Kyrene
7005 S Kyrene Rd., Tempe, AZ 85283Plant Summary Information
Kyrene is ranked #25 out of 168 power plants in Arizona in terms of total annual net electricity generation.
Kyrene is comprised of 7 generators and generated 496.6 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Kyrene |
|---|---|
| Utility Name | Salt River Project |
| Location | Maricopa County, AZ |
| Initial Operation Date | July 1952 |
| Last Update | Sep 2025 |
| Annual Generation | 910.1 GWh |
| Annual Consumption | 7.4 M MMBtu |
| Ranked #786 out of 12,539 Power Plants Nationwide | |
| Ranked #453 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #25 out of 168 Arizona Power Plants | |
| Ranked #17 out of 35 Arizona Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of Kyrene
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Kyrene.
Monthly Net Generation for Kyrene
Kyrene Details
| Summary Information | |
|---|---|
| Plant Name | Kyrene (147) |
| Plant Address | 7005 S Kyrene Rd., Tempe, AZ 85283 |
| Utility | Salt River Project (16572) |
| Latitude, Longitude | 33.3556, -111.9353 |
| Generation Dates on File | Jan 2001 to Sep 2025 |
| Initial Operation Date | July 1952 |
| Annual Generation | 910.1 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | WECC |
| Balancing Authority | Salt River Project (SRP) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Well Water |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Salt River Project (16572) AZ |
| Grid Voltage | 230.00 kV / 69.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name |
EL PASO NATURAL GAS COMPANY LLC TRANSWESTERN PIPELINE COMPANY |
| Natural Gas Storage | No |
Generator KY1 Details Out of Service July 1952
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 34.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 34 MW |
| Winter Capacity | 34 MW |
| Minimum Load | 4 MW |
| Uprate/Derate Completed | No |
| Status | Out of Service |
| First Operation Date | July 1952 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | OVER |
| Other Planned Modifications | No |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 34 MW |
| Net Winter Capacity With Natural Gas | 34 MW |
| Net Summer Capacity With Oil | 34 MW |
| Net Winter Capacity With Oil | 34 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
| Other Limits | Yes |
Generator KY2 Details Out of Service June 1954
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 73.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 72 MW |
| Winter Capacity | 72 MW |
| Minimum Load | 4 MW |
| Uprate/Derate Completed | No |
| Status | Out of Service |
| First Operation Date | June 1954 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | OVER |
| Other Planned Modifications | No |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 72 MW |
| Net Winter Capacity With Natural Gas | 72 MW |
| Net Summer Capacity With Oil | 72 MW |
| Net Winter Capacity With Oil | 72 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
| Other Limits | Yes |
Generator KY4 Details Operating December 1971
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 53.1 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 59 MW |
| Winter Capacity | 62.5 MW |
| Minimum Load | 6 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 1971 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Other Planned Modifications | No |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 59 MW |
| Net Winter Capacity With Natural Gas | 62.5 MW |
| Net Summer Capacity With Oil | 59 MW |
| Net Winter Capacity With Oil | 62.5 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
| Other Limits | Yes |
Generator KY6 Details Operating June 1973
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 60.3 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 53 MW |
| Winter Capacity | 62 MW |
| Minimum Load | 6 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 1973 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Other Planned Modifications | No |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 53 MW |
| Net Winter Capacity With Natural Gas | 62 MW |
| Net Summer Capacity With Oil | 53 MW |
| Net Winter Capacity With Oil | 62 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
| Other Limits | Yes |
Generator KY5 Details Operating July 1973
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 60.3 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 53 MW |
| Winter Capacity | 62 MW |
| Minimum Load | 6 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 1973 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Other Planned Modifications | No |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 53 MW |
| Net Winter Capacity With Natural Gas | 62 MW |
| Net Summer Capacity With Oil | 53 MW |
| Net Winter Capacity With Oil | 62 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
| Other Limits | Yes |
Generator KY7 Details Operating October 2002
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | KYS7 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 170 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 148 MW |
| Winter Capacity | 167 MW |
| Minimum Load | 90 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | October 2002 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
|---|---|
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Planned Net Summer Capacity Uprate | 17 MW |
| Planned Net Winter Capacity Uprate | 17 MW |
| Planned Uprate | June 2025 |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator KY7A Details Operating October 2002
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | KYS7 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| Nameplate Capacity | 122 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 106 MW |
| Winter Capacity | 110 MW |
| Minimum Load | 90 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | October 2002 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Kyrene Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #443 | Richmond Cogen | Richmond, CA | 969.6 GWh |
| #444 | Delaware City Plant | Delaware City, DE | 1.1 TWh |
| #445 | Shell Deer Park | Deer Park, TX | 1.2 TWh |
| #446 | Air Products Port Arthur | Port Arthur, TX | 998.1 GWh |
| #447 | Bayonne Energy Center | Bayonne, NJ | 924.9 GWh |
| #448 | George M Sullivan Generation Plant 2 | Anchorage, AK | 923.3 GWh |
| #449 | Stryker Creek | Jacksonville, TX | 921.7 GWh |
| #450 | Rio Grande | SunLand Park, NM | 920.0 GWh |
| #451 | Bennett Mountain | Mountain Home, ID | 919.1 GWh |
| #452 | Anadarko Plant | Anadarko, OK | 911.4 GWh |
| #454 | Panoche Energy Center | Firebaugh, CA | 906.9 GWh |
| #455 | Cannon Falls Energy Center | Cannon Falls, MN | 898.8 GWh |
| #456 | Clark (NVE) | Las Vegas, NV | 896.4 GWh |
| #457 | Ocean State Power II | Harrisville, RI | 896.8 GWh |
| #458 | Holland Energy Park | Holland, MI | 892.9 GWh |
| #459 | Nebo Power Station | Payson, UT | 875.1 GWh |
| #460 | J K Smith | Winchester, KY | 872.7 GWh |
| #461 | Astoria Generating Station | Astoria, NY | 870.9 GWh |
| #462 | Rathdrum | Rathdrum, ID | 866.3 GWh |
| #463 | Whitewater Generating Station | Whitewater, WI | 863.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Kyrene.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Agua Fria | Glendale, AZ | 243.5 GWh | 21.3 mi |
| Arizona State University CHP | Tempe, AZ | 40.2 GWh | 4.3 mi |
| AZ State University - Tempe Campus Solar | Tempe, AZ | 1.1 GWh | 4.8 mi |
| Banner Solar Ironwood | Queen Creek, AZ | 3.8 GWh | 23.4 mi |
| Estrella Mountain PV | Avondale, AZ | 3.8 GWh | 23.7 mi |
| Gilbert Solar Facility I, LLC | Gilbert, AZ | 3.8 GWh | 7.7 mi |
| Intel - Ocotillo Campus Solar | Chandler, AZ | 2.3 GWh | 8.1 mi |
| Jewish Community Center PV | Scottsdale, AZ | 1.8 GWh | 17.1 mi |
| Macys Goodyear | Goodyear, AZ | 3.1 GWh | 27.9 mi |
| Mesa Carport PV | Mesa, AZ | 7.5 GWh | 19.2 mi |
| Ocotillo | Tempe, AZ | 473.2 GWh | 4.8 mi |
| Paradise Valley H.S. PV | Phoenix, AZ | 2.1 GWh | 20.1 mi |
| Phoenix Airport East Economy Lot | Phoenix, AZ | 1.3 GWh | 6.1 mi |
| Phoenix Airport Rental Car Center | Phoenix, AZ | 4.4 GWh | 8.2 mi |
| Queen Creek Solar Farm | Queen Creek, AZ | 40.7 GWh | 19.6 mi |
| Santan | Gilbert, AZ | 5.8 TWh | 10.8 mi |
| Stewart Mountain | Phoenix, AZ | 45.7 GWh | 27.2 mi |
| T0588 Phoenix - AZ | Phoenix, AZ | 2.1 GWh | 17.5 mi |
| TJX Phoenix | Phoenix, AZ | 5.0 GWh | 14.7 mi |
| West Phoenix | Phoenix, AZ | 4.2 TWh | 14.2 mi |