Easton 2
8940 Glebe Park Drive, Easton, MD 21601Plant Summary Information
Easton 2 is ranked #12 out of 20 distillate fuel oil power plants in Maryland in terms of total annual net electricity generation.
Easton 2 is comprised of 8 generators and generated 1.7 GWh during the 3-month period between January 2025 to April 2025.
Plant Name | Easton 2 |
---|---|
Utility Name | Easton Utilities Comm |
Location | Talbot County, MD |
Initial Operation Date | March 1978 |
Last Update | Apr 2025 |
Annual Generation | 1.2 GWh |
Annual Consumption | 26.3 k MMBtu |
Ranked #11,131 out of 12,299 Power Plants Nationwide | |
Ranked #394 out of 1,230 Distillate Fuel Oil Power Plants Nationwide | |
Ranked #183 out of 195 Maryland Power Plants | |
Ranked #12 out of 20 Maryland Distillate Fuel Oil Power Plants | |
Fuel Types | Distillate Fuel Oil |
Map of Easton 2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Easton 2.
Monthly Net Generation for Easton 2
Easton 2 Details
Summary Information | |
---|---|
Plant Name | Easton 2 (4257) |
Plant Address | 8940 Glebe Park Drive, Easton, MD 21601 |
Utility | Easton Utilities Comm (5625) |
Latitude, Longitude | 38.795, -76.07 |
Generation Dates on File | Jan 2001 to Apr 2025 |
Initial Operation Date | March 1978 |
Annual Generation | 1.2 GWh |
Fuel Types | Distillate Fuel Oil |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Municipality |
Ash Impoundment | No |
Transmission / Distribution Owner | Easton Utilities Comm (5625) MD |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Generator 21 Details Operating March 1978
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 6.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 6.2 MW |
Winter Capacity | 6.2 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 1978 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 22 Details Operating March 1978
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 6.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 6.2 MW |
Winter Capacity | 6.2 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 1978 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 23 Details Operating June 1989
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 6.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 6.3 MW |
Winter Capacity | 6.3 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1989 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 24 Details Operating June 1989
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 6.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 6.3 MW |
Winter Capacity | 6.3 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1989 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 201 Details Operating May 1995
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1995 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 202 Details Operating May 1995
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1995 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 203 Details Operating November 2004
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 5.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 4.5 MW |
Winter Capacity | 5.1 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2004 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 204 Details Operating November 2004
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 5.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 4.5 MW |
Winter Capacity | 5.1 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2004 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Easton 2 Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#384 | Narrows Gas Turbines Generating | Brooklyn, NY | 39.6 GWh |
#385 | Angoon | Angoon, AK | 1.8 GWh |
#386 | E W Brown | Harrodsburg, KY | 1.5 TWh |
#387 | South Main Street | Rochelle, IL | 1.3 GWh |
#388 | Elim | Elim, AK | 1.3 GWh |
#389 | Marquette Energy Center | Marquette, MI | 162.2 GWh |
#390 | Kake | Kake, AK | 1.7 GWh |
#391 | Franklin Heating Station | Rochester, MN | 65.7 GWh |
#392 | Smithfield Packaged Meats Corp. | Kinston, NC | 1.2 GWh |
#393 | Ambler | Ambler, AK | 1.2 GWh |
#395 | Northway | Tok, AK | 1.2 GWh |
#396 | Covanta Haverhill | Haverhill, MA | 298.4 GWh |
#397 | Marshall Energy Facility | Calvert City, KY | 179.0 GWh |
#398 | Lincoln Combustion | Stanley, NC | 208.0 GWh |
#399 | VPPSA Project 10 | Swanton, VT | 1.2 GWh |
#400 | Mill Creek (SC) | Blacksburg, SC | 31.9 GWh |
#401 | Mountain View | Greencastle, PA | 25.6 GWh |
#402 | Manistique | Manistique, MI | 1.1 GWh |
#403 | AES Warrior Run Cogeneration Facility | Cumberland, MD | 726.4 GWh |
#404 | POET Biorefining Lake Crystal | Lake Crystal, MN | 7.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Easton 2.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ameresco Delaware Central | Sandtown, DE | 23.3 GWh | 24.9 mi |
Bd of Educ of Queen Anne's Cnty, Cnty HS | Centreville, MD | 2.6 GWh | 16.7 mi |
Bluegrass Solar | Church Hill, MD | 159.5 GWh | 27.2 mi |
Chesapeake College | Wye Mills, MD | 2.4 GWh | 11 mi |
Chester Woods Point Solar, LLC CSG | Chester, MD | 3.9 GWh | 16.3 mi |
Church Hill | Church Hill, MD | 7.4 GWh | 22 mi |
CNE at Cambridge MD | Cambridge, MD | 5.5 GWh | 19.5 mi |
Easton | Easton, MD | 202.0 MWh | 1.2 mi |
Federalsburg Energy Storage 1 LLC | Federaslburg, MD | 1.3 GWh | 22.1 mi |
Heimlich Solar | Greenwood, DE | 9.2 GWh | 25 mi |
MEBA | Easton, MD | 2.3 GWh | 4 mi |
Mustang One | Cambridge, MD | 3.0 GWh | 15.9 mi |
OER Checkerspot | Tracy's Landing, MD | 2.7 GWh | 27.2 mi |
Perdue Bridgeville Photovoltaic | Bridgeville, DE | 2.0 GWh | 25.3 mi |
Queen Anne's County | Centreville, MD | 2.6 GWh | 16.6 mi |
Rock Hall | Rock Hall, MD | 1.6 GWh | 25.7 mi |
Todd Solar | Hurlock, MD | 33.9 GWh | 17.8 mi |
UMCES Ground Mount | Cambridge, MD | 3.5 GWh | 15.1 mi |
Vienna Operations | Vienna, MD | 4.6 GWh | 25.1 mi |
Wye Mills VNEM CSG | Queen Anne, MD | 18.5 GWh | 10.1 mi |