Woodleaf Solar Facility
6205 NC 801 Hwy, Salisbury, NC 28147Plant Summary Information
Woodleaf Solar Facility is ranked #104 out of 762 solar farms in North Carolina in terms of total annual net electricity generation.
Woodleaf Solar Facility generated 2.5 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Woodleaf Solar Facility |
|---|---|
| Utility Name | Duke Energy Carolinas, LLC |
| Location | Rowan County, NC |
| Initial Operation Date | December 2018 |
| Last Update | Dec 2025 |
| Annual Generation | 12.6 GWh |
| Annual Consumption | 45.5 k MMBtu |
| Ranked #5,902 out of 13,081 Power Plants Nationwide | |
| Ranked #1,796 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #170 out of 876 North Carolina Power Plants | |
| Ranked #104 out of 762 North Carolina Solar Power Plants | |
| Fuel Types | Solar |
Map of Woodleaf Solar Facility
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Woodleaf Solar Facility.
Monthly Net Generation for Woodleaf Solar Facility
Monthly Plant Fuel Consumption for Woodleaf Solar Facility
Woodleaf Solar Facility Details
| Summary Information | |
|---|---|
| Plant Name | Woodleaf Solar Facility (62304) |
| Plant Address | 6205 NC 801 Hwy, Salisbury, NC 28147 |
| Utility | Duke Energy Carolinas, LLC (5416) |
| Latitude, Longitude | 35.72443, -80.60845 |
| Generation Dates on File | Jan 2019 to Dec 2025 |
| Initial Operation Date | December 2018 |
| Annual Generation | 12.6 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Duke Energy Progress East (CPLE) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Duke Energy Progress - (NC) (3046) NC |
| Grid Voltage | 12.47 kV |
| Energy Storage | No |
Generator PV1 Details Operating December 2018
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 6 MW |
| Summer Capacity | 6 MW |
| Winter Capacity | 6 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2018 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Time From Cold Shutdown To Full Load | 1H |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Fixed Tilt | No |
| Azimuth Angle | 180 |
| DC Net Capacity | 9.4 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Woodleaf Solar Facility Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1786 | SunE Alamosa | Hooper, CO | 12.8 GWh |
| #1787 | Spring Prairie Solar WI, LLC | Burlington, WI | 12.8 GWh |
| #1788 | Smithfield 1 | Milford, UT | 12.8 GWh |
| #1789 | ANAD Solar Array | Anniston Army Depot, AL | 12.8 GWh |
| #1790 | Jefferson Solar (SC) | Hartsville, SC | 12.7 GWh |
| #1791 | GDIM 2, LLC | North Smithfield, RI | 12.7 GWh |
| #1792 | Pemberton Road I | Pemberton, NJ | 12.7 GWh |
| #1793 | Pemberton Road II | Pemberton, NJ | 12.7 GWh |
| #1794 | Indianapolis Motor Speedway Solar PV | Indianapolis, IN | 12.7 GWh |
| #1795 | City of Gallup Solar | Gallup, NM | 12.7 GWh |
| #1797 | Antelope Expansion 3B | Lancaster, CA | 12.6 GWh |
| #1798 | Five Points Solar Station | Five Points, CA | 12.6 GWh |
| #1799 | Wheeler Ridge | Bakersfield, CA | 12.6 GWh |
| #1800 | Fort Rucker Solar Array | Fort Rucker, AL | 12.5 GWh |
| #1801 | IBM Solar | Boulder, CO | 12.5 GWh |
| #1802 | Dodge Center Solar | Dodge Center, MN | 12.5 GWh |
| #1803 | Bartow Solar Energy LLC | Bartow, FL | 12.5 GWh |
| #1804 | Wonderful Orchards - Belridge | Lost Hills, CA | 12.4 GWh |
| #1805 | Tech Park Solar | Tucson, AZ | 12.4 GWh |
| #1806 | Pohatcong Solar Farm | Pohatcong, NJ | 12.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Woodleaf Solar Facility.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Buck | Salisbury, NC | 4.5 TWh | 13 mi |
| Catawba Solar LLC | Salisbury, NC | 2.8 GWh | 9 mi |
| Daniel Farm LLC | Mocksville, NC | 9.0 GWh | 9.1 mi |
| Davidson III | Lexington, NC | 6.7 GWh | 18 mi |
| Davidson IV | Lexington, NC | 4.7 GWh | 18 mi |
| Iredell County LFG Facility | Statesville, NC | 26.0 GWh | 12.6 mi |
| Meadowbrook Solar Farm | Rockwell, NC | 7.0 GWh | 17.1 mi |
| Mocksville Farm | Mocksville, NC | 8.9 GWh | 11.3 mi |
| Mocksville Solar | Mocksville, NC | 25.8 GWh | 7.8 mi |
| Organ Church Solar | Rockwell, NC | 10.1 GWh | 16.3 mi |
| Redmon Solar Farm LLC | Cleveland, NC | 4.0 GWh | 3.4 mi |
| Rockwell Solar LLC | Rockwell, NC | 4.1 GWh | 14.7 mi |
| Rowan | Salisbury, NC | 5.0 TWh | 0.6 mi |
| Salisbury Solar | Salisbury, NC | 7.7 GWh | 12.2 mi |
| Saw Solar | China Grove, NC | 10.6 GWh | 11.9 mi |
| Spencer Farm, LLC | Salisbury, NC | 9.0 GWh | 11.3 mi |
| Statesville Solar | Cleveland, NC | 8.9 GWh | 5.9 mi |
| Tiburon Holdings | Advance, NC | 9.0 GWh | 16.4 mi |
| Tripple State Farm | Statesville, NC | 9.5 GWh | 9.4 mi |
| West Salisbury Farm LLC | Salisbury, NC | 8.4 GWh | 6.1 mi |