Irwindale Brew Yard, LLC
15801 First Street, Irwindale, CA 91706Plant Summary Information
Irwindale Brew Yard, LLC is ranked #794 out of 816 solar farms in California in terms of total annual net electricity generation.
Irwindale Brew Yard, LLC generated 103.0 MWh during the 3-month period between December 2024 to March 2025.
Plant Name | Irwindale Brew Yard, LLC |
---|---|
Utility Name | Irwindale Brew Yard, LLC |
Location | Los Angeles County, CA |
Initial Operation Date | February 2002 |
Last Update | Mar 2025 |
Annual Generation | 576.0 MWh |
Annual Consumption | 3.6 k MMBtu |
Ranked #11,403 out of 12,288 Power Plants Nationwide | |
Ranked #6,020 out of 6,174 Solar Power Plants Nationwide | |
Ranked #1,531 out of 1,564 California Power Plants | |
Ranked #794 out of 816 California Solar Power Plants | |
Fuel Types | Solar : 99.8% |
Previous Operators |
MillerCoors Irwindale Brewery (2013 to 2018) MolsonCoors Irwindale Brewery (2019 to 2019) Irwindale Brew Yard, LLC (2020 to 2024) |
Map of Irwindale Brew Yard, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Irwindale Brew Yard, LLC.
Monthly Net Generation for Irwindale Brew Yard, LLC
Irwindale Brew Yard, LLC Details
Summary Information | |
---|---|
Plant Name | Irwindale Brew Yard, LLC (58056) |
Plant Address | 15801 First Street, Irwindale, CA 91706 |
Utility | Irwindale Brew Yard, LLC (63952) |
Latitude, Longitude | 34.12167, -117.93833 |
Generation Dates on File | Jan 2012 to Mar 2025 |
Initial Operation Date | February 2002 |
Annual Generation | 576.0 MWh |
Fuel Types | Solar : 99.8% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Beverage and Tobacco Product Manufacturing (312) |
Sector | Industrial Non-CHP (6) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 66.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | SOUTHERN CALIFORNIA GAS COMPANY |
Natural Gas Storage | No |
Generator T100 Details Out of Service February 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 5.2 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 4.1 MW |
Winter Capacity | 4.7 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
Status | Out of Service |
---|---|
First Operation Date | February 2002 |
Combined Heat & Power | No |
Sector Name | Industrial Non-CHP (6) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator T200 Details Out of Service February 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 5.2 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 4.1 MW |
Winter Capacity | 4.7 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
Status | Out of Service |
---|---|
First Operation Date | February 2002 |
Combined Heat & Power | No |
Sector Name | Industrial Non-CHP (6) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator JEN1 Details OA July 2007
Technology | Other Waste Biomass |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.5 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | OA |
---|---|
First Operation Date | July 2007 |
Combined Heat & Power | No |
Sector Name | Industrial Non-CHP (6) |
Energy Source | Other Biomass Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator PV Details Operating March 2015
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 2.5 MW |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2015 |
---|---|
Combined Heat & Power | No |
Sector Name | Industrial Non-CHP (6) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 28 |
Tilt Angle | 28 |
DC Net Capacity | 3.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Irwindale Brew Yard, LLC Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#6010 | Denver Braswell PV | Moultrie, GA | 614.0 MWh |
#6011 | South River H4 Solar Energy Storage | Autryville, NC | 595.0 MWh |
#6012 | Lincoln Solar | Merrillville, IN | 608.0 MWh |
#6013 | Pivot Energy Minnesota Solar 10 | Greenwald, MN | 600.0 MWh |
#6014 | Chambers 4 - San Bernardino SNA7 | San Bernardino, CA | 595.0 MWh |
#6015 | Back River Waste Water Treatment | Baltimore, MD | 594.0 MWh |
#6016 | La Senita | Kingman, AZ | 593.0 MWh |
#6017 | Waterloo Solar, LLC | Waterloo, IN | 592.0 MWh |
#6018 | NY Hermon 1040 County Rd 21 | Hermon, NY | 589.0 MWh |
#6019 | FTF-PackingShed | Reedley, CA | 581.0 MWh |
#6021 | DE Solar 657 Brigham Rd | Greensboro, NC | 580.0 MWh |
#6022 | DSI Don Solar | Renville, MN | 579.0 MWh |
#6023 | IMPA Richmond Solar Park | Richmond, IN | 578.0 MWh |
#6024 | Hopewell Valley High School Hybrid | Pennington, NJ | 570.0 MWh |
#6025 | Hamlet Solar Energy Storage | Hamlet, NC | 550.0 MWh |
#6026 | Arlington Microgrid | Arlington, WA | 532.0 MWh |
#6027 | VA- US Foods- Manassas | Manassas, VA | 552.0 MWh |
#6028 | CA - Fresno County - Juvenile Hall | Fresno, CA | 552.0 MWh |
#6029 | Lightfoot Solar, LLC | Luzerne, MI | 548.0 MWh |
#6030 | 3100 Valleyview Drive | Columbus, OH | 548.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Irwindale Brew Yard, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Blacksand Generating Facility | Brea, CA | 39.0 GWh | 13.9 mi |
Brea Expansion Plant | Brea, CA | 244.4 GWh | 14.3 mi |
California Institute of Technology | Pasadena, CA | 58.7 GWh | 10.8 mi |
CalTech - Pasadena | Pasadena, CA | 6.8 GWh | 10.9 mi |
CalTech - Pasadena (PPA) | Pasadena, CA | 8.7 GWh | 10.5 mi |
CalTech - Pasadena Wilson Ave | Pasadena, CA | 10.1 GWh | 10.9 mi |
Caltech Central | Pasadena, CA | 8.7 GWh | 10.8 mi |
Gilead Sciences La Verne Rooftop Solar | La Verne, CA | 2.5 GWh | 9.1 mi |
Glenarm | Pasadena, CA | 38.5 GWh | 12.1 mi |
Industry MetroLink PV 1 | Industry, CA | 1.1 GWh | 9.4 mi |
Kroger La Habra | La Habra, CA | 1.7 GWh | 13.8 mi |
Lafayette 2 - Internal Services Dept | Los Angeles, CA | 2.6 GWh | 14.7 mi |
MM West Covina | West Covina, CA | 39.9 GWh | 6.4 mi |
Puente Hills Energy Recovery | Whittier, CA | 158.3 GWh | 8.4 mi |
Ratkovich Alhambra | Alhambra, CA | 8.0 GWh | 12.5 mi |
San Dimas Wash Generating Station | San Dimas, CA | 4.8 GWh | 7.6 mi |
San Gabriel Hydro Project | Azusa, CA | 4.9 GWh | 7.4 mi |
Walnut Creek Energy Park | Industry, CA | 209.6 GWh | 7.8 mi |
Walnut Unified School District Walnut HS | Walnut, CA | 809.0 MWh | 8.5 mi |
Weymouth Solar Plant | La Verne, CA | 5.0 GWh | 9 mi |