Saint Marys Hospital Power Plant
1216 Second St NW, Rochester, MN 55902Plant Summary Information
Saint Marys Hospital Power Plant is ranked #21 out of 55 natural gas power plants in Minnesota in terms of total annual net electricity generation.
Saint Marys Hospital Power Plant is comprised of 5 generators and generated 12.8 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Saint Marys Hospital Power Plant |
|---|---|
| Utility Name | St Mary's Hospital |
| Location | Olmsted County, MN |
| Initial Operation Date | January 1971 |
| Last Update | May 2026 |
| Annual Generation | 55.5 GWh |
| Annual Consumption | 961.7 k MMBtu |
| Ranked #4,074 out of 13,081 Power Plants Nationwide | |
| Ranked #1,069 out of 2,206 Natural Gas Power Plants Nationwide | |
| Ranked #85 out of 781 Minnesota Power Plants | |
| Ranked #21 out of 55 Minnesota Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 99.0% Distillate Fuel Oil : 1.0% |
Map of Saint Marys Hospital Power Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Saint Marys Hospital Power Plant.
Monthly Net Generation for Saint Marys Hospital Power Plant
Monthly Plant Fuel Consumption for Saint Marys Hospital Power Plant
Saint Marys Hospital Power Plant Details
| Summary Information | |
|---|---|
| Plant Name | Saint Marys Hospital Power Plant (54262) |
| Plant Address | 1216 Second St NW, Rochester, MN 55902 |
| Utility | St Mary's Hospital (17897) |
| Latitude, Longitude | 44.09785, -92.47982 |
| Generation Dates on File | Jan 2001 to May 2026 |
| Initial Operation Date | January 1971 |
| Annual Generation | 55.5 GWh |
| Fuel Types | Natural Gas : 99.0% Distillate Fuel Oil : 1.0% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Hospitals (622) |
| Sector | Commercial CHP (5) |
| Water Source | Wells Municipality |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Rochester Public Utilities (16181) MN |
| Grid Voltage | 13.80 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | MINNESOTA ENERGY RESOURCES |
Generator 4 Details Operating January 1971
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Nameplate Capacity | 3 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 2.7 MW |
| Winter Capacity | 2.7 MW |
| Minimum Load | 0.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | January 1971 |
|---|---|
| Combined Heat & Power | Yes |
| Sector Name | Commercial CHP (5) |
| Topping Or Bottoming | B |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 2.7 MW |
| Net Winter Capacity With Natural Gas | 2.7 MW |
| Net Summer Capacity With Oil | 2.7 MW |
| Net Winter Capacity With Oil | 2.7 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | No |
Generator 5 Details Standby January 1978
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 2.5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 2.5 MW |
| Winter Capacity | 2.5 MW |
| Minimum Load | 0.3 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
| Synchronized To Transmission Grid | Yes |
|---|---|
| First Operation Date | January 1978 |
| Combined Heat & Power | No |
| Sector Name | Commercial CHP (5) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 1 Details Operating June 1996
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Nameplate Capacity | 4.7 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 4.5 MW |
| Winter Capacity | 4.5 MW |
| Minimum Load | 1.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 1996 |
|---|---|
| Combined Heat & Power | Yes |
| Sector Name | Commercial CHP (5) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 7 Details Operating March 2011
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 2.8 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 2.8 MW |
| Winter Capacity | 2.8 MW |
| Minimum Load | 0.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2011 |
| Combined Heat & Power | No |
| Sector Name | Commercial CHP (5) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 6B Details Operating July 2020
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 3.3 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 3.3 MW |
| Winter Capacity | 3.3 MW |
| Minimum Load | 0.3 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2020 |
| Combined Heat & Power | No |
| Sector Name | Commercial CHP (5) |
| Energy Source | Distillate Fuel Oil |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Saint Marys Hospital Power Plant Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1059 | Georgia-Pacific Wauna Mill | Clatskanie, OR | 170.9 GWh |
| #1060 | Bristol Myers Squibb New Brunswick | New Brunswick, NJ | 55.9 GWh |
| #1061 | SWM Fuel Cell | Yaphank, NY | 55.6 GWh |
| #1062 | Brunswick Cellulose | Brunswick, GA | 245.3 GWh |
| #1063 | Black Mountain Generating Station | Golden Valley, AZ | 55.2 GWh |
| #1064 | Sylvamo Corporation Eastover Facility | Eastover, SC | 546.3 GWh |
| #1065 | Hyperion Treatment Plant CHP Plant | Playa del Rey, CA | 155.9 GWh |
| #1066 | Mars Wrigley Confectionery US, LLC | Hackettstown, NJ | 55.2 GWh |
| #1067 | J K Spruce | San Antonio, TX | 6.2 TWh |
| #1068 | San Diego State University | San Diego, CA | 56.5 GWh |
| #1070 | CH Resources Syracuse | Solvay, NY | 54.8 GWh |
| #1071 | Waterbury Generation | Waterbury, CT | 55.0 GWh |
| #1072 | International Paper Georgetown Mill | Georgetown, SC | 484.7 GWh |
| #1073 | Newington | Newington, NH | 157.4 GWh |
| #1074 | Gillette SBMC | Boston, MA | 54.2 GWh |
| #1075 | Cogeneration 1 | Tucson, AZ | 54.1 GWh |
| #1076 | General Chemical | Green River, WY | 215.9 GWh |
| #1077 | New York Presbyterian Hospital- 68th Street | New York, NY | 54.1 GWh |
| #1078 | Tilton | Tilton, IL | 53.8 GWh |
| #1079 | AOC, Capitol Power Plant | Washington, DC | 54.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Saint Marys Hospital Power Plant.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 4710 Hosting | Rochester, MN | 63.0 MWh | 2.8 mi |
| Bear Grove Solar | Byron, MN | 1.8 GWh | 5.6 mi |
| Cascade Creek | Rochester, MN | 32.7 GWh | 4.6 mi |
| DodgeSun CSG | Kasson, MN | 9.5 GWh | 11.2 mi |
| Franklin Heating Station | Rochester, MN | 63.0 GWh | 5.4 mi |
| Hwy 14 Holdco Solar CSG | Byron, MN | 6.7 GWh | 7.7 mi |
| IBM West | Rochester, MN | 24.0 MWh | 3.1 mi |
| Lange Solar | Byron, MN | 1.7 GWh | 9.3 mi |
| Maston Garden Solar | Kasson, MN | 1.8 GWh | 11.1 mi |
| Novel Bartel Solar CSG | Byron, MN | 1.7 GWh | 10.5 mi |
| Novel Byron Solar CSG | Byron, MN | 1.8 GWh | 9.2 mi |
| Novel DeCook Solar CSG | Byron, MN | 1.8 GWh | 9.4 mi |
| Novel Sunnyfield Farms Solar LLC CSG | Mazeppa, MN | 2.0 GWh | 10.7 mi |
| Olmsted Waste Energy | Rochester, MN | 47.5 GWh | 5.5 mi |
| Rochester Hydro | Mazeppa, MN | 21.9 GWh | 8 mi |
| Tweite Community Solar LLC | Byron, MN | 1.7 GWh | 10.9 mi |
| USS Wells Creek Solar LLC | Goodhue, MN | 2.0 GWh | 11 mi |
| Water Reclamation Plant | Rochester, MN | 3.7 GWh | 2.3 mi |
| Westside Energy Station | Rochester, MN | 56.9 GWh | 5.4 mi |
| Westside Solar | Rochester, MN | 19.0 GWh | 4.6 mi |