New Milford Gas Recovery
182-2 Danbury Road, New Milford, CT 6776Plant Summary Information
New Milford Gas Recovery is ranked #1 out of 1 landfill gas power plants in Connecticut in terms of total annual net electricity generation.
New Milford Gas Recovery is comprised of 2 generators and generated 1.1 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | New Milford Gas Recovery |
---|---|
Utility Name | WM Renewable Energy LLC |
Location | Western Connecticut Planning Region, CT |
Initial Operation Date | May 2008 |
Last Update | Dec 2024 |
Annual Generation | 4.7 GWh |
Annual Consumption | 68.5 k MMBtu |
Ranked #8,016 out of 12,288 Power Plants Nationwide | |
Ranked #256 out of 292 Landfill Gas Power Plants Nationwide | |
Ranked #83 out of 158 Connecticut Power Plants | |
Ranked #1 out of 1 Connecticut Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Map of New Milford Gas Recovery
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for New Milford Gas Recovery.
Monthly Net Generation for New Milford Gas Recovery
New Milford Gas Recovery Details
Summary Information | |
---|---|
Plant Name | New Milford Gas Recovery (50564) |
Plant Address | 182-2 Danbury Road, New Milford, CT 6776 |
Utility | WM Renewable Energy LLC (54842) |
Latitude, Longitude | 41.54767, -73.42524 |
Generation Dates on File | Jan 2001 to Dec 2024 |
Initial Operation Date | May 2008 |
Annual Generation | 4.7 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 87-200-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Connecticut Light & Power Co (4176) CT |
Grid Voltage | 14.00 kV |
Energy Storage | No |
Generator GEN2 Details Operating May 2008
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | Zonal |
RTO ISO Location Designation For Reporting Wholesale Sales Data | Zonal |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2008 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN4 Details Operating May 2008
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | Zonal |
RTO ISO Location Designation For Reporting Wholesale Sales Data | Zonal |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.98 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2008 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
New Milford Gas Recovery Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#246 | Norther Tier Landfill | Burlington, PA | 6.2 GWh |
#247 | Twin Bridges LFGTE | Danville, IN | 6.1 GWh |
#248 | Waste Management Northern Oaks LFGTE | Harrison, MI | 5.9 GWh |
#249 | MM Taunton Energy | Taunton, MA | 5.8 GWh |
#250 | Sonoma Central Landfill Phase I | Petaluma, CA | 5.6 GWh |
#251 | Roseburg LFG | Roseburg, OR | 5.5 GWh |
#252 | Sonoma Central Landfill Phase II | Petaluma, CA | 5.0 GWh |
#253 | Henrico | Glen Allen, VA | 5.2 GWh |
#254 | Horry Land Fill Gas Site | Conway, SC | 4.8 GWh |
#255 | Moretown | Waterbury, VT | 4.8 GWh |
#257 | Glasgow LFGTE | Glasgow, KY | 4.7 GWh |
#258 | Hernando | Brooksville, FL | 4.7 GWh |
#259 | Beecher Gas Recovery | Beecher, IL | 4.7 GWh |
#260 | Santa Cruz Energy | Santa Cruz, CA | 4.6 GWh |
#261 | Onalaska Campus Landfill Biogas | Onalaska, WI | 4.3 GWh |
#262 | Blue Ridge Generating | Irvine, KY | 4.2 GWh |
#263 | CII Methane Management III LFG Plant | Winterville, GA | 3.9 GWh |
#264 | Inst and Envir Dir Marine Logistics Base | Albany, GA | 3.9 GWh |
#265 | MCLB Landfill Gas to Energy | Albany, GA | 3.8 GWh |
#266 | Munster Landfill Gas-to-Energy | Munster, IN | 3.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding New Milford Gas Recovery.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bulls Bridge | New Milford, CT | 30.8 GWh | 8.4 mi |
CPV Towantic Energy Center | Oxford, CT | 5.6 TWh | 16.3 mi |
Cricket Valley Energy | Dover, NY | 3.9 TWh | 12 mi |
Danbury Hospital Cogen Plant | Danbury, CT | 28.1 GWh | 9.9 mi |
Derby Fuel Cell | Derby, CT | 105.9 GWh | 22.8 mi |
Derby Hydro | Shelton, CT | 23.9 GWh | 22.8 mi |
DOCCS Greenhaven | Stormville, NY | 6.3 GWh | 15.4 mi |
Dover CSG | Dover Plains, NY | 2.3 GWh | 12.1 mi |
East Fishkill CSG | East Fishkill, NY | 3.4 GWh | 20.9 mi |
Franklin Drive | Torrington, CT | 118.0 MWh | 23.6 mi |
JB-Tobin 2 | La Grange, NY | 1.9 GWh | 21.9 mi |
Kimberly Clark-Unit 1,2,3 | New Milford, CT | 219.0 GWh | 1 mi |
Millbrook School | Millbrook, NY | 1.8 GWh | 22.9 mi |
Phillips Route 82 Solar LLC | East Fishkill, NY | 8.3 GWh | 18.2 mi |
Shepaug | Southbury, CT | 116.6 GWh | 9.6 mi |
Stevenson | Monroe, CT | 95.8 GWh | 17.4 mi |
Torrington Terminal | Torrington, CT | 146.0 MWh | 22.3 mi |
Union Vale | Lagrangeville, NY | 1.3 GWh | 18.1 mi |
Waterbury Generation | Waterbury, CT | 43.8 GWh | 19.8 mi |
Watertown Solar One, LLC | Watertown, CT | 2.9 GWh | 15.1 mi |