Wheaton is ranked #33 out of 50 natural gas power plants in Wisconsin in terms of total annual net electricity generation.

Wheaton is comprised of 5 generators and generated 4.3 GWh during the 3-month period between February 2025 to May 2025.

Plant NameWheaton
Utility NameNorthern States Power Co - Minnesota
LocationChippewa County, WI
Initial Operation DateJanuary 1973
Last Update May 2025
Annual Generation 17.0 GWh
Annual Consumption 393.8 k MMBtu
Ranked #5,552 out of 13,081 Power Plants Nationwide
Ranked #1,442 out of 2,206 Natural Gas Power Plants Nationwide
Ranked #111 out of 260 Wisconsin Power Plants
Ranked #33 out of 50 Wisconsin Natural Gas Power Plants
Fuel Types Natural Gas : 97.4% Distillate Fuel Oil : 2.6%

Map of Wheaton

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Wheaton.

Create Your Account Today

Monthly Net Generation for Wheaton

Monthly Plant Fuel Consumption for Wheaton

Wheaton Details

Summary Information
Plant NameWheaton (4014)
Plant Address3008 80th St, Eau Claire, WI 54701
UtilityNorthern States Power Co - Minnesota (13781)
Latitude, Longitude44.88542, -91.51583
Generation Dates on FileJan 2001 to May 2025
Initial Operation DateJanuary 1973
Annual Generation 17.0 GWh
Fuel Types Natural Gas : 97.4% Distillate Fuel Oil : 2.6%
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusRegulated
NERC RegionMRO
Balancing AuthorityMidcontinent Independent Transmission System Operator, Inc.. (MISO)
NAICS CodeUtilities (22)
Sector Electric Utility (1)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerNorthern States Power Co (13780) WI
Grid Voltage 161.00 kV
Energy StorageNo
 
Natural Gas Information
Local Distribution Company (LDC)NORTHERN STATES PWR CO
Natural Gas StorageNo
Liquefied Natural Gas StorageNo

Generator WHT09 Details Operating October 2025

TechnologyNatural Gas Internal Combustion Engine
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
Nameplate Capacity9.8 MW
Nameplate Power Factor0.84
Summer Capacity9.4 MW
Winter Capacity9.4 MW
Minimum Load4 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateOctober 2025
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingYes
Net Summer Capacity With Natural Gas9 MW
Net Winter Capacity With Natural Gas9 MW
Net Summer Capacity With Oil9 MW
Net Winter Capacity With Oil4 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Storage LimitsYes
Air Permit LimitsYes
Other LimitsYes

Generator WHT10 Details Operating October 2025

TechnologyNatural Gas Internal Combustion Engine
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
Nameplate Capacity9.8 MW
Nameplate Power Factor0.84
Summer Capacity9.4 MW
Winter Capacity9.4 MW
Minimum Load4 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateOctober 2025
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingYes
Net Summer Capacity With Natural Gas9 MW
Net Winter Capacity With Natural Gas9 MW
Net Summer Capacity With Oil9 MW
Net Winter Capacity With Oil4 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Storage LimitsYes
Air Permit LimitsYes
Other LimitsYes

Generator WHT11 Details Operating October 2025

TechnologyNatural Gas Internal Combustion Engine
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
Nameplate Capacity9.8 MW
Nameplate Power Factor0.84
Summer Capacity9.4 MW
Winter Capacity9.4 MW
Minimum Load4 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateOctober 2025
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingYes
Net Summer Capacity With Natural Gas9 MW
Net Winter Capacity With Natural Gas9 MW
Net Summer Capacity With Oil9 MW
Net Winter Capacity With Oil4 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Storage LimitsYes
Air Permit LimitsYes
Other LimitsYes

Generator WHT12 Details Operating October 2025

TechnologyNatural Gas Internal Combustion Engine
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
Nameplate Capacity9.8 MW
Nameplate Power Factor0.84
Summer Capacity9.4 MW
Winter Capacity9.4 MW
Minimum Load4 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateOctober 2025
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingYes
Net Summer Capacity With Natural Gas9 MW
Net Winter Capacity With Natural Gas9 MW
Net Summer Capacity With Oil9 MW
Net Winter Capacity With Oil4 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Storage LimitsYes
Air Permit LimitsYes
Other LimitsYes

Generator WHT13 Details Operating October 2025

TechnologyNatural Gas Internal Combustion Engine
Prime MoverInternal Combustion Engine
OwnershipSingle Owner
Nameplate Capacity9.8 MW
Nameplate Power Factor0.84
Summer Capacity9.4 MW
Winter Capacity9.4 MW
Minimum Load4 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateOctober 2025
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingYes
Net Summer Capacity With Natural Gas9 MW
Net Winter Capacity With Natural Gas9 MW
Net Summer Capacity With Oil9 MW
Net Winter Capacity With Oil4 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Storage LimitsYes
Air Permit LimitsYes
Other LimitsYes

Wheaton Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Natural Gas.

RankPlant NamePlant LocationAnnual Generation
#1432University of Northern IowaCedar Falls, IA24.1 GWh
#1433Medtronic - New Haven 2North Haven, CT16.9 GWh
#1434One PatriotFoxborough, MA16.9 GWh
#1435DCO BurlingtonBurlington, NJ16.8 GWh
#1436Riverside Energy Resource CenterRiverside, CA16.8 GWh
#1437AT&T MiddletownMiddletown, NJ16.8 GWh
#1438UI RCP Woodbridge FCWoodbridge, CT16.7 GWh
#1439ElectrifarmWaterloo, IA16.7 GWh
#1440Bucksport Generation LLCBucksport, ME28.8 GWh
#1441Kaiser - Harbor CityHarbor City, CA16.6 GWh
#1443Heber CityHeber City, UT16.5 GWh
#1444Chowchilla IIChowchilla, CA16.5 GWh
#1445KSR028 Merced Fuel CellSan Leandro, CA16.4 GWh
#1446Altice - ParsippanyParsippany-Troy Hills, NJ16.4 GWh
#1447WaxdaleSturtevant, WI37.2 GWh
#1448FirstEnergy Harrison Power StationHaywood, WV11.1 TWh
#1449Valero Refinery Corpus Christi WestCorpus Christi, TX89.5 GWh
#1450UDR Glastonbury Fuel CellGlastonbury, CT15.8 GWh
#1451Forked RiverForked River, NJ15.7 GWh
#1452Glendive GTGlendive, MT15.9 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Wheaton.

Plant NamePlant LocationAnnual GenerationDistance
BarronBarron, WI382.0 MWh39 mi
Barron Solar ArrayBarron, WI5.8 GWh38.4 mi
Bridge CreekAugusta, WI258.0 MWh20.8 mi
Cedar Falls (WI)Menomonie, WI30.9 GWh18.6 mi
Chippewa FallsChippewa Falls, WI56.1 GWh7 mi
CornellChippewa Falls, WI69.9 GWh26 mi
DellsEau Claire, WI36.9 GWh4 mi
Downsville DPC SolarMenomonee, WI1.7 GWh18.7 mi
Elk MoundElk Mound, WI466.0 MWh2.8 mi
Elk Mound (PV)Elk Mound, WI653.0 MWh4.9 mi
Hay River (Dunn 1)Boyceville, WI2.7 GWh25.1 mi
HolcombeHolcombe, WI81.0 GWh30.1 mi
Jim FallsJim Falls, WI105.3 GWh16.5 mi
Lafayette DPC SolarChippewa Falls, WI1.6 GWh8 mi
Lake HallieChippewa Falls, WI1.0 MWh6.5 mi
MenomonieMenomonie, WI22.7 GWh20.2 mi
New Auburn DPC SolarNew Auburn, WI4.5 GWh22.8 mi
Walleye (Dunn 2)Colefax, WI2.8 GWh15.3 mi
WissotaChippewa Falls, WI118.3 GWh9.3 mi
Wolf River (Chipewa 1)Stanley, WI2.6 GWh27.4 mi