1349 River Road, Middletown, CT 6457Plant Summary Information
Kleen Energy Systems Project is ranked #6 out of 161 power plants in Connecticut in terms of total annual net electricity generation.
Kleen Energy Systems Project is comprised of 3 generators and generated 1.0 TWh during the 3-month period between May 2025 to August 2025.
| Plant Name | Kleen Energy Systems Project |
|---|---|
| Utility Name | Kleen Energy Systems, LLC |
| Location | Lower Connecticut River Valley Planning Region, CT |
| Initial Operation Date | July 2011 |
| Last Update | Aug 2025 |
| Annual Generation | 3.1 TWh |
| Annual Consumption | 25.2 M MMBtu |
| Ranked #370 out of 12,529 Power Plants Nationwide | |
| Ranked #220 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #6 out of 161 Connecticut Power Plants | |
| Ranked #5 out of 53 Connecticut Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 99.3% Distillate Fuel Oil : 0.7% |
Map of Kleen Energy Systems Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Kleen Energy Systems Project.
Monthly Net Generation for Kleen Energy Systems Project
Kleen Energy Systems Project Details
| Summary Information | |
|---|---|
| Plant Name | Kleen Energy Systems Project (56798) |
| Plant Address | 1349 River Road, Middletown, CT 6457 |
| Utility | Kleen Energy Systems, LLC (55993) |
| Latitude, Longitude | 41.55323, -72.59687 |
| Generation Dates on File | Jul 2011 to Aug 2025 |
| Initial Operation Date | July 2011 |
| Annual Generation | 3.1 TWh |
| Fuel Types | Natural Gas : 99.3% Distillate Fuel Oil : 0.7% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 07-59-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | NPCC |
| Balancing Authority | ISO New England Inc. (ISNE) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | Connecticut River |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Connecticut Light & Power Co (4176) CT |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | Algonquin Gas Transmission Company |
| Natural Gas Storage | No |
Generator ST Details Operating July 2011
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CC01 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| RTO ISO LMP Node Designation | 14614 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 14614 |
| Nameplate Capacity | 295 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 268 MW |
| Winter Capacity | 233 MW |
| Minimum Load | 177 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2011 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator U1 Details Operating July 2011
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC01 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| RTO ISO LMP Node Designation | 14614 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 14614 |
| Nameplate Capacity | 199 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 177 MW |
| Winter Capacity | 195 MW |
| Minimum Load | 120 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2011 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 177 MW |
| Net Winter Capacity With Natural Gas | 195 MW |
| Net Summer Capacity With Oil | 163 MW |
| Net Winter Capacity With Oil | 180 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
| Other Limits | Yes |
Generator U2 Details Operating July 2011
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC01 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| RTO ISO LMP Node Designation | 14614 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 14614 |
| Nameplate Capacity | 199 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 177 MW |
| Winter Capacity | 195 MW |
| Minimum Load | 120 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2011 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 176 MW |
| Net Winter Capacity With Natural Gas | 195 MW |
| Net Summer Capacity With Oil | 163 MW |
| Net Winter Capacity With Oil | 180 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
| Other Limits | Yes |
Kleen Energy Systems Project Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| We couldn't locate any owners for this plant | |||
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #210 | Red Oak Power LLC | Sayreville, NJ | 3.2 TWh |
| #211 | Nelson Energy Center | Rock Falls, IL | 3.2 TWh |
| #212 | Middletown Energy Center | Middletown, OH | 3.2 TWh |
| #213 | Rayburn Energy Station LLC | Sherman, TX | 3.2 TWh |
| #214 | Wolf Hollow I LP | Granbury, TX | 3.2 TWh |
| #215 | Harry Allen | Las Vegas, NV | 3.2 TWh |
| #216 | Zeltmann | Astoria, NY | 3.2 TWh |
| #217 | Bear Garden | New Canton, VA | 3.2 TWh |
| #218 | Riverside Energy Center | Beloit, WI | 3.1 TWh |
| #219 | Wildcat Point Generation Facility | Conowingo, MD | 3.1 TWh |
| #221 | Kings Mountain Energy Center | Kings Mountain, NC | 3.1 TWh |
| #222 | Klamath Cogeneration Plant | Klamath Falls, OR | 3.1 TWh |
| #223 | Sabine River Operations | Orange, TX | 3.1 TWh |
| #224 | Chattahoochee Energy Facility | Franklin, GA | 3.1 TWh |
| #225 | Quail Run Energy Center | Odessa, TX | 3.1 TWh |
| #226 | Granite Ridge | Londonderry, NH | 3.1 TWh |
| #227 | Harding Street | Indianapolis, IN | 3.1 TWh |
| #228 | Delta Energy Center | Pittsburg, CA | 3.0 TWh |
| #229 | Elk Hills Power LLC | Tupman, CA | 3.0 TWh |
| #230 | Bobby C Smith Jr Energy Facility | Rincon, GA | 3.0 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Kleen Energy Systems Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| CCSU Co-Gen-STBY Gen | New Britain, CT | 90.2 MWh | 13 mi |
| CCSU Fuel Cell Project | New Britain, CT | 11.1 GWh | 12.8 mi |
| Corbin Russwin Phase 3 Berlin | Berlin, CT | 1.7 GWh | 9.7 mi |
| CP East Hampton I & II Solar | East Hampton, CT | 3.3 GWh | 14 mi |
| CP Middletown Solar I LLC | Middletown, CT | 1.7 GWh | 5.7 mi |
| CP Middletown Solar II LLC | Middletown, CT | 1.7 GWh | 5.7 mi |
| DWW Solar ll | Simsbury, CT | 51.5 GWh | 6.4 mi |
| FDX010.0 FedEx Fuel Cell | Middletown, CT | 7.9 GWh | 6.7 mi |
| FedEx Middletown | Middletown, CT | 151.0 MWh | 7 mi |
| GenConn Middletown LLC | Middletown, CT | 5.9 GWh | 1 mi |
| Generate Colchester Fuel Cells, LLC | Colchester, CT | 76.7 GWh | 14 mi |
| Manchester Community College North | Great Path, CT | 1.5 GWh | 14.6 mi |
| Middletown | Middletown, CT | 33.0 GWh | 0.9 mi |
| Pratt & Whitney | East Hartford, CT | 79.5 GWh | 13.6 mi |
| Town of Rocky Hill PV CSG | Rocky Hill, CT | 5.1 GWh | 6.5 mi |
| Trinity College Fuel Cell | Hartford, CT | 11.5 GWh | 14.2 mi |
| UDR Glastonbury Fuel Cell | Glastonbury, CT | 17.7 GWh | 11.7 mi |
| Wallingford Energy | Wallingford, CT | 87.8 GWh | 14.3 mi |
| Wallingford Solar | Wallingford, CT | 20.9 GWh | 14.6 mi |
| Wesleyan University Cogen 1 | Middletown, CT | 7.3 GWh | 3 mi |