Cheoah
Hwy 129, Tapoco, NC 28771Plant Summary Information
Cheoah is ranked #22 out of 868 power plants in North Carolina in terms of total annual net electricity generation.
Cheoah is comprised of 5 generators and generated 144.1 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Cheoah |
---|---|
Utility Name | Brookfield Smoky Mountain Hydropower LP |
Location | Graham County, NC |
Initial Operation Date | September 1949 |
Last Update | Dec 2024 |
Annual Generation | 484.9 GWh |
Annual Consumption | 1.8 M MMBtu |
Ranked #1,333 out of 12,288 Power Plants Nationwide | |
Ranked #80 out of 1,323 Water Power Plants Nationwide | |
Ranked #22 out of 868 North Carolina Power Plants | |
Ranked #3 out of 35 North Carolina Water Power Plants | |
Fuel Types | Water |
Previous Operator |
Brookfield Smoky Mountain Hydropower LLC (2013 to 2018) Brookfield Smoky Mountain Hydropower LP (2019 to 2024) |
Map of Cheoah
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cheoah.
Monthly Net Generation for Cheoah
Cheoah Details
Summary Information | |
---|---|
Plant Name | Cheoah (54899) |
Plant Address | Hwy 129, Tapoco, NC 28771 |
Utility | Brookfield Smoky Mountain Hydropower LP (306) |
Latitude, Longitude | 35.4478, -83.9383 |
Generation Dates on File | Jan 2001 to Dec 2024 |
Initial Operation Date | September 1949 |
Annual Generation | 484.9 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Tennessee Valley Authority (TVA) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Little Tennessee River |
Ash Impoundment | No |
Transmission / Distribution Owner | Tennessee Valley Authority (18642) NC |
Grid Voltage | 161.00 kV |
Energy Storage | No |
Generator 5 Details Operating September 1949
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 30 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 31 MW |
Winter Capacity | 31 MW |
Minimum Load | 15 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1949 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Planned Net Summer Capacity Uprate | 4.7 MW |
Planned Net Winter Capacity Uprate | 4.7 MW |
Planned Uprate | January 2026 |
Generator 4A Details Operating November 2012
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 27.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 28 MW |
Winter Capacity | 28 MW |
Minimum Load | 14 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 2012 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 2A Details Operating August 2012
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 27.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 28 MW |
Winter Capacity | 28 MW |
Minimum Load | 14 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2012 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 1A Details Operating September 2012
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 27.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 28 MW |
Winter Capacity | 28 MW |
Minimum Load | 14 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 2012 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 3A Details Operating July 2013
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 27.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 28 MW |
Winter Capacity | 28 MW |
Minimum Load | 14 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2013 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Cheoah Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#70 | Trinity | Weaverville, CA | 531.0 GWh |
#71 | Swift 1 | Cougar, WA | 525.6 GWh |
#72 | Dardanelle | Dardanelle, AR | 517.3 GWh |
#73 | Fairfield Pumped Storage | Jenkinsville, SC | 501.0 GWh |
#74 | Dion R Holm | Groveland, CA | 497.3 GWh |
#75 | Osage Dam | Eldon, MO | 497.1 GWh |
#76 | Collierville Powerhouse | Murphys, CA | 495.9 GWh |
#77 | Nickajack | New Hope, TN | 491.2 GWh |
#78 | Yale | Amboy, WA | 488.4 GWh |
#79 | Narrows (NC) | Badin, NC | 487.5 GWh |
#81 | Pit 5 | Big Bend, CA | 472.5 GWh |
#82 | Merwin | Ariel, WA | 467.3 GWh |
#83 | Box Canyon | Ione, WA | 464.1 GWh |
#84 | John H Kerr | Boydton, VA | 462.9 GWh |
#85 | Middle Fork | Foresthill, CA | 458.4 GWh |
#86 | Long Lake | Ford, WA | 456.2 GWh |
#87 | Guntersville | Guntersville, AL | 454.8 GWh |
#88 | Lay Dam | Clanton, AL | 454.4 GWh |
#89 | White Rock/Slab Creek | Placerville, CA | 450.4 GWh |
#90 | Walter Bouldin Dam | Wetumpka, AL | 450.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cheoah.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Apalachia | Reliance, TN | 402.1 GWh | 27.9 mi |
Calderwood | Tallassee, TN | 549.2 GWh | 3.9 mi |
Chatuge | Hayesville, NC | 26.4 GWh | 30.8 mi |
Chilhowee | Tallassee, TN | 159.1 GWh | 9.2 mi |
CS Murphy Point, LLC | Murphy, NC | 1.3 GWh | 34.2 mi |
Fontana Dam | Fontana Dam, NC | 879.0 GWh | 7.5 mi |
Fort Loudoun | Lenoir City, TN | 732.1 GWh | 29.3 mi |
Franklin (NC) | Franklin, NC | 4.5 GWh | 35.7 mi |
Hiwassee Dam | Murphy, NC | 223.6 GWh | 24.6 mi |
Martins Creek Solar NC, LLC | Murphy, NC | 1.1 GWh | 29.9 mi |
Melton Hill | Lenoir City, TN | 125.1 GWh | 36.4 mi |
Mission | Murphy, NC | 6.3 GWh | 26.5 mi |
Murphy Farm Power, LLC | Culberson, NC | 1.2 GWh | 33.4 mi |
Nantahala | Topton, NC | 182.7 GWh | 19.1 mi |
Nottely | Blairsville, GA | 25.7 GWh | 34.8 mi |
Ocoee 3 | Benton, TN | 151.7 GWh | 40.1 mi |
Primient Loudon Plant | Loudon, TN | 393.6 GWh | 29.2 mi |
Queens Creek | Topton, NC | 3.0 GWh | 19.2 mi |
Santeetlah | Robbinsville, NC | 138.5 GWh | 4.2 mi |
University of Tennessee Steam Plant | Knoxville, TN | 35.0 GWh | 34.7 mi |