Georgia-Pacific Corp - Nekoosa Mill
301 Point Basse Ave, Nekoosa, WI 54457Plant Summary Information
Georgia-Pacific Corp - Nekoosa Mill is ranked #36 out of 239 power plants in Wisconsin in terms of total annual net electricity generation.
Georgia-Pacific Corp - Nekoosa Mill is comprised of 9 generators and generated 36.7 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Georgia-Pacific Corp - Nekoosa Mill |
|---|---|
| Utility Name | Domtar Industries Inc |
| Location | Wood County, WI |
| Initial Operation Date | January 1912 |
| Last Update | Sep 2025 |
| Annual Generation | 186.3 GWh |
| Annual Consumption | 2.4 M MMBtu |
| Ranked #2,553 out of 12,539 Power Plants Nationwide | |
| Ranked #69 out of 80 Black Liquor Power Plants Nationwide | |
| Ranked #36 out of 239 Wisconsin Power Plants | |
| Ranked #1 out of 4 Wisconsin Black Liquor Power Plants | |
| Fuel Types | Black Liquor : 43.1% Natural Gas : 42.5% Water : 14.4% |
Map of Georgia-Pacific Corp - Nekoosa Mill
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Georgia-Pacific Corp - Nekoosa Mill.
Monthly Net Generation for Georgia-Pacific Corp - Nekoosa Mill
Georgia-Pacific Corp - Nekoosa Mill Details
| Summary Information | |
|---|---|
| Plant Name | Georgia-Pacific Corp - Nekoosa Mill (50395) |
| Plant Address | 301 Point Basse Ave, Nekoosa, WI 54457 |
| Utility | Domtar Industries Inc (5033) |
| Latitude, Longitude | 44.3142, -89.8964 |
| Generation Dates on File | Jan 2001 to Sep 2025 |
| Initial Operation Date | January 1912 |
| Annual Generation | 186.3 GWh |
| Fuel Types | Black Liquor : 43.1% Natural Gas : 42.5% Water : 14.4% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | Yes |
| FERC Cogeneration Docket Number | 93-113-000 |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 93-113-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | (322122) |
| Sector | Industrial CHP (7) |
| Water Source | Wisconsin River |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Wisconsin Power & Light Co (20856) WI |
| Grid Voltage | 690.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | WISCONSIN GAS COMPANY |
| Natural Gas Storage | No |
Generator HY4 Details Operating January 1912
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.6 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.6 MW |
| Winter Capacity | 0.6 MW |
| Minimum Load | 0.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | January 1912 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Industrial CHP (7) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Other Planned Modifications | No |
| Multiple Fuels | No |
Generator HY1 Details Operating January 1917
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.8 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.8 MW |
| Winter Capacity | 0.7 MW |
| Minimum Load | 0.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | January 1917 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Industrial CHP (7) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Other Planned Modifications | No |
| Multiple Fuels | No |
Generator HY2 Details Operating January 1917
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.8 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.8 MW |
| Winter Capacity | 0.7 MW |
| Minimum Load | 0.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | January 1917 |
| Combined Heat & Power | No |
| Sector Name | Industrial CHP (7) |
| Energy Source | Water |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Other Planned Modifications | No |
| Multiple Fuels | No |
Generator HY3 Details Operating January 1923
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.8 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.8 MW |
| Winter Capacity | 0.7 MW |
| Minimum Load | 0.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | January 1923 |
| Combined Heat & Power | No |
| Sector Name | Industrial CHP (7) |
| Energy Source | Water |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Other Planned Modifications | No |
| Multiple Fuels | No |
Generator NHG1 Details Operating January 1926
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.2 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.2 MW |
| Winter Capacity | 0.2 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | January 1926 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Industrial CHP (7) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Other Planned Modifications | No |
| Multiple Fuels | No |
Generator HY5 Details Operating January 1950
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.7 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.7 MW |
| Winter Capacity | 0.6 MW |
| Minimum Load | 0.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | January 1950 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Industrial CHP (7) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Other Planned Modifications | No |
| Multiple Fuels | No |
Generator TG6 Details Operating January 1951
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 6 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 5.7 MW |
| Winter Capacity | 5.5 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | January 1951 |
| Combined Heat & Power | Yes |
| Sector Name | Industrial CHP (7) |
|---|---|
| Topping Or Bottoming | T |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Supercritical Technology | No |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator TG8 Details Operating January 1966
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 16 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 13 MW |
| Winter Capacity | 15 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | January 1966 |
| Combined Heat & Power | Yes |
| Sector Name | Industrial CHP (7) |
|---|---|
| Topping Or Bottoming | T |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Supercritical Technology | No |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator TG14 Details Operating February 1991
| Technology | Wood/Wood Waste Biomass |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 13.1 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 12.5 MW |
| Winter Capacity | 12.1 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | February 1991 |
| Combined Heat & Power | Yes |
| Sector Name | Industrial CHP (7) |
|---|---|
| Topping Or Bottoming | T |
| Energy Source | Black Liquor / Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | Yes |
| Time From Cold Shutdown To Full Load | 12H |
| Fluidized Bed Technology | No |
| Other Planned Modifications | No |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | No |
| Multifuel Details | |
| Cofire Energy Source | BLQ / NG |
|---|---|
Georgia-Pacific Corp - Nekoosa Mill Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Black Liquor.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #59 | IP Springfield Oregon | Springfield, OR | 168.9 GWh |
| #60 | Plant 31 Paper Mill | West Monroe, LA | 523.0 GWh |
| #61 | Hopewell Mill | Hopewell, VA | 286.2 GWh |
| #62 | International Paper Vicksburg Mill | Vicksburg, MS | 232.8 GWh |
| #63 | Pixelle Specialty Solutions LLC - Chilli | Chillicothe, OH | 272.9 GWh |
| #64 | KapStone Kraft Paper Corp | Roanoke Rapids, NC | 179.4 GWh |
| #65 | International Paper Riverdale Mill | Selma, AL | 562.2 GWh |
| #66 | Packaging Corp. of America Jackson Mill | Jackson, AL | 223.3 GWh |
| #67 | U S Alliance Coosa Pines | Coosa Pines, AL | 141.9 GWh |
| #68 | Georgia-Pacific Wauna Mill | Clatskanie, OR | 172.2 GWh |
| #70 | Clearwater Paper APP CB | Arkansas City, AR | 126.2 GWh |
| #71 | Ticonderoga Mill | Ticonderoga, NY | 203.1 GWh |
| #72 | St Francisville Mill | St. Francisville, LA | 110.3 GWh |
| #73 | Mosinee Mill | Mosinee, WI | 117.8 GWh |
| #74 | Interstate Paper LLC Riceboro | Riceboro, GA | 94.3 GWh |
| #75 | Kaukauna Paper Mill | Kaukauna, WI | 106.5 GWh |
| #76 | Georgia-Pacific Toledo Mill | Toledo, OR | 56.2 GWh |
| #77 | Johnsonburg Mill | Johnsonburg, PA | 40.6 GWh |
| #78 | Packaging of America Tomahawk Mill | Tomahawk, WI | 111.3 GWh |
| #79 | Georgia-Pacific Big Island | Big Island, VA | 42.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Georgia-Pacific Corp - Nekoosa Mill.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Adams PV Plant | Adams, WI | 16.8 GWh | 27.3 mi |
| Biron | Biron, WI | 30.9 GWh | 9.9 mi |
| Biron Mill | Wisconsin Rapids, WI | 95.7 GWh | 9.9 mi |
| Castle Rock | Adams, WI | 91.9 GWh | 31.1 mi |
| Du Bay | Eau Pleine, WI | 43.1 GWh | 27.1 mi |
| Marshfield Utilities Gas Plant | Marshfield, WI | 4.0 GWh | 25.1 mi |
| Mosinee Mill | Mosinee, WI | 117.8 GWh | 34.3 mi |
| New Lisbon | New Lisbon, WI | 19.0 MWh | 32.8 mi |
| New Lisbon Solar | New Lisbon, WI | 4.1 GWh | 32.1 mi |
| Petenwell | Necedah, WI | 108.4 GWh | 18.8 mi |
| Port Edwards Mill | Port Edwards, WI | 39.2 GWh | 2.1 mi |
| Stevens Point | Stevens Point, WI | 28.5 GWh | 20.7 mi |
| Stevens Point Mill | Stevens Point, WI | 12.7 GWh | 15.7 mi |
| Wautoma Solar | Wautoma, WI | 187.4 GWh | 34.2 mi |
| Webster Creek (Oak 2) | New Lisbon, WI | 2.9 GWh | 33.7 mi |
| Weston RICE | Kronenwetter, WI | 85.5 GWh | 39.3 mi |
| Whistling Winds DPC Solar | New Lisbon, WI | 1.8 GWh | 25.2 mi |
| Whiting | Whiting, WI | 25.0 GWh | 19.9 mi |
| Wisconsin Rapids | Wisconsin Rapids, WI | 49.9 GWh | 6.5 mi |
| Wood County | Nekoosa, WI | 277.2 GWh | 4.2 mi |