TransAlta Wyoming Wind
3287 Divide Rd, Evanston, WY 82930Plant Summary Information
TransAlta Wyoming Wind is ranked #29 out of 74 power plants in Wyoming in terms of total annual net electricity generation.
TransAlta Wyoming Wind generated 85.0 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | TransAlta Wyoming Wind |
|---|---|
| Utility Name | TransAlta Wyoming Wind LLC |
| Location | Uinta County, WY |
| Initial Operation Date | December 2003 |
| Last Update | Dec 2024 |
| Annual Generation | 318.8 GWh |
| Annual Consumption | 1.2 M MMBtu |
| Ranked #1,910 out of 12,637 Power Plants Nationwide | |
| Ranked #573 out of 1,376 Wind Power Plants Nationwide | |
| Ranked #29 out of 74 Wyoming Power Plants | |
| Ranked #17 out of 32 Wyoming Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operator |
NextEra Energy Operating Services LLC (2013 to 2023) TransAlta Wyoming Wind LLC (2024 to 2024) |
Map of TransAlta Wyoming Wind
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for TransAlta Wyoming Wind.
Monthly Net Generation for TransAlta Wyoming Wind
Monthly Plant Fuel Consumption for TransAlta Wyoming Wind
TransAlta Wyoming Wind Details
| Summary Information | |
|---|---|
| Plant Name | TransAlta Wyoming Wind (56093) |
| Plant Address | 3287 Divide Rd, Evanston, WY 82930 |
| Utility | TransAlta Wyoming Wind LLC (58608) |
| Latitude, Longitude | 41.2874, -110.5556 |
| Generation Dates on File | Dec 2003 to Dec 2024 |
| Initial Operation Date | December 2003 |
| Annual Generation | 318.8 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | PacifiCorp - East (PACE) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | NA |
| Ash Impoundment | No |
| Transmission / Distribution Owner | PacifiCorp (14354) WY |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator GE15 Details Operating December 2003
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 144 MW |
| Summer Capacity | 142.2 MW |
| Winter Capacity | 142.2 MW |
| Minimum Load | 8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2003 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 78 |
| Other Combustion Technology | No |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 78 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V80-1.8 |
| Design Wind Speed | 20 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 240 |
TransAlta Wyoming Wind Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #563 | Contrail Wind Farm | Bedford, IA | 326.5 GWh |
| #564 | Shady Oaks Wind Farm | Compton, IL | 326.4 GWh |
| #565 | Tyler Bluff Wind Project, LLC | Muenster, TX | 326.1 GWh |
| #566 | Palouse | Oakesdale, WA | 325.9 GWh |
| #567 | Bluestone Wind, LLC | Sanford, NY | 325.8 GWh |
| #568 | Hackberry Wind Farm | Albany, TX | 325.7 GWh |
| #569 | Meadow Creek Project Company | Idaho Falls, ID | 325.0 GWh |
| #570 | Blue Sky Green Field Wind Project | Fond du Lac, WI | 324.4 GWh |
| #571 | Little Elk Wind Project LLC | Cordell, OK | 323.7 GWh |
| #572 | Ivester Wind Farm | Wellsburg, IA | 319.9 GWh |
| #574 | Sand Bluff Wind Farm | Big Spring, TX | 318.2 GWh |
| #575 | Paulding Wind Farm III | Payne, OH | 318.0 GWh |
| #576 | Cloud County Wind Farm | Concordia, KS | 317.2 GWh |
| #577 | Shady Oaks Wind 2 | Compton, IL | 316.8 GWh |
| #578 | Anacacho Wind Farm, LLC | Brackettville, TX | 316.0 GWh |
| #579 | Post Wind Farm LP | Fluvanna, TX | 314.8 GWh |
| #580 | Monte Cristo 1 | Monte Alto, TX | 314.6 GWh |
| #581 | Sac County Wind, LLC | Sac City, IA | 312.4 GWh |
| #582 | Paulding Wind Farm II | Payne, OH | 311.7 GWh |
| #583 | Pacific Wind LLC | Rosamond, CA | 311.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding TransAlta Wyoming Wind.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Causey | South Fork, UT | 5.3 GWh | 53.6 mi |
| Echo Dam | Echo, UT | 13.3 GWh | 50.9 mi |
| Flaming Gorge | Dutch John, UT | 407.9 GWh | 64.4 mi |
| Fontenelle | Le Barge, WY | 53.3 GWh | 57.1 mi |
| Gateway | Mountain Green, UT | 14.9 GWh | 67.1 mi |
| General Chemical | Green River, WY | 212.1 GWh | 46.6 mi |
| Genesis Alkali | Green River, WY | 259.5 GWh | 44.9 mi |
| Heber City | Heber City, UT | 27.6 GWh | 70.7 mi |
| Hydro II | Logan, UT | 19.1 GWh | 70.9 mi |
| Jordanelle Dam Hydroelectric Project | Heber, UT | 51.0 GWh | 65.8 mi |
| Lake Creek Dam | Heber City, UT | 3.2 GWh | 67.6 mi |
| Mountain Wind Power II LLC | Fort Bridger, WY | 182.1 GWh | 1.7 mi |
| Mountain Wind Power LLC | Fort Bridger, WY | 149.4 GWh | 3.9 mi |
| Naughton | Kemmerer, WY | 1.9 TWh | 32.6 mi |
| Pine View Dam | Ogden, UT | 6.2 GWh | 67.2 mi |
| Sage Solar I-III | Randolph, UT | 138.1 GWh | 42.3 mi |
| Shute Creek Facility | Kemmerer, WY | 867.1 GWh | 47.5 mi |
| Sweetwater Solar | Green River, WY | 172.9 GWh | 51 mi |
| Uintah | Neola, UT | 6.7 GWh | 57.7 mi |
| Wanship | Wanship, UT | 9.0 GWh | 56 mi |