Brownsville Peaking Power
948 Beechgrove Rd, Brownsville, TN 38012Plant Summary Information
Brownsville Peaking Power is ranked #41 out of 97 power plants in Tennessee in terms of total annual net electricity generation.
Brownsville Peaking Power is comprised of 4 generators and generated 24.1 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Brownsville Peaking Power |
|---|---|
| Utility Name | Tennessee Valley Authority |
| Location | Haywood County, TN |
| Initial Operation Date | June 1999 |
| Last Update | Dec 2025 |
| Annual Generation | 119.4 GWh |
| Annual Consumption | 1.6 M MMBtu |
| Ranked #3,288 out of 13,081 Power Plants Nationwide | |
| Ranked #867 out of 2,206 Natural Gas Power Plants Nationwide | |
| Ranked #41 out of 97 Tennessee Power Plants | |
| Ranked #10 out of 15 Tennessee Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of Brownsville Peaking Power
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Brownsville Peaking Power.
Monthly Net Generation for Brownsville Peaking Power
Monthly Plant Fuel Consumption for Brownsville Peaking Power
Brownsville Peaking Power Details
| Summary Information | |
|---|---|
| Plant Name | Brownsville Peaking Power (55081) |
| Plant Address | 948 Beechgrove Rd, Brownsville, TN 38012 |
| Utility | Tennessee Valley Authority (18642) |
| Latitude, Longitude | 35.5438, -89.198 |
| Generation Dates on File | Apr 2001 to Dec 2025 |
| Initial Operation Date | June 1999 |
| Annual Generation | 119.4 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 99-79-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Tennessee Valley Authority (TVA) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Tennessee Valley Authority (18642) TN |
| Grid Voltage | 500.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | ANR PIPELINE COMPANY |
| Natural Gas Storage | No |
Generator 1 Details Operating June 1999
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 112 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 110 MW |
| Winter Capacity | 124 MW |
| Minimum Load | 75 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 1999 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating June 1999
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 112 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 110 MW |
| Winter Capacity | 124 MW |
| Minimum Load | 75 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 1999 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 3 Details Operating June 1999
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 118 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 118 MW |
| Winter Capacity | 132 MW |
| Minimum Load | 84 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 1999 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 4 Details Operating June 1999
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 118 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 118 MW |
| Winter Capacity | 132 MW |
| Minimum Load | 84 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 1999 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Brownsville Peaking Power Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #857 | Mountain Peak Power Station | Keenesburg, CO | 124.4 GWh |
| #858 | Sentinel Energy Center, LLC | Desert Hot Springs, CA | 124.4 GWh |
| #859 | University Park North | University Park, IL | 123.7 GWh |
| #860 | Spring Creek Energy Center | Edmond, OK | 123.6 GWh |
| #861 | NIH Cogeneration Facility | Bethesda, MD | 123.4 GWh |
| #862 | Darbytown | Richmond, VA | 166.1 GWh |
| #863 | Clearwater Paper Corporation - Augusta | Augusta, GA | 367.0 GWh |
| #864 | Spiritwood Station | Spiritwood, ND | 212.8 GWh |
| #865 | Vernon Boulevard | Long Island City, NY | 120.4 GWh |
| #866 | Hell Gate | Bronx, NY | 119.9 GWh |
| #868 | International Paper Pine Hill Mill | Pine Hill, AL | 424.5 GWh |
| #869 | International Paper Prattville Mill | Prattville, AL | 544.3 GWh |
| #870 | Charles D. Lamb Energy Center | Ponca City, OK | 118.1 GWh |
| #871 | Pittsburgh Airport Gas Plant | Coraopolis, PA | 118.0 GWh |
| #872 | Indeck Oswego Energy Center | Oswego, NY | 117.8 GWh |
| #873 | Saguaro | Red Rock, AZ | 117.5 GWh |
| #874 | Kansas Ethanol, LLC | Lyons, KS | 117.4 GWh |
| #875 | Neil Simpson II | Gillette, WY | 641.8 GWh |
| #876 | BYU Central Heating Plant | Provo, UT | 115.9 GWh |
| #877 | Cumberland (NJ) | Millville, NJ | 119.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Brownsville Peaking Power.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Crooked Lake Solar, LLC | Blytheville, AR | 391.3 GWh | 41.7 mi |
| Graceland Solar, LLC | Millington, TN | 23.7 GWh | 41 mi |
| Haywood Solar | Brownsville, TN | 5.8 GWh | 5.5 mi |
| Lagoon Creek | Brownsville, TN | 3.5 TWh | 13.6 mi |
| Latitude Solar Center | Whiteville, TN | 25.7 GWh | 16.5 mi |
| Millington Solar Farm | Millington, TN | 96.2 GWh | 39.3 mi |
| Providence Solar | Madison, TN | 31.4 GWh | 8.8 mi |
| Selmer II | Selmer, TN | 15.6 GWh | 40.6 mi |
| Somerville Solar | Somerville, TN | 1.9 GWh | 23.7 mi |
| SR Bolivar | Bolivar, TN | 6.7 GWh | 22.2 mi |
| SR Brownsville | Brownsville, TN | 1.9 GWh | 3.8 mi |
| SR Canadaville, LLC | Collierville, TN | 35.3 GWh | 38.1 mi |
| SR Forked Deer | Ripley, TN | 283.0 MWh | 20.9 mi |
| SR Jackson II | Jackson, TN | 2.2 GWh | 16.4 mi |
| SR McKellar | Denmark, TN | 133.7 GWh | 15.4 mi |
| SR Millington II | Millington, TN | 17.3 GWh | 38.6 mi |
| SR Trenton | Trenton, TN | 455.0 MWh | 30.9 mi |
| West Tennessee Solar Farm | Stanton, TN | 3.2 GWh | 14.2 mi |
| Wildberry | Moscow, TN | 24.6 GWh | 34.9 mi |
| Yum Yum Solar LLC | Yum Yum, TN | 31.5 GWh | 20.4 mi |