : 99.5%
|
CIP II/AR Bridgewater Holdings - NJCOE | COE Bridgewater LLC c/o Thor Equities, LLC | Bridgewater, NJ | 26 GWh | Oct 2002 | Feb 2025 |
Natural Gas : 99.2%
Distillate Fuel Oil : 0.8%
|
Harrisburg Facility | Harrisburg Authority | Harrisburg, PA | 87 GWh | Mar 2006 | Feb 2025 |
Non-biogenic Municipal Solid Waste : 52.9%
Biogenic Municipal Solid Waste : 43.3%
Natural Gas : 3.9%
|
Dickinson Solar | Dickinson Solar, LLC | Carlisle, PA | 5 GWh | Nov 2016 | Feb 2025 |
Solar
|
Clover | Virginia Electric & Power Co | Clover, VA | 963 GWh | Sep 1995 | Feb 2025 |
Bituminous Coal : 99.6%
|
Surry | Virginia Electric & Power Co | Surry, VA | 13 TWh | Nov 1972 | Feb 2025 |
Nuclear
|
Water Strider Solar | Consolidated Edison Development Inc. | Nathalie, VA | 173 GWh | Feb 2021 | Feb 2025 |
Solar
|
Possum Point | Virginia Electric & Power Co | Dumfries, VA | 2 TWh | May 1955 | Feb 2025 |
Natural Gas : 99.7%
|
CPV Three Rivers Energy Center | CPV Three Rivers, LLC | Morris, IL | 6 TWh | May 2023 | Feb 2025 |
Natural Gas
|
Cardinal | Cardinal Operating Company | Brillant, OH | 9 TWh | Jan 1967 | Feb 2025 |
Bituminous Coal : 99.6%
|
Princeton University Cogeneration | Trustees of Princeton University | Princeton, NJ | 64 GWh | Sep 1996 | Feb 2025 |
Natural Gas : 64.8%
Solar : 33.9%
Distillate Fuel Oil : 1.3%
|
Shelby Solar Array | AEP Onsite Partners, LLC | Shelby, OH | 2 GWh | Nov 2019 | Feb 2025 |
Solar
|
Bergen Generating Station | Bergen Generating Station | Ridgefield, NJ | 2 TWh | Apr 1959 | Feb 2025 |
Natural Gas : 97.0%
Kerosene : 3.0%
|
Miami Fort | Luminant Miami Fort | North Bend, OH | 6 TWh | Oct 1960 | Feb 2025 |
Bituminous Coal : 99.8%
|
Carroll County Energy | Carroll County Energy LLC | Carrollton, OH | 5 TWh | Nov 2017 | Feb 2025 |
Natural Gas
|
Blue Ridge Generating | North American Biofuels, LLC | Irvine, KY | 4 GWh | Oct 2013 | Feb 2025 |
Landfill Gas
|
John E Amos | Appalachian Power Co | St Albans, WV | 10 TWh | Aug 1971 | Feb 2025 |
Bituminous Coal : 99.6%
|
FirstEnergy Fort Martin Power Station | Monongahela Power Co | Maidsville, WV | 4 TWh | Sep 1967 | Feb 2025 |
Bituminous Coal : 99.4%
Distillate Fuel Oil : 0.6%
|
Oregon Clean Energy Center | Oregon Clean Energy Center | Oregon, OH | 6 TWh | Jun 2017 | Feb 2025 |
Natural Gas
|
Bluegrass Solar | Bluegrass Solar, LLC | Church Hill, MD | 158 GWh | Sep 2022 | Feb 2025 |
Solar
|
TalenEnergy Montour | TalenEnergy Montour LLC | Washingtonville, PA | 3 TWh | Jan 1971 | Feb 2025 |
Natural Gas : 99.2%
Bituminous Coal : 0.7%
|
FirstEnergy Harrison Power Station | Monongahela Power Co | Haywood, WV | 11 TWh | Nov 1972 | Feb 2025 |
Refined Coal : 99.8%
|
Peach Bottom | Constellation Nuclear | Delta, PA | 22 TWh | Jun 1974 | Feb 2025 |
Nuclear
|
Mitchell (WV) | Kentucky Power Co | Captina, WV | 4 TWh | Apr 1971 | Feb 2025 |
Bituminous Coal : 99.2%
Distillate Fuel Oil : 0.8%
|
Mt Storm | Virginia Electric & Power Co | Mount Storm, WV | 4 TWh | Aug 1965 | Feb 2025 |
Bituminous Coal : 99.7%
|
TalenEnergy Martins Creek | TalenEnergy Martins Creek LLC | Bangor, PA | 3 TWh | May 1971 | Feb 2025 |
Natural Gas : 98.4%
Residual Fuel Oil : 1.6%
|
Conowingo | Constellation Power, Inc | Darlington, MD | 2 TWh | Feb 1928 | Feb 2025 |
Water
|
Otter Creek Solar | Dominion Energy Inc. | Chase City, VA | 83 GWh | Sep 2023 | Feb 2025 |
Solar
|
Donald C Cook | Indiana Michigan Power Co | Bridgman, MI | 18 TWh | Jul 1975 | Feb 2025 |
Nuclear
|
Pleasants Power Station | Omnis Pleasants, LLC | Willow Island, WV | 710 GWh | Mar 1979 | Feb 2025 |
Bituminous Coal : 97.1%
Natural Gas : 2.9%
|
Brunner Island | Brunner Island LLC | York Haven, PA | 4 TWh | Apr 1961 | Feb 2025 |
Natural Gas : 69.6%
Bituminous Coal : 30.4%
|
Calvert Cliffs Nuclear Power Plant | Constellation Nuclear | Lusby, MD | 15 TWh | Apr 1975 | Feb 2025 |
Nuclear
|
East Bend | Duke Energy Kentucky Inc | Union, KY | 2 TWh | Feb 1981 | Feb 2025 |
Bituminous Coal : 99.5%
|