Walleye (Dunn 2)
E 7062 County Rd B, Colefax, WI 54730Plant Summary Information
Walleye (Dunn 2) is ranked #73 out of 112 solar farms in Wisconsin in terms of total annual net electricity generation.
Walleye (Dunn 2) generated 377.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Walleye (Dunn 2) |
|---|---|
| Utility Name | Greenbacker Renewable Energy Corporation |
| Location | Dunn County, WI |
| Initial Operation Date | February 2024 |
| Last Update | Dec 2025 |
| Annual Generation | 2.8 GWh |
| Annual Consumption | 9.6 k MMBtu |
| Ranked #10,108 out of 13,094 Power Plants Nationwide | |
| Ranked #5,086 out of 7,027 Solar Power Plants Nationwide | |
| Ranked #201 out of 260 Wisconsin Power Plants | |
| Ranked #73 out of 112 Wisconsin Solar Power Plants | |
| Fuel Types | Solar |
Map of Walleye (Dunn 2)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Walleye (Dunn 2).
Monthly Net Generation for Walleye (Dunn 2)
Monthly Plant Fuel Consumption for Walleye (Dunn 2)
Walleye (Dunn 2) Details
| Summary Information | |
|---|---|
| Plant Name | Walleye (Dunn 2) (66994) |
| Plant Address | E 7062 County Rd B, Colefax, WI 54730 |
| Utility | Greenbacker Renewable Energy Corporation (60025) |
| Latitude, Longitude | 44.97101, -91.80448 |
| Generation Dates on File | Jan 2024 to Dec 2025 |
| Initial Operation Date | February 2024 |
| Annual Generation | 2.8 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | QF23-1165-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Dunn County Electric Coop (5417) WI |
| Grid Voltage | 12.50 kV |
| Energy Storage | No |
Generator 720 Details Operating February 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1.5 MW |
| Summer Capacity | 1.5 MW |
| Winter Capacity | 1.5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | February 2024 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Fixed Tilt | No |
| Azimuth Angle | 180 |
| DC Net Capacity | 1.83 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Walleye (Dunn 2) Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #5076 | Hinsdale Solar PV | Hinsdale, MA | 2.8 GWh |
| #5077 | KS Solar Six LLC | Hubbardston, MA | 2.8 GWh |
| #5078 | Vista Grande HS at Casa Grande | Casa Grande, AZ | 2.8 GWh |
| #5079 | City of Rosamond (CA) | Rosamond, CA | 2.8 GWh |
| #5080 | Adams Community Solar Garden LLC | Watkins, CO | 2.8 GWh |
| #5081 | Syncarpha Hancock II CSG | Hancock, MA | 2.8 GWh |
| #5082 | ER Salvage Yard | Morrisville, VT | 2.8 GWh |
| #5083 | Freeway Springs | Santa Fe Springs, CA | 2.8 GWh |
| #5084 | Open View Solar Farm | New Haven, VT | 2.8 GWh |
| #5085 | Silvi Gibraltar Rock | Belle Mead, NJ | 2.8 GWh |
| #5087 | Weston Landfill Solar | Weston, MA | 2.8 GWh |
| #5088 | Winchendon Landfill Solar | Winchendon, MA | 2.8 GWh |
| #5089 | Howell CSG | Middletown, NY | 2.8 GWh |
| #5090 | FELPS 3 - Floresville South | Floresville, TX | 2.8 GWh |
| #5091 | FELPS 4 - Floresville South | Floresville, TX | 2.8 GWh |
| #5092 | Aero Solar Facility | Burlington, KY | 2.8 GWh |
| #5093 | Webster Creek (Oak 2) | New Lisbon, WI | 2.8 GWh |
| #5094 | Bob Wiley Detention Center | Visalia, CA | 2.8 GWh |
| #5095 | Harbor Road Solar 1 | Cheshire, MA | 2.7 GWh |
| #5096 | Summer Solar A2 | Lancaster, CA | 2.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Walleye (Dunn 2).
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Barron | Barron, WI | 382.0 MWh | 29.8 mi |
| Barron Solar Array | Barron, WI | 5.8 GWh | 29.4 mi |
| Bright Future | Hammond, WI | 361.0 MWh | 31.2 mi |
| Cedar Falls (WI) | Menomonie, WI | 30.9 GWh | 4.7 mi |
| Chippewa Falls | Chippewa Falls, WI | 56.1 GWh | 20.5 mi |
| Cornell | Chippewa Falls, WI | 69.9 GWh | 34.3 mi |
| Dells | Eau Claire, WI | 36.9 GWh | 17.4 mi |
| Downsville DPC Solar | Menomonee, WI | 1.7 GWh | 11.5 mi |
| Elk Mound | Elk Mound, WI | 466.0 MWh | 12.5 mi |
| Elk Mound (PV) | Elk Mound, WI | 653.0 MWh | 10.5 mi |
| Hay River (Dunn 1) | Boyceville, WI | 2.7 GWh | 9.9 mi |
| Jim Falls | Jim Falls, WI | 105.3 GWh | 26.5 mi |
| Lafayette DPC Solar | Chippewa Falls, WI | 1.6 GWh | 22.8 mi |
| Lake Hallie | Chippewa Falls, WI | 1.0 MWh | 21.2 mi |
| Menomonie | Menomonie, WI | 22.7 GWh | 8.6 mi |
| New Auburn DPC Solar | New Auburn, WI | 4.5 GWh | 24.4 mi |
| Next Generation | Woodville, WI | 331.0 MWh | 25.3 mi |
| Viresco Turtle Lake | Turtle Lake, WI | 8.5 GWh | 33.8 mi |
| Wheaton | Eau Claire, WI | 17.0 GWh | 15.3 mi |
| Wissota | Chippewa Falls, WI | 118.3 GWh | 22.8 mi |