Parkway Battery Storage
1770 W 160TH AVE,, Broomfield, CO 80023Plant Summary Information
Parkway Battery Storage is ranked #19 out of 41 electricity used for energy storage power plants nationwide in terms of total annual net electricity generation.
Parkway Battery Storage is comprised of 1 generator and generated 305.0 MWh during the 3-month period between September 2024 to December 2024.
Plant Name | Parkway Battery Storage |
---|---|
Utility Name | United Power, Inc |
Location | Broomfield County, CO |
Initial Operation Date | May 2024 |
Last Update | Dec 2024 |
Annual Generation | 719.0 MWh |
Annual Consumption | 0 MMBtu |
Ranked #11,335 out of 12,299 Power Plants Nationwide | |
Ranked #19 out of 41 Electricity Used For Energy Storage Power Plants Nationwide | |
Ranked #274 out of 283 Colorado Power Plants | |
Ranked #4 out of 8 Colorado Electricity Used For Energy Storage Power Plants | |
Fuel Types | Electricity used for energy storage |
Map of Parkway Battery Storage
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Parkway Battery Storage.
Monthly Net Generation for Parkway Battery Storage
Parkway Battery Storage Details
Summary Information | |
---|---|
Plant Name | Parkway Battery Storage (67301) |
Plant Address | 1770 W 160TH AVE,, Broomfield, CO 80023 |
Utility | United Power, Inc (19499) |
Latitude, Longitude | 39.98569, -105.01044 |
Generation Dates on File | May 2024 to Dec 2024 |
Initial Operation Date | May 2024 |
Annual Generation | 719.0 MWh |
Fuel Types | Electricity used for energy storage |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Public Service Company of Colorado (PSCO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | United Power, Inc (19499) CO |
Grid Voltage | 13.20 kV |
Energy Storage | Yes |
Generator PKWBA Details Operating May 2024
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 7.8 MW |
Summer Capacity | 7.8 MW |
Winter Capacity | 7.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2024 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Electricity used for energy storage |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 31.3 |
---|---|
Maximum Charge Rate | 7.8 MW |
Maximum Discharge Rate | 7.8 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 3.1 |
Storage Enclosure Type | CS |
Arbitrage | P |
Ramping Spinning Reserve | Yes |
Transmission And Distribution Deferral | Yes |
System Peak Shaving | Yes |
Ac Coupled | No |
Independent | No |
Direct Support Of Another Unit | No |
Support T D Asset | Yes |
Parkway Battery Storage Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Ameresco | 1820 Midpark RoadSuite C, Knoxville, TN 37921 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Electricity used for energy storage.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#9 | GFTX BESS | Austin, TX | 11.8 GWh |
#10 | Connolly BESS | Decatur, TX | 8.1 GWh |
#11 | Longhorn Storage | Cisco, TX | 6.6 GWh |
#12 | BCE Los Alamitos 1 | Los Alamitos, CA | 25.6 GWh |
#13 | Cascade Energy Storage, LLC | Stockton, CA | 4.9 GWh |
#14 | Tortolas | Alvin, TX | 4.7 GWh |
#15 | Keenesburg Battery Storage | Keenesburg, CO | 1.1 GWh |
#16 | Rattlesnake Ridge Battery Storage | Hudson, CO | 1.0 GWh |
#17 | Horn Rapids Solar, Storage and Training | Richland, WA | 6.6 GWh |
#18 | Bromley Battery Storage | Brighton, CO | 865.0 MWh |
#20 | West Ford Flat | Middletown, CA | 696.0 MWh |
#21 | Mead Battery Storage | Longmont, CO | 691.0 MWh |
#22 | Davis Battery Storage | Fort Lupton, CO | 672.0 MWh |
#23 | GMP Solar/Storage-Ferrisburgh Hybrid | Ferrisburgh, VT | 8.7 GWh |
#24 | GMP Solar/Storage-Essex Hybrid | Essex, VT | 7.7 GWh |
#25 | Platte Valley Battery Storage | Longmont, CO | 507.0 MWh |
#26 | Orange Coast College PH2 Solar Project | Costa Mesa, CA | 4.6 GWh |
#27 | GMP Solar/Storage-Milton Hybrid | Milton, VT | 8.4 GWh |
#28 | Burksol Energy Storage | Afton, TX | 379.0 MWh |
#29 | Lone Star Solar | Cameron, SC | 49.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Parkway Battery Storage.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Brighton PV Solar Plant | Brighton, CO | 3.3 GWh | 3.7 mi |
Bromley Battery Storage | Brighton, CO | 865.0 MWh | 12.8 mi |
Cherokee | Denver, CO | 3.4 TWh | 12.6 mi |
City of Boulder WWTP | Boulder, CO | 1.2 GWh | 10 mi |
Fort Lupton | Ft. Lupton, CO | 12.4 GWh | 13.5 mi |
Frederick Battery Storage | Frederick, CO | 311.0 MWh | 8.3 mi |
Front Range Project | Erie, CO | 18.6 GWh | 3 mi |
IBM Solar | Boulder, CO | 10.6 GWh | 12.9 mi |
Jack's Solar Garden | Longmont, CO | 2.2 GWh | 11.4 mi |
Jeffco Community Solar Gardens LLC | Arvada, CO | 2.6 GWh | 11.4 mi |
Lafayette Horizon Solar CSG LLC | Lafayette, CO | 3.6 GWh | 2.8 mi |
Metro Wastewater Reclamation District | Denver, CO | 37.1 GWh | 12.6 mi |
Plains End | Arvada, CO | 6.1 GWh | 14.5 mi |
Plains End II LLC | Arvada, CO | 10.3 GWh | 14.4 mi |
Platte Valley Battery Storage | Longmont, CO | 507.0 MWh | 8.8 mi |
Spindle Hill Energy Center | Fort Lupton, CO | 526.1 GWh | 9.8 mi |
TruStile Doors - Denver | Denver, CO | 2.1 GWh | 11.2 mi |
University of Colorado | Boulder, CO | 4.6 GWh | 13.8 mi |
Valmont | Boulder, CO | 19.7 GWh | 10.4 mi |
Valmont Combustion Turbine Project | Boulder, CO | 46.0 GWh | 10.4 mi |