158th Fighter Wing Solar Farm is ranked #53 out of 54 solar farms in Vermont in terms of total annual net electricity generation.
158th Fighter Wing Solar Farm generated 215.0 MWh during the 3-month period between September 2023 to December 2023.
| Plant Name | 158th Fighter Wing Solar Farm |
|---|---|
| Utility Name | 158th Fighter Wing |
| Location | Chittenden County, VT |
| Initial Operation Date | September 2011 |
| Last Update | Dec 2023 |
| Annual Generation | 1.3 GWh |
| Annual Consumption | 4.4 k MMBtu |
| Ranked #11,294 out of 12,539 Power Plants Nationwide | |
| Ranked #5,986 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #102 out of 114 Vermont Power Plants | |
| Ranked #53 out of 54 Vermont Solar Power Plants | |
| Fuel Types | Solar |
Map of 158th Fighter Wing Solar Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for 158th Fighter Wing Solar Farm.
Monthly Net Generation for 158th Fighter Wing Solar Farm
158th Fighter Wing Solar Farm Details
| Summary Information | |
|---|---|
| Plant Name | 158th Fighter Wing Solar Farm (60542) |
| Plant Address | 30 Falcon St, South Burlington, VT 5403 |
| Utility | 158th Fighter Wing (60301) |
| Latitude, Longitude | 44.47771, -73.15341 |
| Generation Dates on File | Jan 2016 to Dec 2023 |
| Initial Operation Date | September 2011 |
| Annual Generation | 1.3 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | NPCC |
| Balancing Authority | ISO New England Inc. (ISNE) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Green Mountain Power Corp (7601) VT |
| Grid Voltage | 12.00 kV |
| Energy Storage | No |
Generator 900 Details Operating September 2011
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1.3 MW |
| Summer Capacity | 1.3 MW |
| Winter Capacity | 1.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 2011 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Planned Net Summer Capacity Uprate | 0.5 MW |
| Planned Net Winter Capacity Uprate | 0.5 MW |
| Planned Uprate | July 2025 |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | No |
|---|---|
| Dual Axis Tracking | Yes |
| Fixed Tilt | Yes |
| Azimuth Angle | 170 |
| Tilt Angle | 30 |
| DC Net Capacity | 1.5 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 1.5 MW |
| Virtual Net Metering Agreement | No |
158th Fighter Wing Solar Farm Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #5976 | NY - Mines Press | Cortlandt, NY | 27.0 MWh |
| #5977 | Newberry Solar 1 LLC | Newberry Springs, CA | 1.3 GWh |
| #5978 | Broadridge Cogen | El Dorado Hills, CA | 15.8 GWh |
| #5979 | Carlson Community (CSG) | Lindstrom, MN | 1.3 GWh |
| #5980 | Marlboro Mushrooms Solar Field | West Grove, PA | 1.3 GWh |
| #5981 | Occidental College Solar Project | Los Angeles, CA | 1.3 GWh |
| #5982 | Waihonu South Solar | Mililani, HI | 1.3 GWh |
| #5983 | Gans Solar | Lake Lynn, PA | 1.3 GWh |
| #5984 | Baldock Solar Highway | Aurora, OR | 1.3 GWh |
| #5985 | Phoenix Airport East Economy Lot | Phoenix, AZ | 1.3 GWh |
| #5987 | CMEEC - Navy NE Trident | Groton, CT | 1.3 GWh |
| #5988 | Webster Solar | Webster, MA | 1.3 GWh |
| #5989 | West Valley High School Solar | Hemet, CA | 1.3 GWh |
| #5990 | San Diego State University | San Diego, CA | 52.4 GWh |
| #5991 | Yankee Street | Centerville, OH | 23.2 GWh |
| #5992 | Pontiac 1A | Pontiac, IL | 1.3 GWh |
| #5993 | CS Murphy Point, LLC | Murphy, NC | 1.3 GWh |
| #5994 | Mountain View Ind Park 1-sline001 | Fontana, CA | 1.3 GWh |
| #5995 | Mariani Packing Vacaville Solar | Vacaville, CA | 1.3 GWh |
| #5996 | L'Oreal Franklin | Somerset, NJ | 1.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding 158th Fighter Wing Solar Farm.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Burlington GT | Burlington, VT | 358.0 MWh | 3.5 mi |
| Chace Mill Winooski One | Winooski, VT | 29.5 GWh | 1.9 mi |
| Charlotte Solar LLC VT | Charlotte, VT | 3.0 GWh | 11 mi |
| Chittenden County Solar Partners | South Burlington, VT | 2.9 GWh | 2.9 mi |
| Claire Solar Farm | South Burlington, VT | 3.6 GWh | 3.6 mi |
| Clark Falls | Milton, VT | 17.0 GWh | 11 mi |
| Colchester 16 | Colchester, VT | 279.0 MWh | 1.2 mi |
| Essex Junction 19 | Essex Junction, VT | 31.8 GWh | 1.8 mi |
| GMP Solar - Richmond | Richmond, VT | 2.8 GWh | 8 mi |
| GMP Solar - Williston | Williston, VT | 6.2 GWh | 2.6 mi |
| GMP Solar/Storage-Milton Hybrid | Milton, VT | 7.4 GWh | 6.4 mi |
| Gorge 18 | South Burlington, VT | 16.7 GWh | 1.2 mi |
| J C McNeil | Burlington, VT | 228.2 GWh | 2.9 mi |
| Jericho Gravel Solar Farm | Jerico, VT | 2.3 GWh | 9.5 mi |
| Jericho Landfill Solar Farm | Jerico, VT | 1.9 GWh | 8.9 mi |
| Limerick Road Solar Farm | Shelburne, VT | 2.8 GWh | 8.8 mi |
| Milton | Milton, VT | 44.4 GWh | 11.5 mi |
| Peterson | Milton, VT | 31.3 GWh | 11.1 mi |
| VEC Magee Hill Solar | Hinesburgh, VT | 1.7 GWh | 8.8 mi |
| Whitcomb Solar Farm | Essex Junction, VT | 3.4 GWh | 1 mi |