Lockhart ESS, LLC
43880 Harper Lake Road, Hinkley, CA 92347Plant Summary Information
Lockhart ESS, LLC is ranked #5 out of 41 electricity used for energy storage power plants nationwide in terms of total annual net electricity generation.
Lockhart ESS, LLC is comprised of 1 generator and generated 3.7 GWh during the 3-month period between February 2025 to May 2025.
Plant Name | Lockhart ESS, LLC |
---|---|
Utility Name | Terra-Gen Operating Co-Solar |
Location | San Bernardino County, CA |
Initial Operation Date | July 2024 |
Last Update | May 2025 |
Annual Generation | 27.7 GWh |
Annual Consumption | 0 MMBtu |
Ranked #4,795 out of 12,312 Power Plants Nationwide | |
Ranked #5 out of 41 Electricity Used For Energy Storage Power Plants Nationwide | |
Ranked #632 out of 1,568 California Power Plants | |
Ranked #1 out of 9 California Electricity Used For Energy Storage Power Plants | |
Fuel Types | Electricity used for energy storage |
Map of Lockhart ESS, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lockhart ESS, LLC.
Monthly Net Generation for Lockhart ESS, LLC
Lockhart ESS, LLC Details
Summary Information | |
---|---|
Plant Name | Lockhart ESS, LLC (66946) |
Plant Address | 43880 Harper Lake Road, Hinkley, CA 92347 |
Utility | Terra-Gen Operating Co-Solar (61950) |
Latitude, Longitude | 35.03246, -117.35673 |
Generation Dates on File | Jul 2024 to May 2025 |
Initial Operation Date | July 2024 |
Annual Generation | 27.7 GWh |
Fuel Types | Electricity used for energy storage |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 220.00 kV |
Energy Storage | Yes |
Generator LHESS Details Operating July 2024
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 45 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 45 MW |
Winter Capacity | 45 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2024 |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Carbon Capture Technology | No |
Multiple Fuels | No |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 180 |
---|---|
Maximum Charge Rate | 45 MW |
Maximum Discharge Rate | 45 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 4 |
Storage Enclosure Type | CS |
Arbitrage | P |
Independent | No |
Direct Support Of Another Unit | No |
Support T D Asset | No |
Lockhart ESS, LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Electricity used for energy storage.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1 | Atrisco Energy Storage | Rio Rancho, NM | 166.0 GWh |
#2 | Sun Streams 3 | Arlington, AZ | 692.1 GWh |
#3 | Dickens | Afton, TX | 30.1 GWh |
#4 | Five Wells Solar Center - Hybrid | Rogers, TX | 762.5 GWh |
#6 | Hydra | Fort Stockton, TX | 27.6 GWh |
#7 | Paleo | Abernathy, TX | 26.6 GWh |
#8 | Pavo | Fort Stockton, TX | 17.8 GWh |
#9 | Longhorn Storage | Cisco, TX | 13.2 GWh |
#10 | GFTX BESS | Austin, TX | 11.6 GWh |
#11 | Tortolas | Alvin, TX | 7.2 GWh |
#12 | Connolly BESS | Decatur, TX | 7.1 GWh |
#13 | Cascade Energy Storage, LLC | Stockton, CA | 6.4 GWh |
#14 | Libra Storage | Seguin, TX | 6.3 GWh |
#15 | BCE Los Alamitos 1 | Los Alamitos, CA | 25.6 GWh |
#16 | Sun Valley Storage | Abbot, TX | 3.1 GWh |
#17 | Keenesburg Battery Storage | Keenesburg, CO | 1.1 GWh |
#18 | Rattlesnake Ridge Battery Storage | Hudson, CO | 1.0 GWh |
#19 | Horn Rapids Solar, Storage and Training | Richland, WA | 6.6 GWh |
#20 | Bromley Battery Storage | Brighton, CO | 865.0 MWh |
#21 | Parkway Battery Storage | Broomfield, CO | 719.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Lockhart ESS, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alamo Solar | Oro Grande, CA | 47.7 GWh | 24.2 mi |
Baldy Mesa 2_Silver Peak Hybrid | Adelanto, CA | 34.7 GWh | 29.8 mi |
Baldy Mesa Solar & Storage | Adelanto, CA | 138.2 GWh | 29.8 mi |
Daggett 2 | Daggett, CA | 535.0 GWh | 30.8 mi |
Daggett 3 | Daggett, CA | 879.7 GWh | 30.8 mi |
Expressway Solar A | Victorville, CA | 4.5 GWh | 31.1 mi |
Expressway Solar B | Victorville, CA | 4.0 GWh | 31 mi |
Expressway Solar C2 | Victorville, CA | 3.3 GWh | 31 mi |
High Desert Power Plant | Victorville, CA | 3.7 TWh | 30.2 mi |
Hudson - High Desert Hybrid | Victorville, CA | 280.8 GWh | 27.4 mi |
Lockhart Solar PV II | Hinkley, CA | 195.8 GWh | 0.9 mi |
Lockhart Solar PV, LLC | Hinkley, CA | 230.6 GWh | 0.1 mi |
Madelyn Solar, LLC | Silver Lake, CA | 2.7 GWh | 18.3 mi |
Mitchell Solar, LLC | Silver Lake, CA | 3.7 GWh | 18.6 mi |
Mojave Solar Project | Hinkley, CA | 596.5 GWh | 1.4 mi |
Resurgence Solar | Boron, CA | 247.8 GWh | 10.8 mi |
Resurgence Solar II | Boron, CA | 132.9 GWh | 10.8 mi |
Rudy Solar, LLC | Silver Lake, CA | 3.7 GWh | 18.5 mi |
SEGS IX | Hinkley, CA | 112.0 GWh | 1.1 mi |
US Borax | Boron, CA | 288.2 GWh | 19.5 mi |