Castle Rock
1976 Edgewood Drive, Adams, WI 53934Plant Summary Information
Castle Rock is ranked #7 out of 66 hydroelectric power plants in Wisconsin in terms of total annual net electricity generation.
Castle Rock is comprised of 5 generators and generated 19.2 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Castle Rock |
---|---|
Utility Name | Wisconsin River Power Company |
Location | Adams County, WI |
Initial Operation Date | August 1950 |
Last Update | Dec 2024 |
Annual Generation | 91.9 GWh |
Annual Consumption | 336.7 k MMBtu |
Ranked #3,343 out of 12,288 Power Plants Nationwide | |
Ranked #362 out of 1,323 Water Power Plants Nationwide | |
Ranked #59 out of 239 Wisconsin Power Plants | |
Ranked #7 out of 66 Wisconsin Water Power Plants | |
Fuel Types | Water |
Map of Castle Rock
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Castle Rock.
Monthly Net Generation for Castle Rock
Castle Rock Details
Summary Information | |
---|---|
Plant Name | Castle Rock (4079) |
Plant Address | 1976 Edgewood Drive, Adams, WI 53934 |
Utility | Wisconsin River Power Company (20863) |
Latitude, Longitude | 43.8656, -89.9514 |
Generation Dates on File | Jan 2001 to Dec 2024 |
Initial Operation Date | August 1950 |
Annual Generation | 91.9 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Wisconsin River |
Ash Impoundment | |
Transmission / Distribution Owner | American Transmission Co (659) WI |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Generator 3 Details Operating October 1950
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Jointly Owned |
RTO ISO LMP Node Designation | WPS.WPSM(50%)/ALTE.ALTE(50%) |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WPS.WPSM(50%)/ALTE.ALTE(50%) |
Nameplate Capacity | 3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.8 MW |
Winter Capacity | 3 MW |
Minimum Load | 1.3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 1950 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 2 Details Operating November 1950
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Jointly Owned |
RTO ISO LMP Node Designation | WPS.WPSM(50%)/ALTE.ALTE(50%) |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WPS.WPSM(50%)/ALTE.ALTE(50%) |
Nameplate Capacity | 3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.8 MW |
Winter Capacity | 3 MW |
Minimum Load | 1.3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 1950 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 4 Details Operating August 1950
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Jointly Owned |
RTO ISO LMP Node Designation | WPS.WPSM(50%)/ALTE.ALTE(50%) |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WPS.WPSM(50%)/ALTE.ALTE(50%) |
Nameplate Capacity | 3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.8 MW |
Winter Capacity | 3 MW |
Minimum Load | 1.3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 1950 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 5 Details Operating August 1950
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Jointly Owned |
RTO ISO LMP Node Designation | WPS.WPSM(50%)/ALTE.ALTE(50%) |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WPS.WPSM(50%)/ALTE.ALTE(50%) |
Nameplate Capacity | 3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.8 MW |
Winter Capacity | 3 MW |
Minimum Load | 1.3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 1950 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 1 Details Operating August 1951
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Jointly Owned |
RTO ISO LMP Node Designation | WPS.WPSM(50%)/ALTE.ALTE(50%) |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WPS.WPSM(50%)/ALTE.ALTE(50%) |
Nameplate Capacity | 3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.8 MW |
Winter Capacity | 3 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 1951 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Castle Rock Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Wisconsin Power & Light Co | 4902 North Biltmore Lane, Madison, WI 53718 | Generator 1 | 50.00% |
Wisconsin Public Service Corp | 231 W. Michigan Street, Milwaukee, WI 53203 | Generator 1 | 50.00% |
Wisconsin Power & Light Co | 4902 North Biltmore Lane, Madison, WI 53718 | Generator 2 | 50.00% |
Wisconsin Public Service Corp | 231 W. Michigan Street, Milwaukee, WI 53203 | Generator 2 | 50.00% |
Wisconsin Power & Light Co | 4902 North Biltmore Lane, Madison, WI 53718 | Generator 3 | 50.00% |
Wisconsin Public Service Corp | 231 W. Michigan Street, Milwaukee, WI 53203 | Generator 3 | 50.00% |
Wisconsin Power & Light Co | 4902 North Biltmore Lane, Madison, WI 53718 | Generator 4 | 50.00% |
Wisconsin Public Service Corp | 231 W. Michigan Street, Milwaukee, WI 53203 | Generator 4 | 50.00% |
Wisconsin Power & Light Co | 4902 North Biltmore Lane, Madison, WI 53718 | Generator 5 | 50.00% |
Wisconsin Public Service Corp | 231 W. Michigan Street, Milwaukee, WI 53203 | Generator 5 | 50.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#352 | River Mill | Estacada, OR | 99.1 GWh |
#353 | Milner Hydro | Murtaugh, ID | 98.7 GWh |
#354 | Tugalo | Tallulah Falls, GA | 97.0 GWh |
#355 | Yates Dam | Tallassee, AL | 96.5 GWh |
#356 | Bucks Creek | Storrie, CA | 96.0 GWh |
#357 | Stevenson | Monroe, CT | 95.8 GWh |
#358 | Clarence Cannon | Monroe City, MO | 95.1 GWh |
#359 | Beaver Dam | Eureka Springs, AR | 94.6 GWh |
#360 | North Highlands | Columbus, GA | 94.0 GWh |
#361 | Holcombe | Holcombe, WI | 92.7 GWh |
#363 | Oxford Dam | Conover, NC | 91.9 GWh |
#364 | Harriman | Whitingham, VT | 91.5 GWh |
#365 | Dearborn | Great Falls, SC | 91.5 GWh |
#366 | Middle Gorge | Bishop, CA | 90.9 GWh |
#367 | Big Cliff | Gates, OR | 90.8 GWh |
#368 | Monroe Street | Spokane, WA | 89.9 GWh |
#369 | Control Gorge | Bishop, CA | 89.7 GWh |
#370 | South Colton | Colton, NY | 89.6 GWh |
#371 | Twin Cities Hydro LLC | St. Paul, MN | 89.5 GWh |
#372 | Big Quinnesec 92 | Iron Mountain, MI | 89.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Castle Rock.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Adams PV Plant | Adams, WI | 16.8 GWh | 14.7 mi |
Columbia (WI) | Pardeville, WI | 5.1 TWh | 37.3 mi |
Elroy | Elroy, WI | 2.0 MWh | 18 mi |
Elroy Solar | Mauston, WI | 2.5 GWh | 9.9 mi |
Georgia-Pacific Corp - Nekoosa Mill | Nekoosa, WI | 195.3 GWh | 31.1 mi |
Kilbourn | Wisconsin Dells, WI | 57.6 GWh | 18.6 mi |
La Farge | La Farge, WI | 5.0 MWh | 39.8 mi |
Lemonweir (Oak 1) | Mauston, WI | 5.9 GWh | 9.3 mi |
New Lisbon | New Lisbon, WI | 19.0 MWh | 10.7 mi |
New Lisbon Solar | New Lisbon, WI | 4.1 GWh | 9.3 mi |
Petenwell | Necedah, WI | 108.4 GWh | 13.7 mi |
Port Edwards Mill | Port Edwards, WI | 40.6 GWh | 32.8 mi |
Portage Solar Plant | Portage, WI | 22.8 GWh | 39.6 mi |
Sauk DPC Solar | Wonewoc, WI | 1.5 GWh | 26.3 mi |
Stevens Point Mill | Stevens Point, WI | 12.7 GWh | 38.3 mi |
Wautoma Solar | Wautoma, WI | 188.1 GWh | 35.1 mi |
Webster Creek (Oak 2) | New Lisbon, WI | 2.9 GWh | 10.2 mi |
Whistling Winds DPC Solar | New Lisbon, WI | 2.9 GWh | 9.5 mi |
Wisconsin Rapids | Wisconsin Rapids, WI | 49.9 GWh | 37 mi |
Wood County | Nekoosa, WI | 276.9 GWh | 28.8 mi |