950 Ennis Lake Road, Ennis, MT 59729Plant Summary Information
Madison Dam is ranked #42 out of 70 power plants in Montana in terms of total annual net electricity generation.
Madison Dam is comprised of 4 generators and generated 18.7 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Madison Dam |
---|---|
Utility Name | NorthWestern Energy (MT Hydro) |
Location | Madison County, MT |
Initial Operation Date | September 1906 |
Last Update | Dec 2024 |
Annual Generation | 76.2 GWh |
Annual Consumption | 260.0 k MMBtu |
Ranked #3,534 out of 12,288 Power Plants Nationwide | |
Ranked #408 out of 1,323 Water Power Plants Nationwide | |
Ranked #42 out of 70 Montana Power Plants | |
Ranked #16 out of 23 Montana Water Power Plants | |
Fuel Types | Water |
Previous Operators |
PPL Montana LLC (2013 to 2013) NorthWestern Energy (2014 to 2020) NorthWestern Energy (MT hdro) (2021 to 2021) NorthWestern Energy (MT Hydro) (2022 to 2024) |
Map of Madison Dam
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Madison Dam.
Monthly Net Generation for Madison Dam
Madison Dam Details
Summary Information | |
---|---|
Plant Name | Madison Dam (6422) |
Plant Address | 950 Ennis Lake Road, Ennis, MT 59729 |
Utility | NorthWestern Energy (MT Hydro) (13902) |
Latitude, Longitude | 45.48787, -111.63381 |
Generation Dates on File | Jan 2001 to Dec 2024 |
Initial Operation Date | September 1906 |
Annual Generation | 76.2 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 99-185-000 |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | NorthWestern Energy (NWMT) (NWMT) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Madison River |
Ash Impoundment | No |
Transmission / Distribution Owner | NorthWestern Energy LLC - (MT) (12825) MT |
Grid Voltage | 100.00 kV |
Energy Storage | No |
Generator MAD5 Details Operating December 2021
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 4.1 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 4.1 MW |
Winter Capacity | 4.1 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2021 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Generator MAD6 Details Operating December 2021
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 4.1 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 4.1 MW |
Winter Capacity | 4.1 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2021 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Generator MAD7 Details Operating January 2022
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 4.1 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 4.1 MW |
Winter Capacity | 4.1 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 2022 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 1H |
Generator MAD8 Details Operating March 2022
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 4.1 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 4.1 MW |
Winter Capacity | 4.1 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2022 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 1H |
Madison Dam Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#398 | Narrows PH | Grass Valley, CA | 80.8 GWh |
#399 | South Glens Falls Hydroelectric | South Glens Falls, NY | 80.4 GWh |
#400 | Grandfather Falls | Irma, WI | 80.4 GWh |
#401 | Williams Hydro | Solon, ME | 80.2 GWh |
#402 | Upper Mechanicville | Town of Stillwater, NY | 78.7 GWh |
#403 | Drop 4 | Holtville, CA | 78.2 GWh |
#404 | West Enfield Hydro | West Enfield, ME | 77.5 GWh |
#405 | Amoskeag | Manchester, NH | 76.9 GWh |
#406 | Union Valley | Fresh Pond, CA | 76.5 GWh |
#407 | Bennetts Bridge | Altmar, NY | 76.3 GWh |
#409 | Swan Lake | Ketchikan, AK | 75.5 GWh |
#410 | Blue Lake Hydro | Sitka, AK | 75.4 GWh |
#411 | E J West | Lake Luzerne, NY | 75.4 GWh |
#412 | Stevens Creek | Martinez, GA | 74.5 GWh |
#413 | Arrowrock Hydroelectric Project | Boise, ID | 73.0 GWh |
#414 | London | Handley, WV | 72.9 GWh |
#415 | William F Matson Generating Station | Huntingdon, PA | 72.2 GWh |
#416 | Tallulah Falls | Tallulah Falls, GA | 72.0 GWh |
#417 | Navajo Dam | Farmington, NM | 72.0 GWh |
#418 | Hardy | Newaygo, MI | 71.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Madison Dam.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Apex Solar | Dillon, MT | 159.5 GWh | 56.7 mi |
Ashton | Ashton, ID | 32.6 GWh | 97.6 mi |
Basin Creek Plant | Butte, MT | 193.8 GWh | 52.5 mi |
Big Timber Wind Farm | Big Timber, MT | 68.4 GWh | 99.1 mi |
Broadwater Power Project | Toston, MT | 47.4 GWh | 45.1 mi |
Canyon Ferry | Helena, MT | 275.1 GWh | 80.4 mi |
Chester Diversion Hydroelectric Project | Chester, ID | 7.7 GWh | 101.6 mi |
Dave Gates Generating Station | Anaconda, MT | 473.1 GWh | 73.5 mi |
Falls River Hydro | Ashton, ID | 47.4 GWh | 99.6 mi |
Flint Creek Hydroelectric LLC | Philipsburg, MT | 11.0 GWh | 94.9 mi |
GCC Trident Solar Project | Three Forks, MT | 3.7 GWh | 32.1 mi |
Gordon Butte Wind LLC | Martinsdale, MT | 72.8 GWh | 89.2 mi |
Great Divide Solar, LLC | Canyon Creek, MT | 6.1 GWh | 95.7 mi |
Green Meadow Solar, LLC | Helena, MT | 5.5 GWh | 85.9 mi |
Hauser | Helena, MT | 134.4 GWh | 89.1 mi |
Island Park | Island Park, ID | 17.9 GWh | 74.8 mi |
Lake (WY) | Yellowstone, WY | 515.0 MWh | 90.4 mi |
Mystic | Fishtail, MT | 53.7 GWh | 92.6 mi |
Old Faithful | Yellowstone, WY | 273.0 MWh | 81.5 mi |
Two Dot Wind Farm | Two Dot, MT | 34.8 GWh | 99.6 mi |