198 Blair Bend Drive, Loudon, TN 37774Plant Summary Information
Primient Loudon Plant is ranked #21 out of 86 power plants in Tennessee in terms of total annual net electricity generation.
Primient Loudon Plant is comprised of 2 generators and generated 93.6 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Primient Loudon Plant |
|---|---|
| Utility Name | PRIMIENT, LLC |
| Location | Loudon County, TN |
| Initial Operation Date | October 2016 |
| Last Update | Dec 2024 |
| Annual Generation | 393.6 GWh |
| Annual Consumption | 5.6 M MMBtu |
| Ranked #1,600 out of 12,539 Power Plants Nationwide | |
| Ranked #600 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #21 out of 86 Tennessee Power Plants | |
| Ranked #6 out of 15 Tennessee Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
| Previous Operator |
Tate and Lyle Ingredients, LLC (2019 to 2021) PRIMIENT, LLC (2022 to 2024) |
Map of Primient Loudon Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Primient Loudon Plant.
Monthly Net Generation for Primient Loudon Plant
Primient Loudon Plant Details
| Summary Information | |
|---|---|
| Plant Name | Primient Loudon Plant (63632) |
| Plant Address | 198 Blair Bend Drive, Loudon, TN 37774 |
| Utility | PRIMIENT, LLC (63346) |
| Latitude, Longitude | 35.73509, -84.3193 |
| Generation Dates on File | Jan 2019 to Dec 2024 |
| Initial Operation Date | October 2016 |
| Annual Generation | 393.6 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Tennessee Valley Authority (TVA) |
| NAICS Code | Food Manufacturing (311) |
| Sector | Industrial CHP (7) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Tennessee Valley Authority (18642) TN |
| Grid Voltage | 161.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | Other - See pipeline notes. |
| Pipeline Notes | SYMMETRY ENERGY SOLUTIONS IS OUR GAS SUPPLIER. |
| Natural Gas Storage | No |
| Liquefied Natural Gas Storage | No |
Generator Y9111 Details Operating October 2016
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 30.7 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 26 MW |
| Winter Capacity | 30.7 MW |
| Minimum Load | 14 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | October 2016 |
| Combined Heat & Power | Yes |
|---|---|
| Sector Name | Industrial CHP (7) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator Y9121 Details Operating October 2016
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 30.7 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 26 MW |
| Winter Capacity | 30.7 MW |
| Minimum Load | 14 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | October 2016 |
| Combined Heat & Power | Yes |
|---|---|
| Sector Name | Industrial CHP (7) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Primient Loudon Plant Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #590 | Nikiski Combined Cycle | Nikiski, AK | 414.8 GWh |
| #591 | Bluffview | Farmington, NM | 409.1 GWh |
| #592 | Primient | Lafayette, IN | 406.0 GWh |
| #593 | Western 102 Power Plant | McCarran, NV | 405.0 GWh |
| #594 | Formosa Plastics | Baton Rouge, LA | 402.4 GWh |
| #595 | Power Station 4 | Texas City, TX | 401.4 GWh |
| #596 | Kennedy International Airport Cogen | Jamaica, NY | 398.6 GWh |
| #597 | A B Brown | Mount Vernon, IN | 394.9 GWh |
| #598 | Washington Parish Energy Center | Bogalusa, LA | 394.3 GWh |
| #599 | Roseton Generating Facility | Newsburgh, NY | 457.4 GWh |
| #601 | Mulberry Cogeneration Facility | Bartow, FL | 388.0 GWh |
| #602 | Orange Cogeneration Facility | Bartow, FL | 387.5 GWh |
| #603 | SABIC Innovative Plastics Mt. Vernon | Mount Vernon, IN | 385.7 GWh |
| #604 | Tulsa | Tulsa, OK | 384.5 GWh |
| #605 | Marsh Run Generation Facility | Remington, VA | 390.8 GWh |
| #606 | Gary Works | Gary, IN | 783.8 GWh |
| #607 | University of Florida | Gainesville, FL | 379.0 GWh |
| #608 | Trinidad (TX) | Trinidad, TX | 376.4 GWh |
| #609 | F.D. Kuester Generating Station | Negaunee, MI | 374.8 GWh |
| #610 | Blythe Energy Inc | Blythe, CA | 371.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Primient Loudon Plant.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Apalachia | Reliance, TN | 402.1 GWh | 39.2 mi |
| Buffalo Mountain Energy Center | Oliver Springs, TN | 15.8 GWh | 27.1 mi |
| Calderwood | Tallassee, TN | 549.2 GWh | 25.4 mi |
| Cheoah | Tapoco, NC | 484.9 GWh | 29.2 mi |
| Chestnut Ridge Gas Recovery | Heiskell, TN | 31.1 GWh | 30.9 mi |
| Chilhowee | Tallassee, TN | 159.1 GWh | 20 mi |
| Douglas Dam | Dandridge, TN | 446.4 GWh | 46.4 mi |
| Fontana Dam | Fontana Dam, NC | 879.0 GWh | 34.9 mi |
| Fort Loudoun | Lenoir City, TN | 732.1 GWh | 5.8 mi |
| Hiwassee Dam | Murphy, NC | 267.2 GWh | 41.1 mi |
| Kingston | Kingston, TN | 3.4 TWh | 15.9 mi |
| Melton Hill | Lenoir City, TN | 125.1 GWh | 10.4 mi |
| Norris Dam | Norris, TN | 386.9 GWh | 36.1 mi |
| Ocoee 1 | Benton, TN | 69.2 GWh | 48 mi |
| Ocoee 2 | Benton, TN | 86.7 GWh | 46.1 mi |
| Ocoee 3 | Benton, TN | 151.7 GWh | 46.5 mi |
| Santeetlah | Robbinsville, NC | 138.5 GWh | 32.4 mi |
| University of Tennessee Steam Plant | Knoxville, TN | 34.0 GWh | 26.5 mi |
| Watts Bar Hydro | Spring City, TN | 895.6 GWh | 27.4 mi |
| Watts Bar Nuclear Plant | Spring City, TN | 15.1 TWh | 27.9 mi |