Bond Solar
Mayzek St. & Gibson Rd., Summerton, SC 29148Plant Summary Information
Bond Solar is ranked #103 out of 125 solar farms in South Carolina in terms of total annual net electricity generation.
Bond Solar generated 605.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Bond Solar |
|---|---|
| Utility Name | Altus Power America Management, LLC |
| Location | Clarendon County, SC |
| Initial Operation Date | December 2018 |
| Last Update | Dec 2025 |
| Annual Generation | 3.5 GWh |
| Annual Consumption | 12.4 k MMBtu |
| Ranked #9,514 out of 13,301 Power Plants Nationwide | |
| Ranked #4,569 out of 7,209 Solar Power Plants Nationwide | |
| Ranked #162 out of 203 South Carolina Power Plants | |
| Ranked #103 out of 125 South Carolina Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Bond Solar, LLC (2017 to 2022) Altus Power America Management, LLC (2023 to 2025) |
Map of Bond Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bond Solar.
Monthly Net Generation for Bond Solar
Monthly Plant Fuel Consumption for Bond Solar
Bond Solar Details
| Summary Information | |
|---|---|
| Plant Name | Bond Solar (61941) |
| Plant Address | Mayzek St. & Gibson Rd., Summerton, SC 29148 |
| Utility | Altus Power America Management, LLC (60281) |
| Latitude, Longitude | 33.61719, -80.363 |
| Generation Dates on File | Dec 2018 to Dec 2025 |
| Initial Operation Date | December 2018 |
| Annual Generation | 3.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | QF16-101-002 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Duke Energy Progress East (CPLE) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Duke Energy Progress - (NC) (3046) SC |
| Grid Voltage | 22.86 kV |
| Energy Storage | No |
Generator 7 Details Operating December 2018
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 2 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 2 MW |
| Winter Capacity | 2 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2018 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 52 |
| DC Net Capacity | 2.5 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Bond Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #4559 | Venture 3 - 1C | Aurora, CO | 3.5 GWh |
| #4560 | KDC Solar TC Blandair Park LLC | West Friendship, MD | 3.5 GWh |
| #4561 | Otoe Solar Power Generation Station 1 LL | Apple Valley, CA | 3.5 GWh |
| #4562 | Bourne (MA) - Holliston I | Holliston, MA | 3.5 GWh |
| #4563 | Lebanon West Lebanon Solar 1 | Lebanon, ME | 3.5 GWh |
| #4564 | Hostetter Solar One, LLC | Hagerstown, MD | 3.5 GWh |
| #4565 | Desert Hot Springs Solar | Desert Hot Springs, CA | 3.5 GWh |
| #4566 | City & County of Denver at Denver Int'l | Denver, CO | 3.5 GWh |
| #4567 | Rodeo Solar D2 | Lancaster, CA | 3.5 GWh |
| #4568 | General Dynamics | Hampton, AR | 3.5 GWh |
| #4570 | Syncarpha El Rito | El Rito, NM | 3.5 GWh |
| #4571 | ELP Myer CSG | Ulster, NY | 3.5 GWh |
| #4572 | Cronin Road Solar 1, LLC CSG Hybrid | Warren, MA | 3.4 GWh |
| #4573 | Corcoran Irrigation District Floating So | Corcoran, CA | 3.5 GWh |
| #4574 | Kenansville Solar 2, LLC | Kenansville, NC | 3.5 GWh |
| #4575 | Copperfield | Troy, NC | 3.5 GWh |
| #4576 | Department of Justice | Sacramento, CA | 3.5 GWh |
| #4577 | Ridgeback | Liberty, NC | 3.5 GWh |
| #4578 | Morgan Solar 1b CSG | Meredosia, IL | 3.5 GWh |
| #4579 | Shelter Creek Condominiums Solar | San Bruno, CA | 3.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bond Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Abbot Solar | Manning, SC | 3.8 GWh | 8.2 mi |
| Bloom Solar | Summerton, SC | 3.8 GWh | 1.6 mi |
| Bonefish Solar | Manning, SC | 4.1 GWh | 12.2 mi |
| Cameron Solar | Cameron, SC | 38.8 GWh | 20 mi |
| Cameron Solar II | Cameron, SC | 7.3 GWh | 19.6 mi |
| Cross | Cross, SC | 8.2 TWh | 22.3 mi |
| Dorchester Biomass | Harleyville, SC | 150.0 GWh | 26.6 mi |
| Eastover Solar | Eastover, SC | 141.2 GWh | 26.4 mi |
| Huntley | Bowman, SC | 155.0 GWh | 25 mi |
| Jamison Solar Farm | Orangeburg, SC | 1.9 GWh | 27.4 mi |
| Kingstree West 115 | Greeleyville, SC | 23.6 GWh | 24.1 mi |
| Lone Star Solar | Cameron, SC | 177.5 GWh | 16 mi |
| Palmetto Plains | Bowman, SC | 126.5 GWh | 27.2 mi |
| Spillway | Pineville, SC | 4.8 GWh | 16.1 mi |
| St Stephen | St. Stephen, SC | 161.1 GWh | 28.2 mi |
| St. Matthews Solar | Matthews, SC | 16.6 GWh | 23.3 mi |
| Substation 20 Plant | Orangeburg, SC | 168.0 MWh | 30.2 mi |
| Sylvamo Corporation Eastover Facility | Eastover, SC | 542.4 GWh | 24.5 mi |
| TWE Bowman Solar Project | Bowman, SC | 129.7 GWh | 27.8 mi |
| Wateree | Eastover, SC | 2.5 TWh | 20.8 mi |