Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Choctaw Nation Solar Farm | Oklahoma Gas & Electric Co | Calera, OK | Southwest Power Pool (SWPP) | 9.0 GWh | Jun 2020 | Dec 2025 | Solar |
| Coram Energy LLC (4.5MW) | Nextera Energy Resources | Tehachapi, CA | California Independent System Operator (CISO) | 9.0 GWh | Nov 1985 | Dec 2025 | Wind |
| Flint Creek Hydroelectric LLC | Hydrodynamics Inc | Philipsburg, MT | NorthWestern Corporation (NWMT) | 9.0 GWh | Feb 2013 | Dec 2025 | Water |
| Black Butte | City of Santa Clara - (CA) | Orland, CA | California Independent System Operator (CISO) | 9.0 GWh | Aug 1988 | Dec 2025 | Water |
| Laurinburg Farm | Strata Manager, LLC | Laurinburg, NC | Duke Energy Carolinas (DUK) | 9.0 GWh | Nov 2015 | Dec 2025 | Solar |
| Novel OYA of Osakis CSG | NRG MN Community LLC | Osakis, MN | Midcontinent Independent System Operator, Inc. (MISO) | 9.0 GWh | Jun 2018 | Dec 2025 | Solar |
| CST001 McCarthy Fuel Cell | 2016 ESA Project Company, LLC | Milpitas, CA | California Independent System Operator (CISO) | 9.0 GWh | Dec 2018 | Dec 2025 | Natural Gas |
| BD Solar Ellsworth LLC | BD Solar Hancock North LLC | Augusta, ME | ISO New England (ISNE) | 9.0 GWh | May 2022 | Dec 2025 | Solar |
| Pate Farm | Strata Manager, LLC | Red Springs, NC | Duke Energy Progress East (CPLE) | 9.0 GWh | Oct 2013 | Dec 2025 | Solar |
| Langdon Solar Farm, LLC | Strata Manager, LLC | Four Oaks, NC | Duke Energy Carolinas (DUK) | 9.0 GWh | Nov 2015 | Dec 2025 | Solar |
| Garnet Solar Generation Station I LLC | Garnet Solar Generation Station I LLC | Palm Springs, CA | California Independent System Operator (CISO) | 9.0 GWh | Nov 2014 | Dec 2024 | Solar |
| Tate Solar | USF Essex Lessor, LLC | Castalia, NC | Duke Energy Progress East (CPLE) | 9.0 GWh | Jul 2020 | Dec 2025 | Solar |
| Siler 421 Farm, LLC | Heelstone Energy Holdings, LLC | Siler City, NC | Duke Energy Progress East (CPLE) | 9.0 GWh | Nov 2016 | Dec 2025 | Solar |
| Hew Fulton Farm, LLC | Strata Manager, LLC | Laurinburg, NC | Duke Energy Carolinas (DUK) | 9.0 GWh | Nov 2015 | Dec 2025 | Solar |
| Stout Farm | Strata Manager, LLC | Mebane, NC | Duke Energy Carolinas (DUK) | 9.0 GWh | Nov 2014 | Dec 2025 | Solar |
| Aspen Solar, LLC | SRE Utility Solar 1, LLC | Rose Hill, NC | Duke Energy Carolinas (DUK) | 9.0 GWh | Oct 2015 | Dec 2025 | Solar |
| Washington Airport Solar LLC | Deriva Energy | Washington, NC | Duke Energy Progress East (CPLE) | 9.0 GWh | Jan 2014 | Dec 2025 | Solar |
| Harmony Solar (ME) | Maine DG Solar Harmony, LLC | Harmony, ME | ISO New England (ISNE) | 9.0 GWh | Jul 2022 | Dec 2025 | Solar |
| Edenton Solar | Edenton Solar | Edenton, NC | PJM Interconnection, LLC (PJM) | 9.0 GWh | Nov 2019 | Dec 2025 | Solar |
| G&S Wantage Solar LLC | G&S Operations LLC | Wantage, NJ | PJM Interconnection, LLC (PJM) | 9.0 GWh | Dec 2013 | Dec 2025 | Solar |
| Towaoc | U S Bureau of Reclamation | Cortez, CO | Western Area Power Administration - Rocky Mountain Region (WACM) | 9.0 GWh | Apr 1993 | Dec 2025 | Water |
| Drop 1 | Imperial Irrigation District | Holtville, CA | Imperial Irrigation District (IID) | 9.0 GWh | Sep 1984 | Dec 2025 | Water |
| Bailey Farm LLC | Strata Manager, LLC | Bailey, NC | Duke Energy Progress East (CPLE) | 9.0 GWh | Oct 2013 | Dec 2025 | Solar |
| Ramona 2 | MN8 Energy LLC | Ramona, CA | California Independent System Operator (CISO) | 9.0 GWh | Nov 2013 | Dec 2025 | Solar |
| Royal Solar | Cypress Creek Renewables | Godwin, NC | Duke Energy Progress East (CPLE) | 9.0 GWh | Jul 2015 | Dec 2025 | Solar |
| RE Ajo 1 LLC | Deriva Energy | Ajo, AZ | Arizona Public Service Company (AZPS) | 9.0 GWh | Jul 2011 | Dec 2025 | Solar |
| County Route 11B | Generate Capital | Mooers Forks, NY | New York Independent System Operator (NYIS) | 9.0 GWh | Apr 2024 | Dec 2025 | Solar |
| Alpha Value Solar | SunStrong Management | Hertford, NC | PJM Interconnection, LLC (PJM) | 9.0 GWh | Nov 2019 | Dec 2025 | Solar |
| Big Sky Dairy Digester | DF-AP #1 LLC | Gooding, ID | Idaho Power Company (IPCO) | 9.0 GWh | Dec 2008 | Dec 2025 | Other Biomass Gas |
| Tiburon Holdings | Heelstone Energy Holdings, LLC | Advance, NC | Duke Energy Carolinas (DUK) | 9.0 GWh | Nov 2016 | Dec 2025 | Solar |
| Waco Farm | Strata Manager, LLC | Waco, NC | Duke Energy Carolinas (DUK) | 9.0 GWh | Oct 2013 | Dec 2025 | Solar |
| Daniel Farm LLC | Strata Manager, LLC | Mocksville, NC | Duke Energy Carolinas (DUK) | 9.0 GWh | Feb 2014 | Dec 2025 | Solar |
| Caledonia Solar WI, LLC | Wisconsin Electric Power Co | Caledonia, WI | Midcontinent Independent System Operator, Inc. (MISO) | 9.0 GWh | Mar 2025 | Dec 2025 | Solar |
| Crockett Farm | Strata Manager, LLC | Kinston, NC | Duke Energy Progress East (CPLE) | 9.0 GWh | Nov 2014 | Dec 2025 | Solar |
| Moorings Farm 2, LLC | Dominion Renewable Energy | LaGrange, NC | Duke Energy Progress East (CPLE) | 9.0 GWh | Aug 2017 | Dec 2025 | Solar |
| Two Lines Farm | Strata Manager, LLC | Hickory, NC | Duke Energy Carolinas (DUK) | 9.1 GWh | Feb 2013 | Dec 2025 | Solar |
| Dunkleman Solar | Generate Capital | Cattaraugus, NY | New York Independent System Operator (NYIS) | 9.1 GWh | Dec 2022 | Dec 2025 | Solar |
| Davis Lane Solar, LLC | Heelstone Energy Holdings, LLC | Edenton, NC | PJM Interconnection, LLC (PJM) | 9.1 GWh | Nov 2017 | Dec 2025 | Solar |
| Ruler Solar Partners (CSG) | Ruler Solar Partners, LLC | Oswegatchie, NY | New York Independent System Operator (NYIS) | 9.1 GWh | Jul 2023 | Dec 2025 | Solar |
| SIUC | Southern Illinois University Carbondale | Carbondale, IL | Midcontinent Independent System Operator, Inc. (MISO) | 9.1 GWh | May 1998 | Aug 2026 | Bituminous Coal |
| Mine Falls Generating Station | City of Nashua - (NH) | Nashua, NH | ISO New England (ISNE) | 9.1 GWh | Nov 1985 | Dec 2025 | Water |
| Intel Folsom Phase 3 | Tesla Inc. | Folsom, CA | Balancing Authority of Northern California (BANC) | 9.1 GWh | Mar 2016 | Dec 2025 | Solar |
| Midwest Power Partners LLC (Pirolo) | SRC Partnership 15 LLC | Williamson, IL | PJM Interconnection, LLC (PJM) | 9.1 GWh | Jan 2025 | Dec 2025 | Solar |
| Sadiebrook NC Solar | SunStrong Management | Clarkton, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | May 2018 | Dec 2025 | Solar |
| IGS KSBD | Altus Power America Management, LLC | Highland, CA | California Independent System Operator (CISO) | 9.1 GWh | Feb 2022 | Dec 2025 | Solar |
| Galt | SunStrong Management, LLC | Sterling, IL | PJM Interconnection, LLC (PJM) | 9.1 GWh | Aug 2024 | Dec 2025 | Solar |
| Southington Solar One | DG Connecticut III, LLC | Southington, CT | ISO New England (ISNE) | 9.1 GWh | Jan 2022 | Dec 2025 | Solar |
| Orange Grove Peaking Facility | Orange Grove Energy LP | Pala, CA | California Independent System Operator (CISO) | 9.1 GWh | May 2010 | Dec 2025 | Natural Gas |
| Saxon Falls | Northern States Power Co - Minnesota | Saxon, WI | Midcontinent Independent System Operator, Inc. (MISO) | 9.1 GWh | Dec 1912 | Dec 2025 | Water |
| Brick City Solar | SunStrong Management | Wallace, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Nov 2021 | Dec 2025 | Solar |
| Pecan PV1 | Strata Manager, LLC | Cordova, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Nov 2014 | Dec 2025 | Solar |
| Spicewood Solar Farm LLC | Strata Manager, LLC | Eagle Springs, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Jun 2014 | Dec 2025 | Solar |
| Keen Farm | Strata Manager, LLC | Four Oaks, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Nov 2015 | Dec 2025 | Solar |
| Border Hybrid Energy Center | CalPeak Power, LLC | San Diego, CA | California Independent System Operator (CISO) | 9.1 GWh | Oct 2001 | Dec 2025 | Natural Gas |
| Balsam | SRE Utility Solar 1, LLC | Sanford, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Nov 2015 | Dec 2025 | Solar |
| ABD Farms | Cypress Creek Renewables | Asheboro, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Nov 2017 | Dec 2025 | Solar |
| Mt Olive Farm 2 | Strata Manager, LLC | Mt Olive, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Apr 2013 | Dec 2025 | Solar |
| ILR Landfill | ILR Landfill | Edison, NJ | PJM Interconnection, LLC (PJM) | 9.1 GWh | Nov 2016 | Dec 2025 | Solar |
| Soluga Farms 2 LLC | Strata Manager, LLC | Clarkton, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Aug 2014 | Dec 2025 | Solar |
| Spencer (NY) | Generate Capital | Candor, NY | New York Independent System Operator (NYIS) | 9.1 GWh | Dec 2023 | Dec 2025 | Solar |
| Louisiana Sugar Refining | Louisiana Sugar Refining LLC | Gramercy, LA | Midcontinent Independent System Operator, Inc. (MISO) | 9.1 GWh | Aug 1930 | Dec 2025 | Natural Gas |
| Rock Farm | Strata Manager, LLC | Rockingham, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Apr 2013 | Dec 2025 | Solar |
| 77 Farm to Market Rd Hybrid(CSG) | 77F2M WHAM8 Solar, LLC | Wareham, MA | ISO New England (ISNE) | 9.1 GWh | Nov 2021 | Dec 2025 | Solar |
| Merced Falls | Merced Irrigation District | Snelling, CA | California Independent System Operator (CISO) | 9.1 GWh | Jun 1930 | Sep 2025 | Water |
| Bearford Solar II | Bearford Solar II, LLC | Willard, NC | Duke Energy Carolinas (DUK) | 9.1 GWh | Jan 2018 | Dec 2025 | Solar |
| Lincoln Solar, LLC (NC) | Cypress Creek Renewables | Bostic, NC | Duke Energy Carolinas (DUK) | 9.1 GWh | Nov 2016 | Dec 2025 | Solar |
| Manning PV 1 | Strata Manager, LLC | Elon, NC | Duke Energy Carolinas (DUK) | 9.1 GWh | Nov 2018 | Dec 2025 | Solar |
| Rak 1 | Rak 1 Solar LLC | Fredonia, NY | New York Independent System Operator (NYIS) | 9.1 GWh | Nov 2023 | Dec 2025 | Solar |
| Menominee Mill Marinette | Eagle Creek Renewable Energy, LLC | Menominee, MI | Midcontinent Independent System Operator, Inc. (MISO) | 9.1 GWh | Dec 1923 | Aug 2026 | Water |
| HCE Reams Solar, LLC | Standard Solar | Dinwiddie, VA | PJM Interconnection, LLC (PJM) | 9.1 GWh | Jul 2024 | Dec 2025 | Solar |
| Bo Biggs Solar | Bo Biggs Solar, LLC | Lumberton, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Nov 2018 | Dec 2025 | Solar |
| Nash 97 Solar, LLC | Cypress Creek Renewables | Middlesex, NC | Duke Energy Carolinas (DUK) | 9.2 GWh | Mar 2016 | Dec 2025 | Solar |
| Valley View Solar | SR Clinch, LLC | Greeley, CO | Western Area Power Administration - Rocky Mountain Region (WACM) | 9.2 GWh | Nov 2015 | Dec 2025 | Solar |
| Pikeville Farm | Dominion Renewable Energy | Pikeville, NC | Duke Energy Progress East (CPLE) | 9.2 GWh | Oct 2017 | Dec 2025 | Solar |
| Bristol Landfill Solar | NuGen Capital Management | Bristol, RI | ISO New England (ISNE) | 9.2 GWh | Feb 2024 | Dec 2025 | Solar |
| Millikan Farm | Cypress Creek Renewables | Randleman, NC | Duke Energy Carolinas (DUK) | 9.2 GWh | Oct 2015 | Dec 2025 | Solar |
| DRPA Lindenwold Station Solar Project | Solar Star River SLB, LLC | Lindenwold, NJ | PJM Interconnection, LLC (PJM) | 9.2 GWh | Nov 2021 | Dec 2025 | Solar |
| Bearford Farm Solar Project | Strata Manager, LLC | Willard, NC | Duke Energy Progress East (CPLE) | 9.2 GWh | Feb 2017 | Dec 2025 | Solar |
| Richmond Solar Park 3 | Indiana Municipal Power Agency | Richmond, IN | PJM Interconnection, LLC (PJM) | 9.2 GWh | Nov 2019 | Dec 2025 | Solar |
| McGoogan Farm, LLC | Strata Manager, LLC | Lumber Bridge, NC | Duke Energy Carolinas (DUK) | 9.2 GWh | Jul 2015 | Dec 2025 | Solar |
| Morgan Farm, LLC | SRE Utility Solar 1, LLC | Louisburg, NC | Duke Energy Carolinas (DUK) | 9.2 GWh | Nov 2015 | Dec 2025 | Solar |
| North Nash Farm, LLC | Strata Manager, LLC | Castalia, NC | Duke Energy Progress East (CPLE) | 9.2 GWh | Nov 2015 | Dec 2025 | Solar |
| Warrensburg Hydroelectric | Boralex Hydro Operations Inc | Warrensburg, NY | New York Independent System Operator (NYIS) | 9.2 GWh | Nov 1988 | Dec 2025 | Water |
| Sonne One | Cypress Creek Renewables | Goldsboro, NC | Duke Energy Carolinas (DUK) | 9.2 GWh | Dec 2015 | Dec 2025 | Solar |
| Santa Cruz Energy | Santa Cruz Energy LLC | Santa Cruz, CA | California Independent System Operator (CISO) | 9.2 GWh | Oct 2009 | Dec 2025 | Landfill Gas |
| CBEP Solar 7 | Green Street Power Partners | Johnstown, CO | Public Service Company of Colorado (PSCO) | 9.2 GWh | Jul 2024 | Dec 2025 | Solar |
| Heimlich Solar | Heimlich Solar Partners LLC | Greenwood, DE | PJM Interconnection, LLC (PJM) | 9.2 GWh | May 2024 | Dec 2024 | Solar |
| ELP Claverack Solar | ELP Claverack Solar, LLC | Claverack, NY | New York Independent System Operator (NYIS) | 9.2 GWh | Dec 2022 | Dec 2025 | Solar |
| Cedar Branch | NJR Clean Energy Ventures Corporation | Buena Vista Township, NJ | PJM Interconnection, LLC (PJM) | 9.2 GWh | Sep 2016 | Dec 2025 | Solar |
| Crystal Farms Local Solar | Agilitas Energy, Inc. | San Joaquin, CA | California Independent System Operator (CISO) | 9.2 GWh | Oct 2023 | Dec 2025 | Solar |
| Pivot Solar NY 1 | Pivot Energy | Ticonderoga, NY | New York Independent System Operator (NYIS) | 9.2 GWh | Feb 2024 | Dec 2025 | Solar |
| Sun Farm VI, LLC | Greenbacker Renewable Energy Corporation | Hertford, NC | PJM Interconnection, LLC (PJM) | 9.2 GWh | Oct 2018 | Dec 2025 | Solar |
| Blueberry One | Cypress Creek Renewables | Grantham, NC | Duke Energy Carolinas (DUK) | 9.2 GWh | Dec 2015 | Dec 2025 | Solar |
| Gross Hydro Plant | Denver City & County of - (CO) | Boulder, CO | Public Service Company of Colorado (PSCO) | 9.2 GWh | Jul 2007 | Dec 2025 | Water |
| Soluga Farms 1 | Strata Manager, LLC | Newton Grove, NC | Duke Energy Progress East (CPLE) | 9.2 GWh | May 2014 | Dec 2025 | Solar |
| BG Stewart Solar Farm, LLC | Cypress Creek Renewables | Marshville, NC | Duke Energy Carolinas (DUK) | 9.2 GWh | Oct 2015 | Dec 2025 | Solar |
| Klamath Expansion Project | Klamath Energy LLC | Klamath Falls, OR | Avangrid Renewables, LLC (AVRN) | 9.2 GWh | Apr 2002 | Dec 2025 | Natural Gas |
| Bunn Level Farm, LLC | Strata Manager, LLC | Bunnlevel, NC | Duke Energy Carolinas (DUK) | 9.2 GWh | Nov 2016 | Dec 2025 | Solar |
| WED Coventry 2 | WED Coventry Two, LLC | Coventry, RI | ISO New England (ISNE) | 9.2 GWh | Jul 2016 | Aug 2026 | Wind |
| Holland Solar Farm | NJR Clean Energy Ventures Corporation | Holland Township, NJ | PJM Interconnection, LLC (PJM) | 9.2 GWh | Jun 2022 | Dec 2025 | Solar |
Summary of Power Plants By State
Figures are based on August 2026 generation numbers.| State | Rank | Active Plants | Aug 2026 Generation |
|---|---|---|---|
| Alabama | # 9 | 80 | 13,897.78 GWh |
| Alaska | # 48 | 146 | 672.99 GWh |
| Arizona | # 10 | 203 | 13,589.64 GWh |
| Arkansas | # 23 | 122 | 7,027.75 GWh |
| California | # 3 | 1,840 | 24,164.86 GWh |
| Colorado | # 30 | 321 | 5,322.30 GWh |
| Connecticut | # 34 | 180 | 4,400.98 GWh |
| Delaware | # 49 | 35 | 555.40 GWh |
| District of Columbia | # 51 | 19 | 21.71 GWh |
| Florida | # 2 | 345 | 28,185.93 GWh |
| Georgia | # 6 | 261 | 15,282.60 GWh |
| Hawaii | # 47 | 73 | 863.62 GWh |
| Idaho | # 43 | 152 | 1,754.56 GWh |
| Illinois | # 5 | 556 | 18,683.36 GWh |
| Indiana | # 17 | 226 | 9,970.06 GWh |
| Iowa | # 27 | 301 | 5,759.64 GWh |
| Kansas | # 26 | 191 | 6,368.18 GWh |
| Kentucky | # 21 | 63 | 7,221.26 GWh |
| Louisiana | # 14 | 93 | 10,670.45 GWh |
| Maine | # 45 | 250 | 1,285.31 GWh |
| Maryland | # 37 | 236 | 3,745.22 GWh |
| Massachusetts | # 41 | 679 | 1,958.59 GWh |
| Michigan | # 12 | 288 | 12,064.19 GWh |
| Minnesota | # 32 | 794 | 5,047.38 GWh |
| Mississippi | # 19 | 62 | 8,358.70 GWh |
| Missouri | # 22 | 134 | 7,125.71 GWh |
| State | Rank | Active Plants | Aug 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 72 | 2,266.60 GWh |
| Nebraska | # 39 | 132 | 3,448.00 GWh |
| Nevada | # 29 | 117 | 5,523.31 GWh |
| New Hampshire | # 42 | 60 | 1,901.10 GWh |
| New Jersey | # 25 | 409 | 6,440.88 GWh |
| New Mexico | # 33 | 166 | 4,571.47 GWh |
| New York | # 11 | 1,087 | 13,130.21 GWh |
| North Carolina | # 8 | 921 | 14,263.55 GWh |
| North Dakota | # 38 | 62 | 3,579.89 GWh |
| Ohio | # 7 | 216 | 14,448.49 GWh |
| Oklahoma | # 13 | 153 | 10,965.38 GWh |
| Oregon | # 31 | 292 | 5,257.14 GWh |
| Pennsylvania | # 4 | 270 | 23,772.83 GWh |
| Rhode Island | # 46 | 108 | 924.31 GWh |
| South Carolina | # 16 | 214 | 9,989.71 GWh |
| South Dakota | # 44 | 53 | 1,486.65 GWh |
| Tennessee | # 18 | 101 | 8,430.26 GWh |
| Texas | # 1 | 1,069 | 65,726.98 GWh |
| Utah | # 36 | 131 | 4,074.82 GWh |
| Vermont | # 50 | 118 | 175.56 GWh |
| Virginia | # 15 | 255 | 10,241.54 GWh |
| Washington | # 20 | 137 | 8,189.60 GWh |
| West Virginia | # 28 | 41 | 5,593.74 GWh |
| Wisconsin | # 24 | 272 | 6,683.19 GWh |
| Wyoming | # 35 | 71 | 4,322.19 GWh |