Weston RICE
2491 Old Hwy 51, Kronenwetter, WI 54455Plant Summary Information
Weston RICE is ranked #17 out of 52 natural gas power plants in Wisconsin in terms of total annual net electricity generation.
Weston RICE is comprised of 7 generators and generated 19.6 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Weston RICE |
---|---|
Utility Name | Wisconsin Public Service Corp |
Location | Marathon County, WI |
Initial Operation Date | July 2023 |
Last Update | Dec 2024 |
Annual Generation | 85.5 GWh |
Annual Consumption | 800.0 k MMBtu |
Ranked #3,427 out of 12,288 Power Plants Nationwide | |
Ranked #940 out of 2,221 Natural Gas Power Plants Nationwide | |
Ranked #61 out of 239 Wisconsin Power Plants | |
Ranked #17 out of 52 Wisconsin Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Weston RICE
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Weston RICE.
Monthly Net Generation for Weston RICE
Weston RICE Details
Summary Information | |
---|---|
Plant Name | Weston RICE (66059) |
Plant Address | 2491 Old Hwy 51, Kronenwetter, WI 54455 |
Utility | Wisconsin Public Service Corp (20860) |
Latitude, Longitude | 44.85637, -89.65402 |
Generation Dates on File | Jul 2023 to Dec 2024 |
Initial Operation Date | July 2023 |
Annual Generation | 85.5 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | RFC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | Yes Lined Operating |
Transmission / Distribution Owner | American Transmission Co (659) |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | WISCONSIN PUB SVC CORP |
Natural Gas Storage | No |
Generator W11 Details Operating July 2023
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Jointly Owned |
Nameplate Capacity | 18.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 18.8 MW |
Winter Capacity | 18.8 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2023 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator W12 Details Operating July 2023
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Jointly Owned |
Nameplate Capacity | 18.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 18.8 MW |
Winter Capacity | 18.8 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2023 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator W13 Details Operating July 2023
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Jointly Owned |
Nameplate Capacity | 18.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 18.8 MW |
Winter Capacity | 18.8 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2023 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator W14 Details Operating July 2023
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Jointly Owned |
Nameplate Capacity | 18.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 18.8 MW |
Winter Capacity | 18.8 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2023 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator W15 Details Operating July 2023
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Jointly Owned |
Nameplate Capacity | 18.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 18.8 MW |
Winter Capacity | 18.8 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2023 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator W16 Details Operating July 2023
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Jointly Owned |
Nameplate Capacity | 18.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 18.8 MW |
Winter Capacity | 18.8 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2023 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator W17 Details Operating July 2023
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Jointly Owned |
Nameplate Capacity | 18.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 18.8 MW |
Winter Capacity | 18.8 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2023 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Weston RICE Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Wisconsin Electric Power Co | 231 W. Michigan Street, Milwaukee, WI 53203 | Generator W11 | 50.00% |
Wisconsin Public Service Corp | 231 W. Michigan Street, Milwaukee, WI 53203 | Generator W11 | 50.00% |
Wisconsin Electric Power Co | 231 W. Michigan Street, Milwaukee, WI 53203 | Generator W12 | 50.00% |
Wisconsin Public Service Corp | 231 W. Michigan Street, Milwaukee, WI 53203 | Generator W12 | 50.00% |
Wisconsin Electric Power Co | 231 W. Michigan Street, Milwaukee, WI 53203 | Generator W13 | 50.00% |
Wisconsin Public Service Corp | 231 W. Michigan Street, Milwaukee, WI 53203 | Generator W13 | 50.00% |
Wisconsin Electric Power Co | 231 W. Michigan Street, Milwaukee, WI 53203 | Generator W14 | 50.00% |
Wisconsin Public Service Corp | 231 W. Michigan Street, Milwaukee, WI 53203 | Generator W14 | 50.00% |
Wisconsin Electric Power Co | 231 W. Michigan Street, Milwaukee, WI 53203 | Generator W15 | 50.00% |
Wisconsin Public Service Corp | 231 W. Michigan Street, Milwaukee, WI 53203 | Generator W15 | 50.00% |
Wisconsin Electric Power Co | 231 W. Michigan Street, Milwaukee, WI 53203 | Generator W16 | 50.00% |
Wisconsin Public Service Corp | 231 W. Michigan Street, Milwaukee, WI 53203 | Generator W16 | 50.00% |
Wisconsin Electric Power Co | 231 W. Michigan Street, Milwaukee, WI 53203 | Generator W17 | 50.00% |
Wisconsin Public Service Corp | 231 W. Michigan Street, Milwaukee, WI 53203 | Generator W17 | 50.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#930 | Ashdown | Ashdown, AR | 566.9 GWh |
#931 | Trigen St. Louis | St Louis, MO | 88.7 GWh |
#932 | Washington County Power LLC | Sandersville, GA | 88.5 GWh |
#933 | Pea Ridge | Pace, FL | 88.2 GWh |
#934 | Wallingford Energy | Wallingford, CT | 87.8 GWh |
#935 | Centrahoma East | Centrahoma, OK | 87.0 GWh |
#936 | Castleton Energy Center | Castleton, NY | 87.1 GWh |
#937 | MJMEUC Generating Station #1 | Laddonia, MO | 86.7 GWh |
#938 | Black Mountain Generating Station | Golden Valley, AZ | 86.4 GWh |
#939 | Winchester Power Park | Winchester, TX | 86.2 GWh |
#941 | Pleasant Valley (MN) | Dexter, MN | 85.9 GWh |
#942 | Handsome Lake Energy LLC | Kennerdell, PA | 84.2 GWh |
#943 | WFEC GenCo LLC | Anadarko, OK | 83.7 GWh |
#944 | Howard Down | Vineland, NJ | 83.6 GWh |
#945 | Iowa State University | Ames, IA | 83.2 GWh |
#946 | Georgia-Pacific Corp - Nekoosa Mill | Nekoosa, WI | 195.3 GWh |
#947 | NASA Johnson Space Center CHP | Houston, TX | 82.7 GWh |
#948 | Pixelle Specialty Solutions LLC - Chilli | Chillicothe, OH | 203.9 GWh |
#949 | Genesis Alkali | Green River, WY | 259.5 GWh |
#950 | Macon Energy Center | Macon, MO | 80.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Weston RICE.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alexander | Merrill, WI | 19.0 GWh | 23.4 mi |
Antigo-Forrest Street Solar Project | Antigo, WI | 279.0 MWh | 29.8 mi |
Biron | Biron, WI | 30.9 GWh | 30.1 mi |
Biron Mill | Wisconsin Rapids, WI | 95.7 GWh | 30.1 mi |
Domtar Paper Company Rothschild | Rothschild, WI | 3.0 GWh | 2.5 mi |
Du Bay | Eau Pleine, WI | 43.1 GWh | 13.2 mi |
Fiber Recovery, Inc. | Ringle, WI | 6.5 GWh | 13.3 mi |
Grandfather Falls | Irma, WI | 80.4 GWh | 31.5 mi |
Marshfield Utilities Gas Plant | Marshfield, WI | 4.0 GWh | 28.1 mi |
Merrill | Merrill, WI | 4.3 GWh | 22.3 mi |
Mosinee Mill | Mosinee, WI | 124.1 GWh | 5.1 mi |
Popple Creek (Clark 1) | Colby, WI | 3.7 GWh | 38.7 mi |
Port Edwards Mill | Port Edwards, WI | 40.6 GWh | 37.4 mi |
Rothschild Biomass Cogen Facility | Rothschild, WI | 152.8 GWh | 2.5 mi |
Stevens Point | Stevens Point, WI | 28.5 GWh | 23.8 mi |
Stevens Point Mill | Stevens Point, WI | 12.7 GWh | 35 mi |
Wausau | Wausau, WI | 18.6 GWh | 7 mi |
Weston | Rothschild, WI | 4.3 TWh | 0.3 mi |
Whiting | Whiting, WI | 25.0 GWh | 25.7 mi |
Wisconsin Rapids | Wisconsin Rapids, WI | 49.9 GWh | 33 mi |