Petenwell
N11397 18th Av, Necedah, WI 54646Plant Summary Information
Petenwell is ranked #50 out of 239 power plants in Wisconsin in terms of total annual net electricity generation.
Petenwell is comprised of 4 generators and generated 22.1 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Petenwell |
---|---|
Utility Name | Wisconsin River Power Company |
Location | Juneau County, WI |
Initial Operation Date | August 1949 |
Last Update | Dec 2024 |
Annual Generation | 108.4 GWh |
Annual Consumption | 395.3 k MMBtu |
Ranked #3,194 out of 12,299 Power Plants Nationwide | |
Ranked #331 out of 1,323 Water Power Plants Nationwide | |
Ranked #50 out of 239 Wisconsin Power Plants | |
Ranked #4 out of 66 Wisconsin Water Power Plants | |
Fuel Types | Water |
Map of Petenwell
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Petenwell.
Monthly Net Generation for Petenwell
Petenwell Details
Summary Information | |
---|---|
Plant Name | Petenwell (4080) |
Plant Address | N11397 18th Av, Necedah, WI 54646 |
Utility | Wisconsin River Power Company (20863) |
Latitude, Longitude | 44.0572, -90.0217 |
Generation Dates on File | Jan 2001 to Dec 2024 |
Initial Operation Date | August 1949 |
Annual Generation | 108.4 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Wisconsin River |
Ash Impoundment | |
Transmission / Distribution Owner | American Transmission Co (659) WI |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator 2 Details Operating October 1949
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Jointly Owned |
RTO ISO LMP Node Designation | WPS.WPSM(50%)/ALTE.ALTE(50%) |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WPS.WPSM(50%)/ALTE.ALTE(50%) |
Nameplate Capacity | 5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 5 MW |
Winter Capacity | 5 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 1949 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 3 Details Operating November 1949
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Jointly Owned |
RTO ISO LMP Node Designation | WPS.WPSM(50%)/ALTE.ALTE(50%) |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WPS.WPSM(50%)/ALTE.ALTE(50%) |
Nameplate Capacity | 5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 5 MW |
Winter Capacity | 5 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 1949 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 1 Details Operating August 1949
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Jointly Owned |
RTO ISO LMP Node Designation | WPS.WPSM(50%)/ALTE.ALTE(50%) |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WPS.WPSM(50%)/ALTE.ALTE(50%) |
Nameplate Capacity | 5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 5 MW |
Winter Capacity | 5 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 1949 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 4 Details Operating January 1950
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Jointly Owned |
RTO ISO LMP Node Designation | WPS.WPSM(50%)/ALTE.ALTE(50%) |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WPS.WPSM(50%)/ALTE.ALTE(50%) |
Nameplate Capacity | 5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 5 MW |
Winter Capacity | 5 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 1950 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Petenwell Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Wisconsin Power & Light Co | 4902 North Biltmore Lane, Madison, WI 53718 | Generator 1 | 50.00% |
Wisconsin Public Service Corp | 231 W. Michigan Street, Milwaukee, WI 53203 | Generator 1 | 50.00% |
Wisconsin Power & Light Co | 4902 North Biltmore Lane, Madison, WI 53718 | Generator 2 | 50.00% |
Wisconsin Public Service Corp | 231 W. Michigan Street, Milwaukee, WI 53203 | Generator 2 | 50.00% |
Wisconsin Power & Light Co | 4902 North Biltmore Lane, Madison, WI 53718 | Generator 3 | 50.00% |
Wisconsin Public Service Corp | 231 W. Michigan Street, Milwaukee, WI 53203 | Generator 3 | 50.00% |
Wisconsin Power & Light Co | 4902 North Biltmore Lane, Madison, WI 53718 | Generator 4 | 50.00% |
Wisconsin Public Service Corp | 231 W. Michigan Street, Milwaukee, WI 53203 | Generator 4 | 50.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#321 | Harris Dam | Lineville, AL | 115.6 GWh |
#322 | Murray | North Little Rock, AR | 113.5 GWh |
#323 | Smith (NH) | Berlin, NH | 112.2 GWh |
#324 | Minidoka | Rupert, ID | 111.7 GWh |
#325 | Horse Mesa | Apache Junction, AZ | 111.6 GWh |
#326 | Snoqualmie 2 | Snoqualmie, WA | 108.9 GWh |
#327 | Broken Bow Dam | Broken Bow, OK | 108.9 GWh |
#328 | Cabin Creek | Georgetown, CO | 108.8 GWh |
#329 | Rainbow Falls Hydro | Parishville, NY | 108.7 GWh |
#330 | Gem State | Idaho Falls, ID | 108.5 GWh |
#332 | Upper Salmon A | Hagerman, ID | 108.0 GWh |
#333 | Bankhead Dam | Northport, AL | 107.8 GWh |
#334 | Salt Springs | Pioneer, CA | 107.7 GWh |
#335 | Five Falls | Colton, NY | 107.1 GWh |
#336 | Kings River PH | Balch Camp, CA | 106.9 GWh |
#337 | Dale Hollow | Celina, TN | 105.9 GWh |
#338 | Lookout Shoals | Statesville, NC | 105.5 GWh |
#339 | Lemolo 1 | Idleyld Park, OR | 105.2 GWh |
#340 | St Croix Falls | St Croix Falls, WI | 104.9 GWh |
#341 | Goat Rock | Smiths, AL | 104.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Petenwell.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Adams PV Plant | Adams, WI | 16.8 GWh | 18.5 mi |
Biron | Biron, WI | 30.9 GWh | 28.4 mi |
Biron Mill | Wisconsin Rapids, WI | 95.7 GWh | 28.4 mi |
Castle Rock | Adams, WI | 91.9 GWh | 13.7 mi |
Elroy | Elroy, WI | 2.0 MWh | 25.1 mi |
Elroy Solar | Mauston, WI | 2.5 GWh | 22.5 mi |
Georgia-Pacific Corp - Nekoosa Mill | Nekoosa, WI | 193.6 GWh | 18.8 mi |
Kilbourn | Wisconsin Dells, WI | 57.6 GWh | 32.1 mi |
Lemonweir (Oak 1) | Mauston, WI | 5.9 GWh | 22 mi |
New Lisbon | New Lisbon, WI | 19.0 MWh | 14.2 mi |
New Lisbon Solar | New Lisbon, WI | 4.1 GWh | 13.3 mi |
Port Edwards Mill | Port Edwards, WI | 39.8 GWh | 20.8 mi |
Sauk DPC Solar | Wonewoc, WI | 1.5 GWh | 35.2 mi |
Stevens Point Mill | Stevens Point, WI | 12.7 GWh | 29.8 mi |
Wautoma Solar | Wautoma, WI | 188.3 GWh | 35.8 mi |
Webster Creek (Oak 2) | New Lisbon, WI | 2.9 GWh | 15 mi |
Whistling Winds DPC Solar | New Lisbon, WI | 2.9 GWh | 6.4 mi |
Whiting | Whiting, WI | 25.0 GWh | 37.1 mi |
Wisconsin Rapids | Wisconsin Rapids, WI | 49.9 GWh | 25.2 mi |
Wood County | Nekoosa, WI | 277.9 GWh | 17.6 mi |